My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
IMCO General Construction 12/13/2022
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
IMCO General Construction 12/13/2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/30/2025 12:23:45 PM
Creation date
12/30/2022 2:22:28 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
IMCO General Construction
Approval Date
12/13/2022
Council Approval Date
11/2/2022
Department
Public Works
Department Project Manager
Zach Brown
Subject / Project Title
Water Filter Plant Portal 4 Improvements
Public Works WO Number
UP3755
Tracking Number
0003541
Total Compensation
$4,520,327.00
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
Document Relationships
IMCO General Construction 7/30/2025 Change Order 4
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
IMCO General Construction 9/5/2024 Change Order 2
(Contract)
Path:
\Records\City Clerk\Contracts\10 Years Then Transfer to State Archivist\2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
978
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> City of Everett 00 21 13 - 9 <br /> Water Filter Plant Portal 4 Improvements WO# 3755 <br /> If the City determines the Bidder does not meet the mandatory bidder responsibility <br /> criteria in RCW 39.04.350(1) and is therefore not a responsible Bidder, the City shall <br /> notify the Bidder in writing, with the reasons for its determination. If the Bidder disagrees <br /> with this determination, it may appeal the determination within two business days of the <br /> City's determination by presenting its appeal and any additional information to the City. <br /> The City will consider the appeal and any additional information before issuing its final <br /> determination. If the final determination affirms that the Bidder is not responsible, the <br /> City will not execute a contract with any other Bidder until at least two business days <br /> after the Bidder determined to be not responsible has received the City's final <br /> determination. <br /> If the Contract Documents contain supplemental responsibility criteria, then a Bidder will <br /> be deemed not responsible if the Bidder does not meet those criteria, all as set forth in <br /> 1 SECTION 00 2213, SUPPLEMENTAL INSTRUCTIONS TO BIDDERS. <br /> 1-02.15 Pre-Award Information <br /> Before awarding any contract, the City may require one or more of these items or actions <br /> of the apparent lowest responsible Bidder: <br /> 1. A complete statement of the origin, composition, and manufacture of any or <br /> all materials to be used, <br /> 2. Samples of these materials for quality and fitness tests, <br /> 3. A progress schedule, in a form the City requires, showing the order of and <br /> time required for the various phases of the Work, <br /> 4. A breakdown of costs assigned to any bid item, <br /> 5. Attendance at a conference with the Engineer or representatives of the <br /> Engineer, <br /> 6. Obtain, and furnish a copy of, a business license to do business in the City of <br /> Everett. <br /> 7. A copy of State of Washington Contractor's Registration, or <br /> 8. Any other information or action taken that is deemed necessary to ensure that <br /> the Bidder is the lowest responsible bidder. <br /> After Bid opening, but prior to award, the apparent successful Bidder shall, if requested <br /> by the City, attend a pre-award conference to respond to questions by the City regarding <br /> evaluation of Bids. The City will emphasize items such as insurance and bonding that <br /> will assist in prompt issuance of the Notice to Proceed. By conducting a pre-award <br /> conference, the City has not thereby waived its right to make determinations regarding <br /> responsiveness and responsibility of the Bidder. <br /> 1-03 AWARD AND EXECUTION OF CONTRACT <br /> 1-03.1 Consideration of Bids <br /> Bids will be evaluated by the City to determine which bid is the lowest responsive bid by <br /> a responsible bidder and which bid, if any, should be accepted in the best interest of the <br /> ' City. The right is reserved by the City to waive informalities in the bidding, accept a Bid of <br /> the lowest responsible Bidder, reject any or all Bids, republish the call for Bids, revise or <br /> cancel the Work, or require the Work to be done in another way if the best interest of the <br /> City is served. <br /> I <br /> 00 21 13 - 9 INSTRUCTIONS TO BIDDERS <br /> I <br />
The URL can be used to link to this page
Your browser does not support the video tag.