My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3003 W CASINO RD 2020 BLDG 45-06 Plans 2023-01-26
>
Address Records
>
W CASINO RD
>
3003
>
BLDG 45-06
>
Plans
>
3003 W CASINO RD 2020 BLDG 45-06 Plans 2023-01-26
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2023 9:46:17 AM
Creation date
1/25/2023 11:07:50 AM
Metadata
Fields
Template:
Address Document
Street Name
W CASINO RD
Street Number
3003
Tenant Name
BLDG 45-06
Permit
B2010-015
Year
2020
Notes
EXCAVATE AND POUR NEW SHALLOW CONCRETE TRENCH ON SOUTH SIDE
Address Document Type
Plans
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
73
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I FUNIII <br />ELEMENT 1: Mark Clearing Limits: <br />-BMP C103: High Visibility Fence <br />ELEMENT 2: Establish Construction Access <br />-BMP C106: Wheel Wash* <br />'location to be coordinated with Boeing Environmental <br />Services as needed <br />ELEMENT 3: Control Flow Rates <br />-BMP C220: Storm Drain Inlet Protection <br />-BMP C235: Straw Wattle (as needed) <br />ELEMENT 4: Install Sediment Controls <br />-BMP C220: Storm Drain Inlet Protection <br />-BMP C235: Straw Wattle (as needed) <br />ELEMENT 7: Protect Drain Inlets <br />-BMP C220: Storm Drain Inlet Protection <br />ELEMENT 8: Stabilize Channels and Outlets <br />*Not applicable <br />ELEMENT 9: Control Pollutants <br />-BMP C151: Concrete Handling <br />-BMP C152: Sawcutting and Surfacing Pollution <br />Prevention <br />-BMP C153: Material Delivery, Storage, and <br />Containment <br />-BMP C154: Concrete Washout Area <br />-BMP C251: Construction Stormwater Filtration <br />-BMP C253: pH Control for High pH Water <br />ELEMENT 5: Stabilize Soils ELEMENT 10: Control Dewatering <br />-BMP C123: Plastic Covering* *Refer to C-SWPPP narrative <br />-BMP C120: Temporary and Permanent Seeding (as needed) 45-04 <br />-BMP C121: Mulching (as needed) <br />*location of stockpiles to be coordinated with Boeing <br />Environmental Engineering <br />ELEMENT 11: Maintain BMPs <br />-BMP C150: Materials on Hand <br />ELEMENT 12: Manage the Project <br />-BMP C150: Materials on Hand <br />-BMP C162: Scheduling <br />ELEMENT 13: Protect LID BMPs <br />*Not applicable <br />r_ ns-- <br />i <br />- - O0 <br />-��//� <br />ELEMENT 6: Protect Slopes �� <) <br />-BMP C123: Plastic Covering ! �� <br />-BMP C120: Temporary and Permanent Seeding (as needed) <br />I I -BMP C121: Mulching (as needed) <br />I <br />o* crs__. STs_.—_s,. I <br />s <br />\ BMP C103: High <br />y IBMP C152: Sawcutting and Visibility Fence <br />1-1JSurfacing Pollution Prevention I <br />�i I i •� I � � /,//c <br />Ln <br />- - - <br />S 6 <br />... ... <br />5&6 <br />3,4 <br />& <br />BMP C220: Inlet <br />Protection <br />3 & 4 Install BMP <br />needed <br />C235: Straw Wattles as <br />See "Wattle <br />Notes" on Sheet C2C-2 <br />REMOVE ASPHALT PAVEMENT <br />(ASSUME 6" HMA) <br />REMOVE CONCRETE SIDEWALK <br />aREMOVE <br />EXISTING GRASS <br />?; <br />REMOVE EXISTING SECURITY FENCE <br />REMOVE CURB & GUTTER <br />REMOVE VERTICAL CURB <br />---- ------- <br />SAWCUT LINE. <br />GENERAL NOTES <br />1. REFER TO SHEET C2C-2 FOR RELATED PROJECT NOTES. <br />2. REFER TO SHEET C607-2 FOR EROSION CONTROL DETAILS. <br />3. REFER TO C220-452 FOR NEW TRENCH LOCATION. <br />CONSTRUCTION NOTES <br />SAWCUT EXISTING ASPHALT AND REMOVE. EXCAVATE FOR NEW TRENCH <br />REMOVE EXISTING CONCRETE WALK <br />REMOVE EXISTING SECURITY FENCE IN TRENCH AREA. COORDINATE <br />TEMPORARY FENCE LOCATION PATH BOEING. REMOVE TEMPORARY FENCE <br />AFTER PERMANENT FENCE 15 IN PLACE <br />REMOVE EXISTING CURB & GUTTER WHERE NEEDED TO EXCAVATE AND <br />CONSTRUCT NEW TRENCH. SAWCUT ASPHALT AT EDGE of GUTTER TO <br />CLEAN UNYIELDING EDGE <br />REMOVE EXISTING VERTICAL CURB <br />REMOVE EXISTING GRASS AND TOPSOIL. EXCAVATE FOR NEW TRENCH <br />INSTALL CATCH BASIN PROTECTION PER DETAIL 1/C607-2 <br />REMOVE EXISTING 12" STORM DRAINAGE LINE. REFER TO C220-452 FOR <br />NEW INSTALLATION <br />BMP C151. Concrete Handling <br />- Potential BMP C123: Plastic Covering <br />Soil 21 <br />3 d �- �\ Stockpile Install BMPs C120 and C1 <br />L T <br />"` � <br />� <br />96 Ir <br />1 <br />a <br />BMP C152 Sawcuttngantl <br />Surfacing Pollution Prevention <br />Location as needed <br />- A <br />Runoff Is conveyed North to <br />// <br />20 <br />f1 <br />22 <br />25 <br />Install BMP C235: Straw Wattles as <br />two existing detention ponds <br />__ <br />�Q, �� - <br />�- <br />�• <br />t-�� <br />needed �- <br />See "Wattle Notes" on Sheet C2C-2 <br />(indicated on sheet GO) by <br />catch basins and storm sewer <br />\ <br />26 <br />22 Construction access <br />/g \ <br />�`9�� /g �� <br />piping(FYP.) <br />, <br />along 29th Ave vv <br />KEY PLAN <br />`_` <br />SCALE: NONE <br />.... <br />—_ _-____" <br />•, _._ _--_: ____ <br />0 5 10 20 30 <br />____ <br />SCALE. 1 =10 <br />SITTS & HELL <br />} <br />ENGINEERS, INC. <br />i <br />" <br />- <br />CIVIL • STRUCTURAL SURVEYING <br />3�a a9�s <br />- <br />ISSUED FOR CONSTRUCTIONREMOVAL <br />Fwor,E:�Hzs»a*�a <br />ENLARGED PAVING PLAN — <br />SCALE: 1" - 10' <br />REMOVAL <br />N <br />APRI( 3, 2020 <br />Project k, 17659 <br />Proj. EDgIr—; EMT <br />Prcle t Mgr.: BKL <br />Pro} Drafter. JDK <br />REVISION BY I APPROVED <br />SITEITS PUMPED INDUSTRIAL WASTE 20808468 SBKL <br />REENSION <br />0-1-��21 <br />ACCEPTABILITY <br />THIS DESIGN AND/OR <br />SPECIFICATION IS APPROVED <br />APPROVED BY I DEPT. r <br />ENLARGED PAVING PLAN - REMOVAL <br />SITE PUMPED INDUSTRIAL WASTE <br />208084681 — — 04.03.20 <br />C220IEE! <br />®2 <br />B N0, COMP NO. <br />is No. 45-YD-C220-452R <br />
The URL can be used to link to this page
Your browser does not support the video tag.