Laserfiche WebLink
REV I REVISI❑N DESCRIPTI❑N <br />0 1 RRO — 767 RATE INCREASE AFT SI — IFC <br />AUTH❑RIZATI❑NS <br />-d <br />w <br />w <br />T <br />N <br />�r <br />IN <br />FLOOR LEVEL FIRE PROTECTION PLAN <br />SCALE: 1:50 <br />NEW SHEET <br />LEGEND <br />GENERAL NOTES <br />DESIGNER: DCS <br />CHECKER; DCS <br />APPROVAL! KMB <br />1. THIS DRAWING IS SERVED BY RISER SV32-13 LOCATED NEAR COL. E-16.5. <br />2. THE BOEING EVERETT FIRE INSPECTION DEPARTMENT (206-655-8800) SHALL BE NOTIFIED 24 <br />HOURS IN ADVANCE OF ALL VALVE CLOSURES, FLUSHING, AND HYDROSTATIC TESTS ON THE <br />FIRE PROTECTION SYSTEM. THE MAXIMUM DURATION OF A SYSTEM CLOSURE IS 8 HOURS <br />UNLESS PERMISSION IS GRANTED BY THE FIRE CHIEF, <br />3, PROVIDE A MATERIAL AND TEST CERTIFICATE UPON COMPLETION OF THE TESTING. THE <br />CERTIFICATE SHALL BE SIGNED OFF BY THE BOEING EVERETT FIRE INSPECTOR DEPARTMENT <br />PRIOR TO COMMENCING ADDITIONAL WORK ON THE FIRE PROTECTION SYSTEM. <br />4. PIPE HANGERS SPACING SHALL BE PER NFPA 13. <br />5. ALL SPRINKLER PIPING 3" AND SMALLER SHALL BE SCHEDULE 40 ASTM A-53 GRADE B <br />BLACK STEEL. ALL PIPING 4" AND LARGER SHALL BE ASTM A-53 SCHEDULE 40 FOR <br />VERTICAL RISERS AND SCHEDULE 10 FOR HORIZONTAL. MAINS AND CROSS MAINS. <br />6. SPRINKLER SYSTEM PIPE FITTINGS SHALL BE 150 LB. THREADED MALLEABLE IRON FOR <br />1-1/2" AND SMALLER, AND VICTAULIC GROOVED FITTINGS FOR 2-1/2" AND LARGER. PIPE <br />FITTINGS FOR 2" MAY BE EITHER 150 LB. THREADED MALLEABLE IRON OR VICTAULIC <br />GROOVED. <br />7. COUPLINGS FOR GROOVED PIPE AND FITTINGS SHALL BE VICTAULIC STYLE 07 ZERO —FLEX <br />UNLESS OTHERWISE NOTED. <br />8. HYDROSTATIC TEST: PRESSURE — 225 PSIG, DURATION — 2 HOURS. <br />9. SEISMIC BRACING SHALL BE INSTALLED IN ACCORDANCE WITH FM STANDARDS. SEE FM DATA <br />SHEETS 2-8, "EARTHQUAKE PROTECTION FOR WATER —BASED FIRE PROTECTION SYSTEMS" FOR <br />SPECIFIC DETAILS. SPRINKLER DESIGN SHALL BE IN ACCORDANCE WITH THE LATEST VERSIONS <br />OF NFPA 13 AND FM GLOBAL DATA SHEET 2-0. <br />10. AUTOMATIC SPRINKLER HEADS SHALL BE 155 — 165 DEGREE F. TEMPERATURE RATED. <br />11. ALL EQUIPMENT SHALL BE UL LISTED AND FM APPROVED FOR FIRE SERVICE. <br />REFERENCE DRAWINGS <br />CONSTRUCTION NOTES <br />1. CONTRACTOR SHALL INVESTIGATE AND VERIFY LOCATIONS OF STRUCTURAL, MECHANICAL, <br />AND ELECTRICAL ELEMENTS AND OTHER EXISTING CONDITIONS TO AVOID CONFLICTS <br />PRIOR TO BEGINNING THE WORK. <br />2. ANY DISCREPANCIES BETWEEN EXISTING CONDITIONS AND CONTRACT DOCUMENTS SHALL <br />BE CALLED TO THE ATTENTION OF BRPH. <br />3, CONTRACTOR SHALL BE RESPONSIBLE FOR SAFETY IN THE AREA OF WORK IN <br />ACCORDANCE WITH ALL OSHA AND BOEING STANDARDS. <br />4, ROUTE FIRE PROTECTION PIPE ALONG TOOL STEEL. <br />5, COORDINATE SPRINKLER HEAD PLACEMENT AND PIPE ROUTING WITH ALL DISCIPLINES, <br />INCLUDING NW AND EXISTING MECHANICAL AND ELECTRICAL DISCIPLINES. <br />© PROVIDE PERMANENT SPRINKLER PIPING, MOUNTED ON TOOL. THE SPRINKLER HEADS <br />MUST PROVIDE COVERAGE FOR THE ENTIRE SURFACE OF THE AFT SI FUSELAGE SECTION, <br />INCLUDING AT OPEN ENDS AND ALONG FULL LENGTH. <br />7. DEFER FIRE PROTECTION PIPE SIZING AND ARRANGEMENT TO LICENSED FIRE PROTECTION <br />CONTRACTOR. <br />8. PROVIDE WET PIPE FIRE SPRINKLER PROTECTION THROUGHOUT THE TOOL SHOWN ON <br />THIS DRAWING IN ACCORDANCE WITH NFPA-13 AND BOEING FIRE DEPARTMENT <br />REQUIREMENTS. PROVIDE FIRE SPRINKLERS UNDER ALL GRATED AREAS AND UNDER ALL <br />PLATFORMS. LOCATE SPRINKLER PIPING IN A NEAT MANNER AND TO PROVIDE ADEQUATE <br />CLEARANCE FOR PERSONNEL AND EQUIPMENT. COORDINATE PIPE ROUTING WITH ALL <br />DISCIPLINES AND PROVIDE ADDITIONAL OFFSETS AND SPRINKLERS AS REQUIRED. PROVIDE <br />AUXILIARY DRAINS PER NFPA-13. <br />9. PROVIDE FIRE SPRINKLER SYSTEMS IN ACCORDANCE WITH BOEING FIRE PROTECTION <br />ENGINEERING STANDARD 038108—F, NFPA-13, FM 2-8 AND FM 2-8N, APPLICABLE <br />CODES AND BOEING FIRE DEPARTMENT REQUIREMENTS, THE FIRE SPRINKLER <br />CONTRACTOR SHALL PREPARE FIRE SPRINKLER SHOP DRAWINGS AND HYDRAULIC <br />CALCULATIONS IN ACCORDANCE WITH THESE STANDARDS AND SUBMIT TO BOEING FIRE <br />PROTECTION ENGINEERING FOR APPROVAL AND PERMIT. <br />10. FIRE SPRINKLER SHOP DRAWINGS SHALL INCLUDE THE SPRINKLER CONTROL VALVE TAG <br />AND LOCATION FOR THE CONTROL VALVE THAT SERVES THE AREA. <br />FLOOR LEVEL FIRE PROTECTION PLAN <br />767 RATE INCREASE - AFT SI <br />40-32 BUILDING, COL E16-17 <br />,U <br />cr-:, <br />SD <br />PH <br />www.brph.com Copyright © 2019 <br />Architects Engineers, Inca <br />19020 33rd Ave W, Suite 530 Stale of Washington <br />Lynnwood, Washington, 98036 Certificate e No. 60ri23551 <br />425-921-3500 Architecture No.313235512 <br />Enaineerina No. 3137 <br />PRODUCT <br />TYPE1 <br />DISCIPLINE; MECHANICAL <br />DATE <br />08 16 2019 <br />PLO TTED; // <br />STATUS: IFC <br />STATUS <br />08 16 2019 <br />DATE: // <br />DESI GN <br />OPTION ID; <br />REVISIONS <br />SCALE <br />1 .50 <br />ALL DIMENSIONS IN INCHES <br />❑RG, NO, <br />CONCURRENCE <br />DATE <br />FINISH <br />COLOR OR PROTECTIVE <br />SECTION <br />13 <br />SHT SIZE <br />0 <br />REV <br />REV <br />DATE <br />MODEL <br />0 <br />08/16/19 <br />EXCEPT AS NOTED <br />TOLERANCES MACHINE <br />DECIMAL FINISH <br />X =± <br />XX =± <br />ANGULAR V <br />ANGULAR =± SEE TDM <br />r--J <br />BCAG EVERETT DIVISI❑N <br />NAME <br />DATE <br />DESIGNED <br />D. SMITH <br />08/16/19 <br />FIRE PROTECTION rl <br />SYSTEM <br />BODY SECTIONS 46/48 <br />DETAILED <br />D. SMITH <br />08/16/19 <br />FLOOR AREA <br />-- <br />APPROX WT <br />CHECKED <br />D. SMITH <br />08/16/19 <br />SEE SHT 1 <br />SEE SHT 1 <br />APPROVED <br />K. BENHAM <br />08/16/19 <br />PROD <br />CHG NO <br />USED ON <br />RK <br />ORDER ORDE BA# EVE-18-30055-601 <br />it <br />APPRovED <br />FME1 40T0000-8000 <br />DWO NO, SHT NO, M 0 70F <br />DRAWING N❑ <br />SHEET <br />REv <br />_ <br />NOR <br />NAME <br />I EVERETT FACILITIES SERVER <br />LAST PROD DRAWING CHANGE <br />NO <br />NAME <br />I FME140T0000-8000_MO7 <br />