My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
IMCO General Construction 12/13/2022
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
IMCO General Construction 12/13/2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/30/2025 12:23:45 PM
Creation date
12/30/2022 2:22:28 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
IMCO General Construction
Approval Date
12/13/2022
Council Approval Date
11/2/2022
Department
Public Works
Department Project Manager
Zach Brown
Subject / Project Title
Water Filter Plant Portal 4 Improvements
Public Works WO Number
UP3755
Tracking Number
0003541
Total Compensation
$4,520,327.00
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
Document Relationships
IMCO General Construction 7/30/2025 Change Order 4
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
IMCO General Construction 9/5/2024 Change Order 2
(Contract)
Path:
\Records\City Clerk\Contracts\10 Years Then Transfer to State Archivist\2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
978
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> City of Everett 00 72 00 - 1 <br /> I <br /> Water Filter Plant Portal 4 Improvements WO# 3755 <br /> I1. GENERAL INFORMATION <br /> 1.1 DEFINITIONS OF WORDS AND TERMS <br /> I Where used in the Contract Documents,the following words and terms shall have the meanings indicated. <br /> The meanings shall be applicable to the singular,plural,masculine and feminine of all words and terms. <br /> Addenda: Written or graphic instruments issued prior to the opening of Bids that clarify,correct,or <br /> I change the Bidding Requirements or the proposed Contract Documents. <br /> Additive:A supplemental unit of work or group of bid items,identified separately in the Bid Form,that <br /> may,at the discretion of the City,be awarded in addition to the base Bid. <br /> I Alternative or Alternate: One of two or more units of Work or groups of bid items,identified separately <br /> in the Bid Form, from which the City may make a choice between different methods or material of <br /> construction for performing the same Work. <br /> IApplication for Payment: Form acceptable to Owner that Contractor is to use during the course of the <br /> Work in requesting progress or final payments that is to be accompanied by such supporting <br /> documentation as is required by the Contract Documents. <br /> IArchitect:An individual or entity retained by the Owner to be the Owner's representative with regard to <br /> matters of design intent. The terms"Owner's Representative","Engineer"and"Architect"are <br /> interchangeable. <br /> IAward Date: The date of the formal action by the Everett City Council to accept the lowest responsible <br /> and responsive Bidder for the Work. <br /> I Bid: The offer or proposal of a bidder submitted on the prescribed form setting forth the prices for the <br /> Work to be performed. <br /> Bid Form—The form provided to Bidders by the City for submittal of a Proposal or Bid to the City for a <br /> I specific project. <br /> Bidder: An individual,partnership, firm,corporation,or joint venture,submitting a Bid. <br /> Bid Opening Date: The date the Everett City Clerk publicly opens and reads the Bids. <br /> ICall for Bids(Advertisement for Bids): The published public notice soliciting or Bids for Work stating, <br /> among other things,the time,place,and date for receiving and opening the Bids. <br /> I Change Order: Reference to Change Order shall include all rights of the Owner and Contractor under <br /> ARTICLE 6. CHANGES. <br /> Completion Date: Date on which Project is ready for Final Acceptance. All physical Work,including <br /> I Punch List,is complete and Contractor has completed and fulfilled all contractual obligations except any <br /> maintenance of landscaping. Contractual obligations that must be fulfilled prior to achievement of the <br /> Completion Date include,but are not limited to,the Contractor's furnishing all documentation(including <br /> I correct,complete and accurate as-built or record drawings)and operation and maintenance manuals and <br /> transfer of warranties. <br /> Contract: Agreement signed by the Owner and Contractor(Section 005213). Depending on context, <br /> I "Contract"may also refer to the Contract Documents as a whole. Contract Documents are defined in <br /> section 1.2 below. <br /> I <br /> 1 <br /> 00 72 00 - 1 GENERAL CONDITIONS <br />
The URL can be used to link to this page
Your browser does not support the video tag.