My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
IMCO General Construction 12/13/2022
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
IMCO General Construction 12/13/2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/30/2025 12:23:45 PM
Creation date
12/30/2022 2:22:28 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
IMCO General Construction
Approval Date
12/13/2022
Council Approval Date
11/2/2022
Department
Public Works
Department Project Manager
Zach Brown
Subject / Project Title
Water Filter Plant Portal 4 Improvements
Public Works WO Number
UP3755
Tracking Number
0003541
Total Compensation
$4,520,327.00
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
Document Relationships
IMCO General Construction 7/30/2025 Change Order 4
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
IMCO General Construction 9/5/2024 Change Order 2
(Contract)
Path:
\Records\City Clerk\Contracts\10 Years Then Transfer to State Archivist\2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
978
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Everett 00 41 13- 2 <br /> Water Filter Plant Portal 4 Improvements WO# 3755 <br /> B. <br /> ITEM ESTIMATED UNIT CONTRACT <br /> NO. DESCRIPTION UNIT QUANTITY PRICE PRICE <br /> Mobilization and I <br /> 1. Demobilization LS 1 N/A $20(6,0D0 DO. <br /> Interior and exterior <br /> improvements to the <br /> Portal 4 structure and <br /> equipment. This work <br /> includes selective <br /> demolition of <br /> architectural and <br /> security fixtures, <br /> cleaning and selective <br /> coating of structural <br /> elements, cleaning <br /> interior and exterior <br /> louvers, pressure <br /> washing and cleaning <br /> interior and exterior <br /> building wall panels <br /> (including roof fascia), <br /> 2. wall panel caulking and LS 1 N/A $Ii4Dt.01z 06 <br /> sealing, removal of <br /> existing FRP fixtures <br /> and selective demolition <br /> for the installation of <br /> new panels over the <br /> Portal 4 channel, door <br /> and hardware upgrades, <br /> replacement of a level <br /> sensing and transmitting <br /> device, instrumentation <br /> panel upgrades, <br /> installation of HVAC <br /> equipment, and <br /> replacement of three <br /> valve actuators with <br /> single phase electrical <br /> actuators. <br /> Addition of exterior <br /> building security <br /> features including <br /> 3. installation of security LS 1 N/A $ 2)3,000. 00 <br /> fence around the <br /> perimeter of the Portal 4 <br /> structure. <br /> I <br /> 00 41 13 - 2 BID FORM (Addendum 1) <br /> Provided to Builders Exchange of WA, Inc. For usage Conditions Agreement see www.bxwa.com - Always Verify Scal <br />
The URL can be used to link to this page
Your browser does not support the video tag.