Laserfiche WebLink
,fA1y <br />F4 <br />u <br />F[EGS� <br />M5RC July 15, 2022 <br />Attn: Chris Bronson <br />1330 Industry ST <br />Everett, WA 98275 1 USA <br />Direct: (425)293-1217 <br />Email: bmnsonrNma_rr.nrc <br />TrlatnoUfUf15— <br />on@msrc.or <br />Re: Proposal— Battery charger Receptacle Bldg 2201763 <br />TITAN Electric is pleased to submit our proposal for the above -mentioned project with the <br />following scope, clarifications, and exclusions. <br />Scope of work: $1,560.00 <br />1 Provide and install Conduit and wire from existing outlet inside wall to new outlet <br />location. <br />1 Core I" hole through 10" concrete wall. <br />1 Install Data ring and blank cover on interior wall where penetration of exterior wall <br />happens. <br />1 Provide and install WP bell box on exterior wall with WP GFCI receptacle and bubble <br />cover. <br />)lot Test,ver'dy, and label. <br />1 Permit and inspection <br />Clarifications: <br />1) Idle time national by Titan Elmdc,employees, and subcontractors due to absence of escorts, cleamnces, mabiliry <br />to enter workspare, or other finora beyond am comm) will be considered a change to the commit. <br />2) Contractor shall assume that the existing service is adaluecc for the proposed work aM has sufficient rymc capacity <br />and circuit breakers of the rat type <br />3) Contracmr proposal hazed on using EMT for mine overhead applications. MC for wall rough in <br />4) Contractor proposal based on a logical progression of work, Conditions due to trade trucking or interruptions of <br />work scheduling will be considered a change in me contract and may incur additional tour <br />5) Contractors allowances or demates for mechanical and plumbing work is based on assumptions, until final M arP <br />design is made available cost changes may incur. <br />6) cono-aemrs allowances or alternates for exitlegress lighting is hand on assumptions, unit final engineering and <br />pathway at is made available, cast changes may incur. <br />7) Contractors allowances or aluminum for Distribution work is bused on assumptions, unfit final electrical design and <br />tenant load is made available con changes may incur. <br />8) Egress lighting not inclusive above or shown on plans are trot included in proposal. Final design and quantities are <br />subject w engineering and Field inapcations. Added con may incur. <br />9) Conduit system that are staying aM not pan of the project is assumed to be insulted courenly and that all new <br />system will be installed amend it. There is no allowance in bid for these conduit systems. <br />10) Proposal is valid for 30 days unless otherwise armored in writing by Titan <br />11) Proposal based on working sbia au stated above and Eased on an shin consecutive workday. Time outside of this will <br />be charged at ovmimc and double time. (Day shift 6-7am stun) (Swing 490 to 6pm start) (Grave ARer 6pm start) <br />12) Assume wall connection to pre-wbed systems fumiwre, no Gee- standing desks or work surfices <br />Titan Elecfria Inc. <br />12828 Northup Way, Suite 205 • Bellevue. WA 98005 • Ph: 206.633.2811 • FA%: 266.3742128 <br />Paget oft <br />