My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
IMCO General Construction 12/13/2022
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
IMCO General Construction 12/13/2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/30/2025 12:23:45 PM
Creation date
12/30/2022 2:22:28 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
IMCO General Construction
Approval Date
12/13/2022
Council Approval Date
11/2/2022
Department
Public Works
Department Project Manager
Zach Brown
Subject / Project Title
Water Filter Plant Portal 4 Improvements
Public Works WO Number
UP3755
Tracking Number
0003541
Total Compensation
$4,520,327.00
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
Document Relationships
IMCO General Construction 7/30/2025 Change Order 4
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
IMCO General Construction 9/5/2024 Change Order 2
(Contract)
Path:
\Records\City Clerk\Contracts\10 Years Then Transfer to State Archivist\2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
978
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> City of Everett 00 21 13 - 10 <br /> Water Filter Plant Portal 4 Improvements WO# 3755 <br /> Within 5 days after the opening of Bids, a Bidder who wishes to claim error shall submit a <br /> notarized affidavit signed by the Bidder, accompanied by original work sheets used in the <br /> preparation of the Bid, requesting relief from the responsibilities of Award. The affidavit <br /> shall describe the specific error(s) and certify that the work sheets are the originals used <br /> in the preparation of the Bid. The Engineer will review the certified work sheets to <br /> determine the validity of the claimed error and make recommendation to the City. If the <br /> City concurs in the claim of error, the Bidder will be relieved of responsibility, and the bid <br /> deposit of the Bidder will be returned. Thereafter, at the discretion of the City, all Bids may <br /> be rejected or Award made to next lowest and responsive Bidder. <br /> 1-03.1(2) Preference for Resident Contractors I <br /> In accordance with RCW 39.04.380, if a Bid is received from a nonresident contractor <br /> from a state that provides a percentage bidding preference and does not have an <br /> office located in Washington, then a comparable percentage disadvantage will be <br /> applied to the Bid of that nonresident contractor. <br /> 1-03.1(3) Tie Bids <br /> After opening Bids, if two or more lowest responsive and responsible Bid totals are <br /> exactly equal, then the tie-breaker will be determined by drawing as described in this <br /> section. Two or more slips of paper will be marked as follows: one marked "Winner" and <br /> the other(s)marked "unsuccessful". The slips will be folded to make the marking unseen. <br /> The slips will be placed inside a box. One authorized representative of each Bidder shall <br /> draw a slip from the box. Bidders shall draw in alphabetic order by the name of the firm <br /> as registered with the Washington State Department of Licensing. The slips shall be <br /> unfolded and the firm with the slip marked "Winner" will be determined to be the <br /> successful Bidder and eligible for Award of the Contract. Only those Bidders who <br /> submitted a Bid total that is exactly equal to the lowest responsive Bid are eligible to <br /> draw. I <br /> 1-03.2 Award of Contract <br /> Within 45 days after the opening of Bids, the City will act either to accept the Bid from the <br /> lowest responsive, responsible Bidder, or to reject all Bids. The City reserves the right to <br /> request extensions of such Bid acceptance period. If the lowest responsible Bidder and <br /> the City cannot agree on an extension by the 45 day deadline, the City reserves the right <br /> to award the Contract to the next lowest responsible Bidder or reject all Bids. <br /> The acceptance of a Bid will be evidenced by a written Notice of Award of Contract <br /> delivered in person or by certified mail to the Bidder whose Bid is accepted, together with <br /> a request to furnish a Contract Bond and evidence of insurance and to execute the <br /> Contract set forth in the Contract Documents. No Contract is formed until the Contract <br /> Execution Date. I <br /> 1-03.3 Execution of Contract <br /> Successful Bidder has 14 calendar days after receiving the Notice of Award to submit the <br /> following documents to the City: <br /> • Two executed copies of the Contract. <br /> • Two original payment bonds and two original performance bonds submitted <br /> on forms contained in Contract Documents. <br /> • Certificate of Insurance and additional insured endorsements in accordance <br /> with the Contract Documents. <br /> 00 21 13 - 10 INSTRUCTIONS TO BIDDERS <br />
The URL can be used to link to this page
Your browser does not support the video tag.