Laserfiche WebLink
f <br /> ' City of Everett 00 41 13- 5 <br /> Water Filter Plant Portal 4 Improvements WO# 3755 <br /> B. If this Bid is accepted by the Owner within the time period stated above, we will: <br /> Execute the Agreement within 14 days of receipt of Notice of Award. <br /> Furnish the required 100% payment and 100% performance bonds within 14 calendar days of <br /> receipt of Notice of Award in the form described in Contract Documents. <br /> ' Commence Work within seven calendar days after receipt of Notice to Proceed. <br /> C. If this Bid is accepted within the indicated time, and we fail to commence the Work or we <br /> ' fail to provide the required bonds, the Bid security shall be forfeited as damages to the <br /> Owner by reason of our failure, limited in amount to the lesser of the face value of the <br /> Bid security or the difference between this Bid and the Bid upon which Contract is <br /> signed. <br /> D. In the event our Bid is not accepted within the time stated above, the required Bid <br /> security will be returned to the undersigned, according to the provisions of the <br /> Instructions to Bidders, unless a mutually satisfactory arrangement is made for its <br /> retention and validity for an extended period of time. <br /> 1.9 CONTRACT TIME <br /> A. If this Bid is accepted, we will: <br /> Begin work immediately after receiving Owner's letter of Notice to Proceed and to reach <br /> Substantial Completion within the dates required under the Contract Documents. <br /> Agree to pay liquidated damages to the City as stated in the Contract in the event the project is <br /> not completed on or before required time periods. <br /> Contract with the Owner using the Contract form provided herewith, on the terms and conditions <br /> contained herein, to do everything necessary to complete the construction of the project in the <br /> allotted time. <br /> 1 1.10 ADDENDA <br /> A. Following Addenda have been received, and the modifications to the Bid Documents <br /> noted below have been considered and all costs are included in the Bid. <br /> Addendum No #i dated September 30, 2022 <br /> Addendum No d , dated OcrosER 5, Zozz <br /> Addendum No , dated <br /> Addendum No , dated <br /> 1.11 BIDDER CERTIFICATIONS <br /> A. Bidder, at the time of submitting this Bid and throughout the period of the contract, will <br /> remain licensed by the state of Washington to perform the type of work required under <br /> the Contract Documents. <br /> B. Bidder is skilled and regularly engaged in the general class and type of work required by <br /> the Contract Documents and has the capability to successfully manage construction <br /> projects. <br /> I <br /> 00 41 13 - 5 BID FORM (Addendum 1) <br /> I <br /> Provided to Builders Exchange of WA, Inc. For usage Conditions Agreement see www.bxwa.com - Always Verify Scal <br />