My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
IMCO General Construction 12/13/2022
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
IMCO General Construction 12/13/2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/30/2025 12:23:45 PM
Creation date
12/30/2022 2:22:28 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
IMCO General Construction
Approval Date
12/13/2022
Council Approval Date
11/2/2022
Department
Public Works
Department Project Manager
Zach Brown
Subject / Project Title
Water Filter Plant Portal 4 Improvements
Public Works WO Number
UP3755
Tracking Number
0003541
Total Compensation
$4,520,327.00
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
Document Relationships
IMCO General Construction 7/30/2025 Change Order 4
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
IMCO General Construction 9/5/2024 Change Order 2
(Contract)
Path:
\Records\City Clerk\Contracts\10 Years Then Transfer to State Archivist\2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
978
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> City of Everett 004113- 4 I <br /> Water Filter Plant Portal 4 Improvements WO# 3755 <br /> ITEM ESTIMATED UNIT CONTRACT I <br /> NO. DESCRIPTION UNIT QUANTITY PRICE PRICE <br /> Installation of proposed <br /> pipe sections and a 36- ' <br /> inch diameter isolation <br /> valve on transmission <br /> line 4. Construction of a , <br /> 8 cast in place concrete LS 1 N/A $1{61� 000 . ao <br /> valve vault on — <br /> transmission line 4. <br /> Earthwork is assumed <br /> incidental to the <br /> proposed pipeline <br /> improvements. I <br /> 9. Site Erosion Control FA 1 N/A $8,000 <br /> Removal and Relocation I <br /> 10. of Eco-Block wall, LS 1 N/A $$ti 0 a 0 .Ud <br /> Foundation and i — <br /> Subdrain I <br /> Setup, testing, and <br /> commissioning of <br /> 11. proposed mechanical LS 1 N/A $Ilo,200 .00 <br /> and electrical <br /> equipment. <br /> 12. Trench Safety System LS 1 N/A $L34An) .oo I <br /> Force Account <br /> 13. _ N/A N/A $100,000 <br /> (Section 00 72 00) <br /> SUBTOTAL $1 I,46,00 <br /> I <br /> Washington State Sales Tax $3S4 I I 2., ,o <br /> @ 8.5% <br /> TOTAL BID $ u1,S 2.o.'2 Z 1.O° I <br /> 1.8 ACCEPTANCE I <br /> A. This offer shall be open to acceptance and is irrevocable for 45 days from the Bid closing <br /> date. <br /> I <br /> I <br /> 00 41 13 - 4 BID FORM (Addendum 1) <br /> I <br /> Provided to Builders Exchange of WA, Inc. For usage Conditions Agreement see www.bxwa.com - Always Verify Scal <br />
The URL can be used to link to this page
Your browser does not support the video tag.