My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2602 81ST PL SE 2023-05-10
>
Address Records
>
81ST PL SE
>
2602
>
2602 81ST PL SE 2023-05-10
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/10/2023 9:44:20 AM
Creation date
1/24/2023 11:51:41 AM
Metadata
Fields
Template:
Address Document
Street Name
81ST PL SE
Street Number
2602
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
69
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Areas on the site that have potential erosion problems: <br />Steep ravine south of property <br />Locations where surface water leaves the site: <br />street storm drain <br />Task 2: Select Construction Best Management Practices (BMPs) to be used on your project <br />All new development and redevelopment projects are responsible for preventing erosion and sedimentation <br />during construction. Each of the 13 requirements below contains a list of Best Management Practices (BMPs) <br />that are accepted by the Washington State Department of Ecology (Ecology) for satisfying each requirement. <br />The BMPs below are the most common. For a complete selection of BMPs please see Volume II of Ecology's <br />Stormwater Management Manual for Western Washington. <br />Each of the 13 Elements below must be considered in the SWPPP. Select all <br />BMPs that you will be using to satisfy each requirement. All requirements must <br />0 have at least one item selected. <br />Element 1. Preserve vegetation/mark clearing limits: <br />0 BMP C101: Preserving Natural Vegetation <br />❑ BMP C102: Buffer Zones <br />❑ BMP C103: High Visibility Plastic or Metal Fence <br />❑ Other Per the SWMMWW: <br />------------------ <br />❑ Not applicable to my proposed project <br />Explain: ------------------------------------------------ <br />Element 2. Establish construction: <br />0 BMP C105: Stabilized Construction Entrance/Exit <br />❑ BMP C106: Wheel Wash <br />❑ BMP C107: Construction Road/Parking Area Stabilization <br />❑ Other Per the SWMMWW: <br />------------------ <br />❑ Not applicable to my proposed project <br />Explain: ---------------------------------------------- <br />City of Everett Public Works <br />Small Project Stormwater Site Plan Report -Dec 2019 8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.