Laserfiche WebLink
,tA4y <br />4 <br />� © V <br />FCEGS� <br />13) Fire alarm based on use ofopm-ar plenum cabling <br />14) Contractor stations walla will be opened as necessary an new installations <br />15) Pmject wamnty for materials and labor supplied by contractor will be l year after substantial completion of project <br />16) There were an building rates and or protect spite regarding the elmncal systems. fair proposal is based in code <br />compliance only <br />17) This proposal is based that the building Wading dock and elevator; will he accessible during normal business hours. <br />Uclusions: <br />1) Collections of existing cob: violations. Cade update or replacement of existing Nonlinear to remain <br />2) Egress pathway lighting study or egrtas lighting m OBC standards <br />3) Loador Caordinmionsmdy,Mmrmg <br />4) Puohae or installation of access dours where existing boxes fall in inaccessible ceiling due in new build out <br />5) Floor cores access hatches where they fall in the hard lids or inaccessible space. Will be open by the OC <br />6) Re -fading of existing wall power or Boor power to remain that is lost due to wall or ceiling demo <br />1) Rn-uppon,repair, orreplacement of raceways damaged due to demo by others <br />8) Trash containment, dapaial, or composite cleaning crews. Debris will be placed W tipster provided by general. <br />And remove from site by Others. <br />9) tuning, patching, or painting of walls due to Chaftcal insallatum <br />10) Painting of conduits, equipment associated with electrical installatlon <br />11) imaging, x-ray of walls or Boon, Coring <br />12) Applicable hoer Bonds. <br />13) Darn.Bxmity, AN cabling, Equipment, installation or terminations, Raceways for LV cabling systems <br />14) Spmkea or speaker cabling installation <br />15) Low in line voltage mechanical wit transitions, Southern, Dittanmea or relocations Other then abuse <br />16) Mom coat or institution repair due to new installations <br />19) Lighting future, lamp or ballast dapawl if not clearly stated above. <br />18) Expedited manufacturing, shipping, or bantling he's <br />19) Re-Iamping, Re -ballast, or cleaning of existing futures <br />20) Temporary power or lighting <br />21) Warranty of owner famished materals <br />22) Ovcsrimc or off boors work <br />23) Blom or 3D modeling <br />24) Plan Review <br />Sincerely, <br />Matt Busch <br />Than Becbic <br />Service Foreman <br />0:(206)03-2811 <br />o:(206)850-159T <br />e: maRblall8aMO <br />nemlectric.net <br />Titan Electric, Ina <br />12828 Nowbup Way, Suite 205 • Bellevue, WA 98005 • Ph: 206.633.2811 • FAX 206.3242128 <br />Page 2 of <br />