Laserfiche WebLink
Element 3. Control flow rates: <br />❑ BMP C203: Water Bars <br />0 BMP C240: Sediment Trap <br />❑ BMP C241: Temporary Sediment Pond <br />❑ Other Per the SWMMWW: <br />❑ Not applicable to my proposed project <br />Explain: ----------------------------- <br />Element 4. Install sediment controls: <br />❑ BMP C231: Brush Barrier <br />❑ BMP C232: Gravel Filter Berm <br />❑ BMP C233: Silt Fence <br />❑ BMP C234: Vegetated Strip <br />❑ BMP C235: Wattles <br />❑ BMP C240: Sediment Trap <br />❑ BMP C241: Temporary Sediment Pond <br />0 Other Per the SWMMWW: --- catch basin <br />--------------- <br />❑ Not applicable to my proposed project <br />Explain: ----------------------------------- <br />Element 5. Stabilize soils: <br />0 BMP C120: Temporary and Permanent Seeding <br />0 BMP C121: Mulching <br />❑ BMP C122: Nets and Blankets <br />❑ BMP C123: Plastic Covering <br />❑ BMP C124: Sodding <br />0 BMP C125: Topsoiling/Composting <br />❑ BMP C126: Polyacrylamide for Soil Erosion Protection <br />❑ BMP C130: Surface Roughening <br />❑ BMP C131: Gradient Terraces <br />❑ Other Per the SWMMWW: <br />------------------ <br />❑ Not applicable to my proposed project <br />Explain: -------------------------------------------- <br />City of Everett Public Works <br />Small Project Stormwater Site Plan Report -Dec 2019 9 <br />