My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
7206 WETMORE AVE 2023-01-17
>
Address Records
>
WETMORE AVE
>
7206
>
7206 WETMORE AVE 2023-01-17
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/17/2023 10:55:41 AM
Creation date
1/19/2023 2:25:40 PM
Metadata
Fields
Template:
Address Document
Street Name
WETMORE AVE
Street Number
7206
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
146
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Installing Shared QRail Configuration <br /> Optional gauge fabrication: <br /> ■ Fabricate an installation gauge by laying two rails on a flat <br /> surface. Lay one of the modules on the rails as shown. Be sure <br /> the rails are parallel with the edges of the module and with each a <br /> other. <br /> ■ Carefully measure distance "a" as shown in Image 5.3.3. This is <br /> the critical N-S distance between L-foot rail attachment points for <br /> shared rails. Carefully cut a dowel, PVC pipe, or other rigid length <br /> of material to distance "a." Image 5.3.3 <br /> Shared rail distance gauge <br /> Array Installation: <br /> ■ After determining the location of the array on the roof, mark the location of the lower rail with a chalk line or other <br /> suitable method. <br /> ■ Determine the rafter locations and mark them on the E-W chalk lines. <br /> ■ Install the roof attachments along the chalk line per the manufacturers' instructions taking care to align the L-foot <br /> mounting point (mount bolt) as closely as possible to the intersection of the rafter and the chalk line. <br /> ■ Install and tighten the L-feet on the two end mounting/flashings taking <br /> care to place the upright stays of the L-feet as closely aligned with the <br /> marked line as possible with the faces of the stays as closely parallel to the <br /> line as possible. <br /> ■ Stretch a reference string between the end L-feet and attach the remaining <br /> L-feet with the upright stays just touching the reference string and secure ' <br /> them in position. <br /> ■ Using the gauge fabricated earlier or using a measuring tape or other Image 5.3.4 <br /> suitable method, locate and mark the positions of the remaining rows of <br /> the array. <br /> ■ Install the remaining mounting/flashings and L-feet and check frequently <br /> to ensure proper N-S spacing of the upright surfaces of the L-feet stays 77 <br /> with the distance gauge. <br /> ■ Position the rail in place E-W and hold each end of the rail against the end <br /> L-feet. Insert the preassembled T-head rail fasteners in the end L-feet into <br /> the slot on the side of the QRail rail. Using a spirit level or other suitable <br /> device, set and hold the rail level at the desired height by moving the <br /> T-head bolt up or down in the L-foot. See Image 5.3.4. INCORRECT CORRECT <br /> ■ Using a 13 mm socket, tighten the rail fastener nuts to 16 ft-lbf (22 N-m)'. (Be <br /> sure to allow the bolt head to rotate as far as possible in the T-head channel <br /> to ensure full engagement of the bolt head with the sides of the channel). <br /> Full engagement is confirmed when the alignment line on the end of <br /> the T-bolt is vertical. See Image 5.3.5. Image 5.3.5 <br /> ■ With each end of the rail secured and the rail level, proceed along the line of L-feet, inserting the T-head bolts into the <br /> rail side channel and tightening as above. <br /> If using non-nylon patched t-bolts tighten to 15 ft-lbf(20 N-m) <br /> B1 7.2.3-46 22 Jul-2019, Rev 4.2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.