My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
IMCO General Construction 12/13/2022
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
IMCO General Construction 12/13/2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/13/2024 11:18:31 AM
Creation date
12/30/2022 2:22:28 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
IMCO General Construction
Approval Date
12/13/2022
Council Approval Date
11/2/2022
Department
Public Works
Department Project Manager
Zach Brown
Subject / Project Title
Water Filter Plant Portal 4 Improvements
Public Works WO Number
UP3755
Tracking Number
0003541
Total Compensation
$4,520,327.00
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
Document Relationships
IMCO General Construction 9/5/2024 Change Order 2
(Contract)
Path:
\Records\City Clerk\Contracts\10 Years Then Transfer to State Archivist\2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
978
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> I <br /> DIVISION 08 OPENINGS <br /> I08 91 19 FIXED LOUVERS T.Gatlin <br /> DIVISION 09 FINISHES <br /> I 09 90 00 09 96 34 PAINTING AND COATING M. Bray <br /> AWWA C216 HEAT SHRINKABLE POLYOLEFIN COATINGS R. Davies <br /> I DIVISION 23 HEATING,VENTILATING,AND AIR CONDITIONING(HVAC) <br /> 23 00 00 HEATING,VENTILATING,AND AIR CONDITIONING(HVAC) BASIC T. Gatlin <br /> REQUIREMENTS <br /> I 23 05 93 TESTING,ADJUSTING,AND BALANCING FOR HVAC T.Gatlin <br /> 23 30 00 SHEET METAL DUCTWORK AND ACCESSORIES T.Gatlin <br /> 23 31 16.16 THERMOSET FIBERGLASS REINFORCED PLASTIC DUCTS T.Gatlin <br /> III <br /> 23 34 00 HVAC FANS T. Gatlin <br /> DIVISION 26 ELECTRICAL <br /> 1 26 05 00 COMMON WORK RESULTS FOR ELECTRICAL D.Tucker <br /> 26 05 13 MEDIUM-VOLTAGE CABLES D.Tucker <br /> I 26 05 19 LOW-VOLTAGE ELECTRICAL POWER CONDUCTORS AND CABLES D.Tucker <br /> 26 05 26 GROUNDING AND BONDING FOR ELECTRICAL SYSTEMS D.Tucker <br /> 26 05 33 RACEWAYS AND BOXES FOR ELECTRICAL SYSTEMS D.Tucker <br /> I 26 05 74 ARC FLASH HARZARD ANALYSIS,SHORT CIRCUIT STUDY AND D.Tucker <br /> PROTECTIVE DEVICE COORDINATION REPORT <br /> 26 08 00 COMMISSIONING OF ELECTRICAL SYSTEMS D.Tucker <br /> i 26 12 16 DRY-TYPE MEDIUM-VOLTAGE TRANSFORMERS D.Tucker <br /> 26 24 16 PANELBOARDS D.Tucker <br /> 26 27 26 WIRING DEVICES D.Tucker <br /> IDIVISION 28 ELECTRONIC SAFETY AND SECURITY <br /> I <br /> 28 10 00 ACCESS CONTROL AND MONITORING L. Lubke <br /> DIVISION 31 EARTHWORK <br /> 3123 00 EXCAVATION AND FILL R. Davies <br /> I 31 23 19 DEWATERING R. Davies <br /> 31 CRIBBING,SHEETING AND SHORING R. Davies <br /> IDIVISION 32 EXTERIOR IMPROVEMENTS <br /> 32 31 13 CHAIN LINK FENCES AND GATES R. Davies <br /> IDIVISION 33 UTILITIES <br /> 33 05 05 SELECTIVE DEMOLITION OF UTILITIES R. Davies <br /> 33 05 30 SETTLEMENT MONITORING R. Davies <br /> 33 42 00 STORMWATER CONVEYANCE R. Davies <br /> IAddendum 1 <br /> Everett WFP Portal 4 Improvements Table of Contents <br /> Project No. 156839 3 <br /> I <br />
The URL can be used to link to this page
Your browser does not support the video tag.