Laserfiche WebLink
I <br /> I <br /> 1 <br /> I <br /> I <br /> I <br /> I <br /> I <br /> I <br /> I <br /> I <br /> INTERWEST—EVERETT CONTRACTOR'S YARD SITE IMPROVEMENTS Sitts & Hill Engineers, Inc. <br /> I <br /> I <br /> I <br /> CONSTRUCTION STORMWATER POLLUTION PREVENTION PLAN Job Number 18,831 <br /> Section 6— Potential Erosion Problem Areas <br /> During construction, potential erosion problem areas will be those areas that have had existing surfacing removed. <br /> Best management practices (BMPs) will be utilized to mitigate erosion potential. After completion of the project, <br /> the site will be stabilized to prevent erosion issues.Surfacing will include pavement, gravel, and landscaping. <br /> SITTS& HILL ENGINEERS, INC. 7 <br /> TACOMA, WASHINGTON <br />