My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
IMCO General Construction 12/13/2022
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
IMCO General Construction 12/13/2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/30/2025 12:23:45 PM
Creation date
12/30/2022 2:22:28 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
IMCO General Construction
Approval Date
12/13/2022
Council Approval Date
11/2/2022
Department
Public Works
Department Project Manager
Zach Brown
Subject / Project Title
Water Filter Plant Portal 4 Improvements
Public Works WO Number
UP3755
Tracking Number
0003541
Total Compensation
$4,520,327.00
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
Document Relationships
IMCO General Construction 7/30/2025 Change Order 4
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
IMCO General Construction 9/5/2024 Change Order 2
(Contract)
Path:
\Records\City Clerk\Contracts\10 Years Then Transfer to State Archivist\2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
978
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> City of Everett 00 73 00 - 2 <br /> Water Filter Plant Portal 4 Improvements WO# 3755 I <br /> 4.1 Contractor will be required to provide a project schedule that clearly defines each phase <br /> of work including planned facility closure(s), length of time area(s) is/are to be <br /> closed, and projected reopening of affected area(s), I <br /> 4.2 Work Hours: The Contractor shall provide work schedule. I <br /> A. Work hours are limited to the following hours: <br /> 1. 6:00 AM to 6:00 PM on weekdays. I <br /> 2. As approved by Owner's Representative on weekends and state recognized <br /> holidays. <br /> 4.3 Be aware that all construction sites will be monitored and violators are subject to fines. I <br /> 4.4 Other hours may be considered on a limited basis without interruption of Owner's normal I <br /> operations. All requests for working hours other than those stated above shall be made <br /> exclusively through the Owner's Representative. ' <br /> PART 5 -OWNER OCCUPATION AND OPERATIONS <br /> I <br /> 5.1 Owner intends for uninterrupted water filter plant operations to continue during all <br /> construction work. I <br /> A. The Contractor shall coordinate with Owner in scheduling construction activities to <br /> minimize conflict with water filter plant operations. <br /> END OF SECTION 00 73 00 <br /> I <br /> I <br /> I <br /> I <br /> I <br /> 00 73 00 - 2 SPECIAL CONDITIONS <br />
The URL can be used to link to this page
Your browser does not support the video tag.