My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
IMCO General Construction 12/13/2022
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
IMCO General Construction 12/13/2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/30/2025 12:23:45 PM
Creation date
12/30/2022 2:22:28 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
IMCO General Construction
Approval Date
12/13/2022
Council Approval Date
11/2/2022
Department
Public Works
Department Project Manager
Zach Brown
Subject / Project Title
Water Filter Plant Portal 4 Improvements
Public Works WO Number
UP3755
Tracking Number
0003541
Total Compensation
$4,520,327.00
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
Document Relationships
IMCO General Construction 7/30/2025 Change Order 4
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
IMCO General Construction 9/5/2024 Change Order 2
(Contract)
Path:
\Records\City Clerk\Contracts\10 Years Then Transfer to State Archivist\2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
978
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Everett 007200 - 2 <br /> Water Filter Plant Portal 4 Improvements WO# 3755 <br /> Contract Claim: Any request by the Contractor for additional time or money(adjustment of Contract <br /> Sum or Contract Time)irrespective of the cause or reason for the request. Contract Claims include,but <br /> are not limited to,requests by the Contractor for additional time or money due to Extra Work, <br /> inefficiencies,Delays, interferences,and problems with the design. Contract Claim includes,but is not <br /> limited to,claims or requests by Subcontractors for extensions of Contract Time,adjustment of Contract <br /> Sum,additional compensation that the Contractor attempts to pass through or assert against the Owner,or <br /> claims against the Owner arising out of a third party's claim against the Contractor. <br /> Contract Sum: The price in dollars stated in the Contract to be paid by the Owner to the Contractor for <br /> the Work described in the Contract Documents,as modified by any Change Orders. <br /> Contract Time: The duration of the Project as stated in the Contract and as modified by any Change <br /> Orders. <br /> Contractor: The individual or entity with whom Owner has entered into the Agreement. <br /> Day: Calendar day,unless explicitly stated otherwise. <br /> Delay: Any increase of the duration of the critical path of the Project. , <br /> Dispute: Any controversy or disagreement. <br /> Drawings:That part of the Contract Documents that graphically shows the scope,extent,and character of 111 <br /> the Work to be performed by Contractor. Shop Drawings and other Contractor Submittals are not <br /> Drawings as so defined. <br /> Effective Date of Agreement: See 18.10 EFFECTIVE DATE. I <br /> Engineer:An individual or entity retained by the Owner to be the Owner's representative with regard to <br /> matters of design intent. The terms"Owner's Representative","Engineer"and"Architect"are <br /> interchangeable. , <br /> Equipment: Mechanical,electrical,instrumentation,or other devices with one or more moving parts,or <br /> devices requiring an electrical,pneumatic,electronic,or hydraulic connection. <br /> Extended Overhead: The increase in Overhead costs attributable to an extension of Contract Time. , <br /> Extra Work: Providing materials and Equipment and the performance of Work not directly called for in, <br /> or implied by,the Contract Documents, such that Contractor would be entitled to an adjustment of <br /> Contract Sum and possibly an extension of Contract Time. <br /> Field Order:A written order issued by Owner's Representative that requires minor changes in the Work, <br /> but does not involve a change in the Contract Sum or the Contract Time. 111 <br /> Final Acceptance: Formal action by Everett City Council determining that all of the Contractor's Work <br /> has been completed,except for any landscaping maintenance. <br /> Float: The amount of time between the early start date and the late start date,or the early finish date and <br /> the late finish date of any activity in the project schedule. <br /> Force Account: Costs of performing Work as defined in 9.6.FORCE ACCOUNT. <br /> Furnish,Install,Perform,Provide,Supply: The word"Furnish" or the word"Install" or the word <br /> "Perform"or the word"Provide" or the word"Supply," or any combination or similar directive or usage <br /> thereof, shall mean furnishing and incorporating in the Work including all necessary labor,materials, <br /> equipment,and everything necessary to perform the Work indicated,unless specifically limited in the <br /> context used. <br /> General Conditions: This Section 007200 of the Contract Documents. <br /> May: Conduct that is permitted,but not required. <br /> Milestone: A principal event specified in the Contract documents relating to an intermediate completion <br /> date or time prior to Substantial Completion of all the Work. I <br /> 00 72 00 - 2 GENERAL CONDITIONS <br />
The URL can be used to link to this page
Your browser does not support the video tag.