Laserfiche WebLink
_XI F_ <br /> Ox <br /> LL] <br /> J Q <br /> D <br /> J M <br /> Q <br /> F O <br /> co <br /> (7 co <br /> D <br /> O <br /> u7 <br /> Lf) <br /> SYSTEM INFO <br /> (11)Q CELLS <br /> Q.PEAK DUO BLK ML-G10+ <br /> 400W <br /> (11)ENPHASE <br /> IQ8PLUS-72-2-US 240V <br /> DC SYSTEM SIZE:4.40 kWDC <br /> E I I I AC SYSTEM SIZE:3.30 kWAC <br /> Sam : SMSOLAR STANDARD SYSTEM GROUNDING ; A ■;; ; SM SOLAR APPENDIX REVISIONS <br /> •■ MOUNT INSTALLATION GUIDE ; PACE ■• ; MOUNT I NIVERSALAF MIDCLAMP INSTALLATION GUIDE ; PAGE DESCRIPTION DATE REV <br /> WEEBLUG <br /> Single Use Onl 40 <br /> Signature with Seal <br /> ONLY ONE LUG PER ROW OF MODULES: If <br /> �- <br /> It <br /> Only one lug per row of modules is �' WEEBLUG CONDUCTOR P/N / <br /> � — <br /> required. See Page F for additional lugs — =`'� Apply Anti Seize and insert a bolt in the aluminum rail and through the clearance hole <br /> required for expansion joints. in the stainless steel flat washer. Place the stainless steel flat washer on the bolt, PROJECT NAME&ADDRESS <br /> oriented so the dimples will contact the aluminum rail.Place the lug portion on the 1.Position clamp to align T-bolt with rail 2.Rotate clamp clockwise 2/3 of a turn 3.Slide clamp into position against 4.Place second module, <br /> bolt and stainless steel flat washer.Install stainless steel flat washer,lock washer and slot.Lower clamp and insert T-bolt into to engage T-bolt inside rail slot. module. <br /> nut.Tighten the nut until the dimples are completely embedded into the rail and lug. Tait slat <br /> JKQUf b'At Ul 10 1[Lis.(See NvIe vn Vl_Al Q <br /> See product data sheet for more details,Model No.WEES-LUG 6-7 0 <br /> GROUNDING LUG MOUNTING DETAILS: Star wuhnr ItJ O <br /> Us <br /> Details are provided for both the WEER and llsco products.The WEEBLug has a Singte e Only _ O <br /> grounding symbol located on the lug assembly.The Ilsco Lug has a green colored ` Y~J ( <br /> m M <br /> W <br /> set screw for grounding indication purposes.Installation must be in accordance >� — W C O <br /> with NEPA NEC 70,however the electrical designer of record should refer to the -' / I ^ — LL ! , z O <br /> latest revision of NEC for actual grounding conductor cable size. r I , TERMINAL TORQUE, _ �Z O O <br /> I!,aµ, -I „o n� �i,p„ -.I nit__ •sur <br /> J..y�,1ou � -' /� Install Cadurta arra <br /> W*m to at4.6 AWG:55e kurtdtnl, U W Q - <br /> \,D 00 <br /> s AWG::!In-UN U) _n LL <br /> �/ S <br /> GROUND LUG BOLT 512E DRILL SIZE ILSCO LAY-IN LUG CONDUCTOR-UNIRAC P/N 008009P:Alternate Grounding Lug W W <br /> WEEBLu 1 4 N/A-Pace in Top SM Rail Slot �_ I� <br /> 9 / Drill,deburr hole and bolt[hrU both roll Walls per table. 5 Tighten bolt and torque to 15 ft-lbs- NOTE:If excessive force is applied m N <br /> IISCO Lug a10-32 1/32- '�s.(Sc*N„ PG.A) step 2,the cap may over-rotate causing LLZ <br /> See ILSCO product data sheet for more details,Modet No.GBL-4DBT. it to be misaligned with the module U LL Z <br /> Torque value depends on conductor size. frame.If this occurs,keep rotating the N W Q <br /> See product data sheet for torque value. cap clockwise until it returns to the \ <br /> NOTE:ISOLATE COPPFV.FROM ALUMINUM CONTACT TO PREVENT CORROSION original position. <br /> W <br /> DATE:6/23/2022 <br /> SHEET NAME <br /> EQUIPMENT <br /> SPECIFICATION <br /> SHEET SIZE <br /> ANSI B <br /> 11" X 17" <br /> SHEET NUMBER <br /> PV-17 <br />