IMCO General Construction 12/13/2022
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
IMCO General Construction 12/13/2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/30/2025 12:23:45 PM
Creation date
12/30/2022 2:22:28 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
IMCO General Construction
Approval Date
12/13/2022
Council Approval Date
11/2/2022
Department
Public Works
Department Project Manager
Zach Brown
Subject / Project Title
Water Filter Plant Portal 4 Improvements
Public Works WO Number
UP3755
Tracking Number
0003541
Total Compensation
$4,520,327.00
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
Document Relationships
IMCO General Construction 7/30/2025 Change Order 4
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
IMCO General Construction 9/5/2024 Change Order 2
(Contract)
Path:
\Records\City Clerk\Contracts\10 Years Then Transfer to State Archivist\2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
978
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Everett 01 11 00 -2 <br /> Water Filter Plant Portal 4 Improvements WO# 3755 ' <br /> C. The Contractor shall limit the construction activities to the areas indicated on the <br /> Drawings. <br /> D. Construction Plan: Before the start of construction, provide a construction plan <br /> regarding access to Work, use of Site, proposed laydown areas and utility <br /> outages for acceptance by the City. After acceptance of the plan, construction <br /> operations shall comply with the accepted plan unless deviations are accepted <br /> by the City in writing. <br /> 1.3 WORK HOURS <br /> A. Contractor will be required to provide a project schedule that clearly defines each <br /> phase of work and the work hours associated with each phase. <br /> B. The Work site is available from 6:00 AM — 6:00 PM during the work week (M-F) r <br /> excluding City observed holidays unless otherwise approved by the City's Project <br /> Manager. Any additional or alternate work hours will require advance approval <br /> and coordination with the City's Project Manager. <br /> C. The Water Filter Plant (WFP) is operated 24/7 and access to the work area must <br /> be available to plant staff during the project. The Contractor will have access to <br /> Portal 4, Flocculation Basin Electrical Room, and other areas noted on the Plans <br /> to perform the Work. Contractor will not be permitted access to buildings or other 111 <br /> treatment facilities within the WFP boundary unless required as a part of the <br /> Work. <br /> 1.4 WORK SEQUENCE <br /> A. Work in stages in order to accommodate Owner's use requirements during the <br /> construction period. <br /> B. Contractor must field verify connection points including inspection, potholing, <br /> excavation and exposure of existing pipelines to confirm the horizontal and <br /> vertical alignment. Field verification, including survey, must be completed and <br /> submitted prior to submittal of Lay drawings and procurement of materials. I <br /> C. Coordinate construction schedule and operations with Owner. <br /> I <br /> 01 11 00 - 2 SUMMARY OF WORK <br />