Laserfiche WebLink
i II <br />I <br />a — <br />04 <br />04 <br />REVISION BY I APPROVED <br />S it PUMPED INDUSTRIAL WASTE 20808468 SITTS BKL <br />ENLARGED PAVING AND PAVEMENT MARKING PLAN N <br />SCALE: 1 " = 10' <br />RENSION BY APPROVED DATE <br />_ _ ACCEPTABILITY <br />�4�ap4I""solt� THIS DESIGN AND/OR <br />SPECIFICATION IS APPROVED <br />® APPROVED BY I DEPT. C <br />LEGEND <br />ASPHALT PAVEMENT <br />CONCRETE SIDEWALK <br />CURB AND GUTTER <br />—3F-- FENCE <br />GENERAL NOTES <br />ASPHALT (HMA) PAVEMENT PER SECTION A/C607-2 <br />I—/ ASPHALT JOINT PER DETAIL 1/C607-2 <br />LIGHT CONCRETE PAVEMENT PER SECTION B/C607-2 <br />® CONCRETE CURB & GUTTER PER DETAIL 9/C607-2 <br />RELOCATED SECURITY FENCE PER DETAIL 8/C607-2 <br />© 5'&3'D UTILITY TRENCH PER STRUCTURAL DRAWING 45—YD—S454-1 <br />]� PAVEMENT MARKING PER DETAIL 6/C607-2 <br />8. REFER TO SHEET C2C-2 FOR RELATED PROJECT NOTES. <br />CONSTRUCTION NOTES <br />MATCH EXISTING GRADES <br />L-_ IF TUNNEL/TRENCH INSTALLATION REQUIRES CURB & GUTTER REMOVAL, <br />SAWCUT ASPHALT AT EDGE OF GUTTER TO CLEAN UNYIELDING EDGE. <br />RE —INSTALL CURB AND GUTTER AT CURRENT GRADES. <br />b _ INSTALL TOP OF TUNNEL/TRENCH AT ADJACENT GUTTER ELEVATIONS. <br />PATCH AREA BETWEEN TRENCH AND BACK OF CURB PER LIGHT <br />CONCRETE PAVEMENT SECTION, <br />TRANSITION FROM TOP OF TRENCH ELEVATION TO EXISTING GRADES AT <br />10% MAX. SLOPE. ADJUST SAWCUT LINE IF NECESSARY, <br />FIELD VERIFY THE LOCATION OF THE EXISTING ADJACENT TRENCH. <br />INSTALL NEW TRENCH PER DIMENSIONS AND GEOMETRY SHOWN ON <br />45—YD—S454-1 <br />6. MAINTAIN ALL EROSION CONTROL MEASURES UNTIL COMPLETION OF <br />WORK. <br />KEY PLAN N, <br />SCALE: NONE V <br />ISSUED FOR CONSTRUCTION <br />APRIL 3, 2020 <br />RE <br />ENLARGED PAVING AND PAVEMENT MARKING PLAN CREW <br />2080846E -- <br />SHEEP <br />JMPED INDUSTRIAL WASTE 2 0 — 1 <br />SITE 45-YD JOB NO, <br />SITTS & HILL <br />ENGINEERS, INC. <br />CIVIL e STRUCTURAL a SURVEYING <br />veoxe.Iassl eaeas I ��°fzss)er seas <br />Project No.: 17659 Project Mgr.: BKL <br />Proj. Engineer. EMF Proj. Drafter. JDK <br />04.03.20 <br />45—YD—C220-451 <br />