My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
IMCO General Construction 12/13/2022
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
IMCO General Construction 12/13/2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/30/2025 12:23:45 PM
Creation date
12/30/2022 2:22:28 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
IMCO General Construction
Approval Date
12/13/2022
Council Approval Date
11/2/2022
Department
Public Works
Department Project Manager
Zach Brown
Subject / Project Title
Water Filter Plant Portal 4 Improvements
Public Works WO Number
UP3755
Tracking Number
0003541
Total Compensation
$4,520,327.00
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
Document Relationships
IMCO General Construction 7/30/2025 Change Order 4
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
IMCO General Construction 9/5/2024 Change Order 2
(Contract)
Path:
\Records\City Clerk\Contracts\10 Years Then Transfer to State Archivist\2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
978
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> City of Everett 00 41 13- 3 <br /> I Water Filter Plant Portal 4 Improvements WO# 3755 <br /> I <br /> ITEM ESTIMATED UNIT CONTRACT <br /> NO. DESCRIPTION UNIT QUANTITY PRICE PRICE <br /> Replacement of <br /> I approximately 2.9 miles <br /> of existing single phase <br /> medium voltage <br /> electrical cable and So <br /> 4' supporting electrical LF 35,000 $ 1 0 .00 $ 3 n,06 <br /> equipment. Actual <br /> quantity will be based <br /> I on final installed length <br /> of electrical cable. <br /> 1 S Subsurface Field LS 1 N/A $Z I n nt7 .00 <br /> Verification (SUE) <br /> Installation of proposed <br /> I pipe sections and a 36- <br /> inch diameter isolation <br /> valve on transmission <br /> I line 2. Construction of a <br /> 6 cast in place concrete LS 1 N/A sit`i�M. 00 <br /> valve vault on I <br /> transmission line 2. <br /> Earthwork is assumed <br /> incidental to the <br /> proposed pipeline <br /> Iimprovements. <br /> Installation of proposed <br /> I pipe sections and a 36- <br /> inch diameter isolation <br /> valve on transmission <br /> line 3. Construction of a <br /> I 7 cast in place concrete LS 1 N/A $�}1s�00a Da <br /> valve vault on <br /> transmission line 3. <br /> I Earthwork is assumed <br /> incidental to the <br /> proposed pipeline <br /> Iimprovements. <br /> I <br /> I <br /> I <br /> 00 41 13 - 3 BID FORM (Addendum 1) <br /> I <br /> Provided to Builders Exchange of WA, Inc. For usage Conditions Agreement see www.bxwa.com - Always Verify Scal <br />
The URL can be used to link to this page
Your browser does not support the video tag.