My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2320 RAILWAY AVE INTERWEST CONSTRUCTION INC 2023-02-02
>
Address Records
>
RAILWAY AVE
>
2320
>
INTERWEST CONSTRUCTION INC
>
2320 RAILWAY AVE INTERWEST CONSTRUCTION INC 2023-02-02
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/2/2023 9:39:15 AM
Creation date
1/24/2023 8:09:09 AM
Metadata
Fields
Template:
Address Document
Street Name
RAILWAY AVE
Street Number
2320
Tenant Name
INTERWEST CONSTRUCTION INC
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
340
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
' • • <br /> This Final DNS is issued under WAC 197-11-350. A 14-day public comment period for this proposal has <br /> been completed. <br /> Responsible <br /> Official: Allan Giffen, Director <br /> Title: Community, Planning and Economic Development Responsible Official <br /> Address: 2930 Wetmore Avenue, Suite 8-A, Everett, WA 98201 <br /> Date: November 28, 2018 <br /> Signature: 2 AL G1 tsv <br /> You may appeal this determination by filing an appeal on forms provided by the Planning Department <br /> and submitting the appeal with fee. The appeal must be filed by 5:00 p.m. on December 12, 2018. <br /> Contact Steve Ingalsbe to ask about the procedures for SEPA appeals. <br /> Notes: <br /> 1. A DNS may be withdrawn in the event of significant changes in the proposal, disclosure of new <br /> significant information, misrepresentation by the applicant, or failure to comply with the conditions <br /> upon which this Determination of Non-Significance is predicated. <br /> 2. This land use permit shall terminate if applicant does not apply for a public works or building <br /> permit within 18 months (or, with an extension, 24 months), except where a time limit on the land use <br /> permit is otherwise established under federal or state law, city ordinance, or an executed development <br /> agreement. <br /> C <br />
The URL can be used to link to this page
Your browser does not support the video tag.