Laserfiche WebLink
City of Everett 00 72 00 - 59 <br /> Water Filter Plant Portal 4 Improvements WO# 3755 <br /> 16.3 PATENTS AND ROYALTIES <br /> ' Costs involved in fees,royalties,or claims for any patented invention,article,process or method that may <br /> be used upon or in a manner connected with the Work under this Contract or with use of completed Work <br /> by the Owner shall be paid by the Contractor. The Contractor and its sureties shall protect and hold the <br /> ' Owner,Owner's Representative,and Owner's Representative,together with its officers,agents,and <br /> employees,harmless from any and all loss,defense cost,and expenses and against any and all demands <br /> made for such fees or claims brought or made by the holder of any invention or patent. Before final <br /> ' payment is made on the account of this Contract,the Contractor shall, if requested by the Owner,furnish <br /> acceptable proof of a proper release from all such fees or claims. <br /> Should the Contractor,its agent,employee or any of them be enjoined from furnishing or using any <br /> ' invention,article,material or plans supplied or required to be supplied or used under this Contract, <br /> Contractor shall promptly pay such royalties and secure requisite licenses;or,subject to acceptance by <br /> Owner,substitute other articles,materials,or appliances in lieu thereof that are of equal efficiency, <br /> ' quality, finish, suitability and market value to those planned or required under the Contract. Descriptive <br /> information of these substitutions shall be submitted to the Owner's Representative for determination of <br /> general conformance to the design concept and the construction Contract. Should Owner elect to refuse <br /> the substitution,Contractor agrees to pay such royalties and secure such valid licenses as may be requisite <br /> for the Owner, its officers,agents and employees or any of them,to use such invention,article,material <br /> or appliance without being disturbed or in any way interfered with by any proceeding in law or equity on <br /> account thereof. <br /> ' 17. AUDITS <br /> 17.1 GENERAL <br /> The Contractor's records relating to this Project,including,but not limited to,wage,payroll,and cost <br /> records,shall be open to inspection or audit by representatives of the Owner during the Project and for a <br /> period of not less than six years after the date of Final Acceptance of the Contract. The Contractor shall <br /> retain these records for that period. The Contractor shall also guarantee that Project records of <br /> Subcontractors, Suppliers,and lower tier Subcontractors,including,but not limited to,the wage,payroll, <br /> ' and cost records,shall be retained and open to similar inspection or audit for the same period of time. <br /> The audit may be performed by employees or representatives of the Owner or by an auditor chosen by the <br /> Owner. The Contractor, Subcontractors,or lower tier Subcontractors shall provide adequate facilities, <br /> reasonably acceptable to auditor,for the audit during normal business hours. The Contractor, <br /> Subcontractors,or lower tier Subcontractors shall make a good faith effort to cooperate with the auditors. <br /> If an audit is to be commenced more than sixty(60)days after the Final Acceptance date of the Contract, <br /> the Contractor will be given twenty(20)days' notice of the time when the audit is to begin. If any <br /> ' litigation,claim,or audit arising out of,in connection with,or related to this Contract is initiated,the <br /> Project records shall be retained until the later of(a)completion of litigation,claim,or audit or(b)six <br /> years after the date of Final Acceptance. <br /> 17.2 CLAIMS <br /> All Contract Claims filed against the Owner shall be subject to audit at any time following the filing of <br /> the Contract Claim. Failure of the Contractor, Subcontractors,or lower tier Subcontractors to maintain <br /> and retain sufficient records to allow the auditors to verify all or a portion of the Contract Claim or to <br /> permit the auditor access to the books and records of the Contractor, Subcontractors,or lower tier <br /> Subcontractors shall constitute a waiver of a Contract Claim and shall bar any recovery thereunder. <br /> I <br /> 00 72 00 - 59 GENERAL CONDITIONS <br />