My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
IMCO General Construction 12/13/2022
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
IMCO General Construction 12/13/2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/13/2024 11:18:31 AM
Creation date
12/30/2022 2:22:28 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
IMCO General Construction
Approval Date
12/13/2022
Council Approval Date
11/2/2022
Department
Public Works
Department Project Manager
Zach Brown
Subject / Project Title
Water Filter Plant Portal 4 Improvements
Public Works WO Number
UP3755
Tracking Number
0003541
Total Compensation
$4,520,327.00
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
Document Relationships
IMCO General Construction 9/5/2024 Change Order 2
(Contract)
Path:
\Records\City Clerk\Contracts\10 Years Then Transfer to State Archivist\2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
978
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> 1 <br /> 0135 29 HEALTH AND SAFETY C.Gish <br /> 0135 53 SECURITY PROCEDURES C. Gish <br /> 111 <br /> 0142 00 REFERENCES C. Gish <br /> 0145 00 QUALITY CONTROL C. Gish <br /> 0145 23 TESTING AND INSPECTION SERVICES C.Gish <br /> 0150 00 TEMPORARY FACILITIES AND ENVIRONMENTAL CONTROLS C. Gish <br /> 0157 13 TEMPORARY EROSION AND SEDIMENT CONTROL C. Gish <br /> 01 60 00 MATERIALS AND EQUIPMENT C.Gish I <br /> 01 61 45 AREA EXPOSURE DESIGNATIONS C. Gish <br /> 01 72 29 CUTTING AND PATCHING C. Gish <br /> 01 73 24 DESIGN REQUIREMENTS FOR NON-STRUCTURAL COMPONENTS R. Mantz I <br /> AND NON-BUILDING STRUCTURES <br /> 01 74 23 FINAL CLEANING C. Gish <br /> 01 77 00 CLOSEOUT PROCEDURES C. Gish I <br /> 01 78 23 OPERATION AND MAINTENANCE DATA C.Gish <br /> 01 78 36 WARRANTIES AND BONDS C. Gish <br /> 01 78 39 PROJECT RECORD DOCUMENTS C. Gish I <br /> 01 79 00 DEMONSTRATION AND TRAINING C.Gish <br /> 01 91 00 COMMISSIONING,TESTING AND START-UP C. Gish <br /> 0199 90 REFERENCE FORMS C. Gish <br /> VOLUME 2 SPECIFICATIONS <br /> DIVISION 02 EXISTING CONDITIONS Engineer of <br /> Record <br /> 02 4100 DEMOLITION AND SALVAGE C. Gish <br /> DIVISION 03 CONCRETE <br /> 03 11 00 CONCRETE FORMING R. Mantz I <br /> 03 20 00 CONCRETE REINFORCING R. Mantz <br /> 03 30 00 CAST-IN-PLACE CONCRETE R. Mantz <br /> 03 60 00 GROUTING R. Mantz <br /> DIVISION 05 METALS <br /> 05 05 14 HOT-DIP GALVANIZING M. Bray I <br /> 05 05 20 ANCHOR BOLTS R. Mantz <br /> 05 52 10 ALUMINUM RAILINGS R. Mantz <br /> 05 53 10 METAL GRATINGS AND STAIR TREADS R. Mantz <br /> DIVISION 06 WOOD, PLASTICS,AND COMPOSITES <br /> 06 71 10 FIBERGLASS REINFORCED PRODUCTS AND FABRICATIONS R. Mantz I <br /> 06 74 13 FIBERGLASS REINFORCED GRATINGS R. Mantz <br /> 06 83 20 FIBERGLASS REINFORCED FLAT COVERS R. Mantz <br /> Addendum 1 I <br /> Everett WFP Portal 4 Improvements Table of Contents <br /> Project No. 156839 2 <br /> I <br />
The URL can be used to link to this page
Your browser does not support the video tag.