My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
7206 WETMORE AVE 2023-01-17
>
Address Records
>
WETMORE AVE
>
7206
>
7206 WETMORE AVE 2023-01-17
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/17/2023 10:55:41 AM
Creation date
1/19/2023 2:25:40 PM
Metadata
Fields
Template:
Address Document
Street Name
WETMORE AVE
Street Number
7206
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
146
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
5.3 QRail Installation on Roof-top <br /> Installation of the QRail system on most roof-types requires that any penetrations of the roof surface be flashed in <br /> accordance with the appropriate local codes and roofing best practices. <br /> Installing Two-Rail Configuration <br /> ■ After determining the location of the array on the roof, mark the rail locations with chalk lines or other suitable method. <br /> ■ Determine the rafter locations and mark them on the E-W chalk lines. <br /> ■ For standard rail configuration installations, install roof attachments per the mount manufacturer's instructions. <br /> ■ Install the roof attachments along the chalk line per the manufacturer's instructions taking care to align the L-foot <br /> mounting point (mount bolt) as closely as possible to the intersection of the rafter and the chalk line. <br /> ■ Loosely install the T-bolts on the L-foot with the T-bolt facing the ridge of the roof. The L-feet may be aligned with the <br /> base of the "L" facing north or south. <br /> ■ Position the rail in place E-W and hold each end of the rail against the end L-feet. Insert the preassembled T-bolt rail <br /> fasteners in the end L-feet into the slot on the side of the QRail. Using a spirit level or other suitable device, set and hold <br /> the rail level at the desired height by moving the T-bolt up or down in the L-foot. <br /> ■ Using a 13 mm socket, tighten the rail fastener nuts to 16 ft-lbf (22 N-m)'. Be sure to allow the bolt head to rotate as far <br /> as possible in the T-bolt channel to ensure full engagement of the bolt head with the <br /> sides of the channel. Full engagement is confirmed when the alignment line on INCORRECT CORRECT <br /> the end of the T-bolt is vertical. <br /> ■ Proceed along the line of L-feet, inserting the T-bolts and tightening as above. 0 <br /> ■ Position the rail and L-feet N-S and secure the L-feet to the mount according to the <br /> mount manufacturer's instructions. <br /> ■ Repeat the above steps for each rail in the array. <br /> NOTE! <br /> Where site conditions and safety <br /> considerations allow, it may speed and simplify <br /> the installation to splice rails on the ground <br /> then transport them to the roof. <br /> If rails are to be spliced, the splice should be _ <br /> installed prior to installing the rails onto the <br /> L-feet or other roof attachments. See Section <br /> 5.2 for rail splicing instructions. <br /> Rail must be installed so the mount is <br /> fully engaged (edge of rail line to line <br /> with edge of mount) and maintain a <br /> Aminimum of 3/4" from the end of the rail Image 5.3.2 <br /> DANGER to center of T-bolt. T-bolt correctly positioned for insertion <br /> 1 If using non-nylon patched t-bolts tighten to 15 ft-lbf(20 N-m) <br /> B1 7.2.3-46 21 Jul-2019, Rev 4.2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.