Laserfiche WebLink
_XI <br /> Ox <br /> LL] <br /> J Q <br /> ,r 0 <br /> J M <br /> Qco <br /> O <br /> F � <br /> tc <br /> Lo <br /> structural structural <br /> ENGINEERS ENGINEERS <br /> January 12, 2022 <br /> SYSTEM INFO <br /> (11)Q CELLS <br /> Unirac Components and Cladding Roof Zones: Q.PEAK DUO BILK <br /> ML-G10+ <br /> 400W <br /> 1411 Broadway Blvd. NE The Components and Cladding Roof Zones shall be determined based on ASCE 7-05,ASCE 7-10&7-16 Component and (11)ENPHASE <br /> Albuquerque, NM 87102 Cladding design. IQ8PLUS-72-2-Us 240v <br /> DC SYSTEM SIZE:4.40 kWDC <br /> AC SYSTEM SIZE:3.30 kT <br /> Attn.: Unirac- Engineering Department Notes: 1) U-builder Online tool analysis is only for Unirac SM SOLARIV10UNT Rail Flush systems only and do not REVISIONS <br /> include roof capacity Check. DESCRIPTION DATE REV <br /> Re: Engineering Certification for the Unirac U Builder 2.0 SOLARMOUNT Flush Rail 2) Risk Category II per ASCE 7-16. <br /> 3)Topographic factor,kzt is 1.0. <br /> PZSE, Inc.-Structural Engineers has reviewed the Unirac SOLARMOUNT rails, proprietary mounting system constructed 4)Array Edge Factor YE=1.5 <br /> from modular parts which is intended for rooftop installation of solar photovoltaic(PV) panels; and has reviewed the U- 5)Average parapet height is 0.0 ft. Signature with Seal <br /> builder Online tool.This U-Builder software includes analysis for the SOLARMOUNT LIGHT rail,SOLARMOUNT 6)Wind speeds are LRFD values. <br /> STANDARD rail, and SOLARMOUNT HEAVY DUTY rail with Standard and Pro Series hardware. All information,data and 7)Attachment spacing(s)apply to a seismic design category E or less. <br /> analysis contained within are based on, and comply with the following codes and typical specifications: <br /> 1. Minimum Design Loads for Buildings and other Structures,ASCE/SEI 7-05,ASCE/SEI 7-10,ASCE/SEI 7-16 Design Responsibility: <br /> 2. 2006-2018 International Building Code, by International Code Council, Inc, w/Provisions from SEAOC PV-2 2017. The U-Builder design software is intended to be used under the responsible charge of a registered design professional <br /> 3. 2006-2018 International Residential Code, by International Code Council, Inc.w/Provisions from SEAOC PV-2 where required by the authority having jurisdiction. In all cases,this U-builder software should be used under the <br /> 2017. direction of a design professional with sufficient structural engineering knowledge and experience to be able to: PROJECT NAME&ADDRESS <br /> 4. AC428,Acceptance Criteria for Modular Framing Systems Used to Support Photovoltaic(PV) Panels, November Evaluate whether the U-Builder Software is applicable to the project,and <br /> 1,2012 by ICC-ES. Understand and determine the appropriate values for all input parameters of the U-Builder software. Q <br /> 5. 2015 Aluminum Design Manual,by The Aluminum Association,2015 Id (n <br /> > O <br /> This letter certifies that the Unirac SM SOLARMOUNT Rails Flush,when installed according to the U-Builder engineering J O <br /> Following are typical specifications to meet the above code requirements: <br /> report and the manufacture specifications, is in compliance with the above codes and loading criteria. uJ W O o <br /> Design Criteria: Ground Snow Load=0-100(psf) CV O <br /> Speed =85 190(mph) LU U Z op O <br /> Basic Wind S <br /> p ( p ) This certification excludes evaluation of the following components: = Z O M CD <br /> Roof Mean Height=0-60(ft) 1) The structure to support the loads imposed on the building by the array; including, but not limited to: strength U W of Q l- <br /> Roof Pitch =0-45(degrees) and deflection of structural framing members,fastening and/or strength of roofing materials,and/orthe effects U) IL 00IT— <br /> Exposure <br /> Exposure Category=B,C&D of snow accumulation on the structure. (n W W O <br /> 2) The attachment of the SM SOLARMOUNT Rails to the existing structure. <br /> Attachment Spacing: Per U-builder Engineering report. It <br /> 3) The capacity of the solar module frame to resist the loads. 2 W Z <br /> Cantilever: Maximum cantilever length is L/3,where"L" is the span noted In the U-Builder online U M a- <br /> tool. This requires additional knowledge of the building and is outside the scope of the certification of this racking system, N W Q <br /> � � <br /> Clearance: 2"to 10"clear from top of roof to top of PV panel. DIGITALLY SIGNED W <br /> If you have any questions on the above,do not hesitate to call. <br /> Tolerance(s): 1.0"tolerance for any specified dimension in this report is allowed for installation. K zgC' <br /> pe w>+sy <br /> Installation Orientation: See SOLARMOUNT Rail Flush Installation Guide. Prepared by: /�f <br /> Landscape-PV Panel long dimension is parallel to ridge/eave line of roof and the PV PZSE, Inc.—Structural Engineers DATE:6/23/2022 <br /> panel is mounted on the long side. Roseville,CA <br /> SHEET NAME <br /> Portrait-PV Panel short dimension is parallel to ridge/eave line of roof and the PV panel EQUIPMENT <br /> is mounted on the short side, �'rs/,� .�t �\�'� <br /> SPECIFICATION <br /> EXP1f Es 0e/02/2023 SHEET SIZE <br /> 1478 Stone Point Drive, Suite 190, Roseville, CA 95661 1478 Stone Point Drive, Suite 190, Roseville, CA 95661 ANSI B <br /> 916.961.3960 916.961.3965 WWW.pzse.Corn 1 of 2 916.961.3960 916.961.3965 WwW.pzse.Con 1 2 of 2 11" X 17" <br /> SHEET NUMBER <br /> PV-18 <br />