IMCO General Construction 12/13/2022
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
IMCO General Construction 12/13/2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/30/2025 12:23:45 PM
Creation date
12/30/2022 2:22:28 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
IMCO General Construction
Approval Date
12/13/2022
Council Approval Date
11/2/2022
Department
Public Works
Department Project Manager
Zach Brown
Subject / Project Title
Water Filter Plant Portal 4 Improvements
Public Works WO Number
UP3755
Tracking Number
0003541
Total Compensation
$4,520,327.00
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
Document Relationships
IMCO General Construction 7/30/2025 Change Order 4
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
IMCO General Construction 9/5/2024 Change Order 2
(Contract)
Path:
\Records\City Clerk\Contracts\10 Years Then Transfer to State Archivist\2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
978
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Everett 01 11 00 - 1 <br /> ' Water Filter Plant Portal 4 Improvements WO#3755 <br /> SECTION 01 11 00 -SUMMARY OF WORK <br /> 1.1 SCOPE OF WORK <br /> ' A. The Work specified for this contract consists of installation of a new medium <br /> voltage electrical cable delivering power to Portal 4 from the water filtration plant <br /> ' (WFP), improvements within the Portal 4 structure include replacement of <br /> electrical equipment, installation of new motorized actuators on three existing <br /> valves, HVAC, architectural, and building security improvements, replacement of <br /> a level sensing device, and covering a section of exposed open channel with <br /> fiberglass reinforced panels. Additional improvements include installation of <br /> isolation valves and valve vaults on three existing large diameter buried <br /> transmission lines and installation of a security fence around the structure. The <br /> work generally includes, but shall not be limited to the following: <br /> 1. Selective demolition of Portal 4 architectural fixtures, cleaning and selective <br /> coating of structural elements, panel caulking and sealing, removal of existing <br /> electric actuator. <br /> 2. Installation of security fencing and gates, site grading and backfill, remove and <br /> reinstall Ecoblocks. <br /> ' 3. Structural and architectural improvements. Replace architectural fixtures, install <br /> fiberglass reinforced panels over Portal 4 channel, and construct valve vaults on <br /> three transmission lines. <br /> 4. Installation of new HVAC ducts, exhaust fans, supply fans, and plenums. <br /> 5. Installation of new medium voltage electrical cable, replacement of select <br /> electrical equipment (transformers and panel boards), and instrumentation. <br /> Upgrades to security and the control system. <br /> ' 6. Installation of three of electric actuators on the existing butterfly valves within <br /> Portal 4. <br /> 7. Construction of three cast in place valve vaults and installation of isolation valves <br /> on buried transmission lines 2, 3, and 4. Installation of isolation valves includes <br /> cutting in or replacing sections of existing steel and concrete cylinder pipe and <br /> installing drain valves and piping. <br /> 1.2 CONTRACTOR'S USE OF SITE AND PREMISES <br /> A. The Contractor shall assume full responsibility for protection and safekeeping of <br /> products under this Contract. <br /> ' B. The Contractor shall obtain and pay for use of any additional parking, storage or <br /> work areas needed for his/her operations. <br /> I <br /> 01 11 00 - 1 SUMMARY OF WORK <br />