Laserfiche WebLink
• <br />• <br />Inte rior Lighting Summary LTG -SUM <br />2012 Washington State Energy Code Compliance Forms for Commercial Buildings including R2 & R3 over 3 stories and all R1 Revised Jan 2014 <br />Project Info <br />Project Address 3901 HOYT AVE <br />Date 9/3/2014 <br />Compliance <br />LOWER LEVEL <br />For Building Department Use <br />req r do not <br />C C( -C[ <br />EVERETT, WA 98201 <br />password to <br />use. <br />Applicant Name: THE EVERETT CLINIC <br />Instructional and <br />calculating cells <br />Applicant Address: 3901 HOYT AVE. EVERETT, WA 98201 <br />Applicant Phone: 425-259-1162 <br />are wite <br />Project Description <br />❑ New Building ❑ Addition m Alteration ❑ Plans Included <br />Lighting Compliance Path <br />Q Lighting Power Density Calculations Q Total Building Performance <br />(If Total Building Performance then only LGT-CHK is <br />Lighting Power Allowance <br />Q Building Area Method Space -By -Space Method <br />Method Selection required to <br />enable LPA forms <br />Interior Lighting System <br />Description <br />Briefly describe lighting <br />system type and features. <br />Additions and Change of Space Use (C1O1.4.3 & C1O1.4.4) <br />❑ Addition area or Change of Space Use area complies with all applicable provisions as stand alone project <br />Addition area is combined with existing building lighting systems to demonstrate compliance with all applicable <br />provisions per C101.4.3 <br />Provide Building Area Method (LTG-INT-BLD) or Space -By -Space Method (LTG-INT-SPACE) Compliance Form. Document <br />maximum alloKed and proposed (including existing if applicable) lighting Kettage ofAddition or Change of Use space. Provide <br />applicable lighting controls per C405.2 and commissioning of lighting controls per C405.13. <br />Alterations, Renovations and Repairs (C1O1.4.3.1) <br />❑ 60%or more of luminaires in space replaced <br />Provide Building Area Method (LTG-INT-BLD) or Space -By -Space Method (LTG-INT-SPACE) Compliance Form. Document <br />maximum a/lomd Kettage Kithin the lighting retrofit space in Maximum AlloKed Wattage table and proposed (including existing) <br />lighting Kettage in Proposed Wattage table. Retrofit and non -retrofit spaces shall be documented separately using multiple forms. <br />❑ Less than 60% of luminaires in space replaced <br />Provide a separate Space -By -Space Method (LTG-INT-SPACE) Compliance Form forthis retrofit area. Document existing total <br />Kettage Wthin the lighting retrofit space in cell provided in the Maximum AlloKed Wattage table. Document proposed (including <br />existing) lighting Kettage in the Proposed Wattage table. <br />❑ Lamp and/or ballast replacement within existing luminaires only — existing total interior building wattage not increased <br />❑ New wiring installed to serve added fixtures and/or fixtures relocated to new circuit <br />Provide applicable manual lighting controls (C405.2.1), occupancy sensors (C405.2.2.2), daylight zone controls (C405.2.2.3), specific <br />application controls (C405.2.3), and commissioning oflighting controls per C405.13 <br />❑ New or moved lighting panel <br />Provide all applicable lighting controls as noted for New Wiring, automatic time switch controls (C405.2.2.1), and commissioning of <br />lighting controls per C405.13. <br />❑ Space is reconfigured - luminaires unchanged or moved only <br />Provide all applicable lighting controls as noted for New Wiring and commissioning of lighting controls per C405.13. <br />No changes are being made to the interior lighting and space use not changed. <br />