Laserfiche WebLink
I <br /> I <br /> I <br /> I <br /> I <br /> I <br /> I <br /> INTERWEST—EVERETT CONTRACTOR'S YARD SITE IMPROVEMENTS Sitts& Hill Engineers, Inc. <br /> I <br /> I <br /> CONSTRUCTION STORMWATER POLLUTION PREVENTION PLAN Job Number 18,831 <br /> Section 7— Construction Stormwater Pollution Prevention Elements <br /> Erosion and sediment control for this project will consist of the application and maintenance of BMPs previously <br /> installed as a part of the fill project (PW1807-046). These BMPs are listed below. See the Erosion Control Plan <br /> exhibit at the end of this section for a plan view of the proposed TESL BMPs. <br /> Below is a discussion of each of the thirteen Construction Stormwater Pollution Prevention Elements and a summary <br /> of applicable BMPs. Design, installation, and maintenance of any specific BMP should be carried out in accordance <br /> with the DOE Manual and any further instructions detailed in the construction plans. Included in Appendix 1 of this <br /> report are the DOE Manual specifications,tables,and figures for each BMP identified in this report. <br /> Element 1-Preserve Vegetation/Mark Clearing Limits <br /> Work limits will be identified in the field from the construction plans. Silt fence will be used to delineate the limits <br /> of construction. Existing vegetation should be preserved where possible to limit the area of exposed soils. <br /> Applicable BMPs: BMP C101: Preserving Natural Vegetation <br /> BMP C233: Silt Fence <br /> Element 2-Establish Construction Access <br /> Two stabilized construction entrances are existing-one on the southwest corner of the site, and the other on the <br /> southeast corner. Any debris generated as a result of construction activity will be swept clean to prevent tracking <br /> onto paved areas. <br /> Applicable BMPs: BMP C105: Stabilized Construction Entrance/Exit <br /> Element 3-Control Flow Rates <br /> The proposed project is flow control exempt. <br /> Applicable BMPs: N/A <br /> Element 4-Install Sediment Controls <br /> Silt fencing has been provided along the entire perimeter of the site. A temporary sediment pond is also proposed <br /> and has been sized according to the requirements of the DOE Manual. See the CSWPPP for the Interim Fill Project <br /> (permit no. PW1807-046)for sizing calculations. <br /> Applicable BMPs: BMP C233: Silt Fence <br /> BMP C241: Temporary Sediment Pond <br /> Element 5-Stabilize Soils <br /> I Any exposed soil requiring stabilization due to poor weather conditions,or left unworked for more than 2 days from <br /> October 1 to April 30(7 days from May 1 to September 30),will be covered at the end of each work shift. Covering <br /> material will be anchored to ensure adequate protection. Erosion control measures will remain in place until soil <br /> stabilization can be achieved by the installation of permanent surfacing. There will be no soil stockpiles after <br /> SITTS& HILL ENGINEERS, INC. 8 <br /> I <br /> TACOMA, WASHINGTON <br />