My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
IMCO General Construction 12/13/2022
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
IMCO General Construction 12/13/2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/30/2025 12:23:45 PM
Creation date
12/30/2022 2:22:28 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
IMCO General Construction
Approval Date
12/13/2022
Council Approval Date
11/2/2022
Department
Public Works
Department Project Manager
Zach Brown
Subject / Project Title
Water Filter Plant Portal 4 Improvements
Public Works WO Number
UP3755
Tracking Number
0003541
Total Compensation
$4,520,327.00
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
Document Relationships
IMCO General Construction 7/30/2025 Change Order 4
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
IMCO General Construction 9/5/2024 Change Order 2
(Contract)
Path:
\Records\City Clerk\Contracts\10 Years Then Transfer to State Archivist\2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
978
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> City of Everett 00 21 13 - 4 <br /> Water Filter Plant Portal 4 Improvements WO# 3755 1 <br /> 3. Both. I <br /> The Contractor shall bear all cost for such insurance as provided in the Contract <br /> Documents. <br /> No Claim shall be allowed because of any ambiguity in the Contract if: I <br /> 1. The Bidder discovers an ambiguity but fails to notify the City, or <br /> 2. The Bidder failed to discover a patent ambiguity that would be discovered <br /> by a reasonably prudent contractor in preparing its Bid. <br /> Any prospective Bidder desiring an explanation or interpretation of the Bid Documents, <br /> shall request the explanation or interpretation in writing by close of business seven <br /> business days preceding the Bid opening to allow a written reply to reach all prospective <br /> Bidders before the submission of their Bids. <br /> Bidder acknowledges that the Bidder has not relied on representation or warranty of the <br /> City not expressly included in the Contract Documents. <br /> The information provided by the City is not intended to be a substitute for, or a <br /> supplement to,the independent verification by the Bidder to the extent such independent <br /> investigation of the Drawings and Specifications or Site conditions is deemed necessary <br /> or desirable by the Bidder. Bidder acknowledges that they have not relied upon City or <br /> Engineer furnished information regarding site conditions in preparing and submitting a <br /> Bid. I <br /> 1-02.4(1)A Interpretation of Contract Documents <br /> Should a Bidder find what is believed to be discrepancies in or omissions from the <br /> Plans, Specifications, or any other Contract Document, or should the Bidder be in <br /> doubt as to their meaning, Bidder may submit to the City a written request for an <br /> interpretation thereof. The Bidder submitting the request will be responsible for its <br /> prompt delivery. Any interpretation of the documents, if made, will be made only by <br /> addendum duly issued. All requests for interpretations must be received by <br /> the City or Engineer no later than 7 calendar days prior to the bid opening <br /> date. All questions regarding the Contract Documents shall be referred to the City <br /> at the address provided in the Contract Documents. <br /> 1-02.4(1)B Prevailing Wages <br /> Bidder is directed to the Contract Documents for requirements regarding applying <br /> payment of prevailing wage rates for employment of labor on within Snohomish <br /> County. <br /> All laborers, workmen, or mechanics in each trade or occupation employed in the I <br /> performance of the Contract either by Contractor, Subcontractor, or other person <br /> doing Work shall be paid not less than the prevailing rate of wage as defined in <br /> RCW 39.12.010. Current prevailing wage rates may be found online at <br /> http://www.lni.wa.gov/TradesLicensing/PrevWage/WageRates/. The rules and <br /> regulations noted within the Contract Documents are available from: <br /> State of Washington Department of Labor and Industries <br /> Prevailing Wage Section <br /> PO Box 44540 <br /> Olympia, WA 98504-4540 <br /> (360) 902-5335 <br /> pw1@lni.wa.gov <br /> 1 <br /> 00 21 13 - 4 INSTRUCTIONS TO BIDDERS <br /> I <br />
The URL can be used to link to this page
Your browser does not support the video tag.