My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3003 W CASINO RD 2019 BLDG 40-32 Plans 2023-01-25
>
Address Records
>
W CASINO RD
>
3003
>
BLDG 40-32
>
Plans
>
3003 W CASINO RD 2019 BLDG 40-32 Plans 2023-01-25
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/25/2023 3:49:26 PM
Creation date
1/25/2023 11:26:58 AM
Metadata
Fields
Template:
Address Document
Street Name
W CASINO RD
Street Number
3003
Tenant Name
BLDG 40-32
Permit
B1909-030
Year To
2019
Notes
STRUCTURAL SUPPORT OF CORROSION INHIBITOR COMPOUND EXHAUST
Address Document Type
Plans
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
36
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
W <br />N <br />EI <br />B-DECK FIRE PROTECTION PLAN <br />SCALE: 1:50 <br />LEGEND <br />GENERAL NOTES <br />1. THIS DRAWING IS SERVED BY RISER SV32-13 LOCATED NEAR <br />COL. G-16.5. <br />2. THE BOEING EVERETT FIRE INSPECTION DEPARTMENT (206-655-8800) <br />SHALL BE NOTIFIED 24 HOURS IN ADVANCE OF ALL VALVE CLOSURES, <br />FLUSHING, AND HYDROSTATIC TESTS ON THE FIRE PROTECTION SYSTEM. THE <br />MAXIMUM DURATION OF A SYSTEM CLOSURE IS 8 HOURS UNLESS <br />PERMISSION IS GRANTED BY THE FIRE CHIEF. <br />3. PROVIDE A MATERIAL AND TEST CERTIFICATE UPON COMPLETION OF THE <br />TESTING. THE CERTIFICATE SHALL BE SIGNED OFF BY THE BOEING EVERETT <br />FIRE INSPECTOR DEPARTMENT PRIOR TO COMMENCING ADDITIONAL WORK ON <br />THE FIRE PROTECTION SYSTEM. <br />4. PIPE HANGERS SPACING SHALL BE PER NFPA 13. <br />5, ALL SPRINKLER PIPING 3" AND SMALLER SHALL BE SCHEDULE 40 ASTM <br />A-53 GRADE B BLACK STEEL. ALL PIPING 4" AND LARGER SHALL BE ASTM <br />A-53 SCHEDULE 40 FOR VERTICAL RISERS AND SCHEDULE 10 FOR <br />HORIZONTAL MAINS AND CROSS MAINS. <br />6. SPRINKLER SYSTEM PIPE FITTINGS SHALL BE 150 LB. THREADED MALLEABLE <br />IRON FOR 1-1/2" AND SMALLER, AND VICTAULIC GROOVED FITTINGS FOR <br />2-1/2" AND LARGER. PIPE FITTINGS FOR 2" MAY BE EITHER 150 LB, <br />THREADED MALLEABLE IRON OR VICTAULIC GROOVED. <br />7. COUPLINGS FOR GROOVED PIPE AND FITTINGS SHALL BE VICTAULIC STYLE <br />07 ZERO -FLEX UNLESS OTHERWISE NOTED. <br />8. HYDROSTATIC TEST: PRESSURE - 225 PSIG, DURATION - 2 HOURS. <br />9. SEISMIC BRACING SHALL BE INSTALLED IN ACCORDANCE WITH FM <br />STANDARDS. SEE FM DATA SHEETS 2-8, "EARTHQUAKE PROTECTION FOR <br />WATER -BASED FIRE PROTECTION SYSTEMS" FOR SPECIFIC DETAILS. <br />SPRINKLER DESIGN SHALL BE IN ACCORDANCE WITH THE LATEST VERSIONS <br />OF NFPA 13 AND FM GLOBAL DATA SHEET 2-0. <br />10. AUTOMATIC SPRINKLER HEADS SHALL BE 155 - 165 DEGREE F. <br />TEMPERATURE RATED. <br />11. ALL EQUIPMENT SHALL BE UL LISTED AND FM APPROVED FOR FIRE <br />SERVICE. <br />12. PROVIDE WET PIPE FIRE SPRINKLER PROTECTION THROUGHOUT THE TOOL SHOWN ON THIS <br />DRAWING IN ACCORDANCE WITH NFPA-13 AND BOEING FIRE DEPARTMENT REQUIREMENTS. <br />PROVIDE FIRE SPRINKLERS UNDER ALL GRATED AREAS AND UNDER ALL PLATFORMS. LOCATE <br />SPRINKLER PIPING IN A NEAT MANNER AND TO PROVIDE ADEQUATE CLEARANCE FOR <br />PERSONNEL AND EQUIPMENT. COORDINATE PIPE ROUTING WITH ALL DISCIPLINES AND PROVIDE <br />ADDITIONAL OFFSETS AND SPRINKLERS AS REQUIRED. PROVIDE AUXILIARY DRAINS PER <br />NFPA-13. <br />13. PROVIDE FIRE SPRINKLER SYSTEMS IN ACCORDANCE WITH BOEING FIRE PROTECTION <br />ENGINEERING STANDARD 038108-F, NFPA-13, FM 2-8 AND FM 2-8N, APPLICABLE CODES <br />AND BOEING FIRE DEPARTMENT REQUIREMENTS. THE FIRE SPRINKLER CONTRACTOR SHALL <br />PREPARE FIRE SPRINKLER SHOP DRAWINGS AND HYDRAULIC CALCULATIONS IN ACCORDANCE <br />WITH THESE STANDARDS AND SUBMIT TO BOEING FIRE PROTECTION ENGINEERING FOR <br />APPROVAL AND PERMIT. <br />14. FIRE SPRINKLER SHOP DRAWINGS SHALL INCLUDE THE SPRINKLER CONTROL VALVE TAG AND <br />LOCATION FOR THE CONTROL VALVE THAT SERVES THE AREA. <br />CONSTRUCTION NOTES <br />1. CONTRACTOR SHALL INVESTIGATE AND VERIFY LOCATIONS OF <br />STRUCTURAL, MECHANICAL, AND ELECTRICAL ELEMENTS AND OTHER <br />EXISTING CONDITIONS TO AVOID CONFLICTS PRIOR TO BEGINNING THE <br />WORK. <br />2. ANY DISCREPANCIES BETWEEN EXISTING CONDITIONS AND CONTRACT <br />DOCUMENTS SHALL BE CALLED TO THE ATTENTION OF BRPH. <br />3. CONTRACTOR SHALL BE RESPONSIBLE FOR SAFETY IN THE AREA OF <br />WORK IN ACCORDANCE WITH ALL OSHA AND BOEING STANDARDS. <br />4. ROUTE FIRE PROTECTION PIPE ALONG TOOL STEEL. <br />5. COORDINATE SPRINKLER HEAD PLACEMENT AND PIPE ROUTING WITH ALL <br />DISCIPLINES, INCLUDING NW AND EXISTING MECHANICAL AND ELECTRICAL <br />DISCIPLINES. <br />(C PROVIDE PERMANENT SPRINKLER PIPING, MOUNTED ON TOOL. WHERE <br />POSSIBLE, REUSE EXISTING SPRINKLER HEADS AND FIRE PIPE. THE <br />SPRINKLER HEADS MUST PROVIDE COVERAGE FOR THE ENTIRE <br />SURFACE OF THE AFT SI FUSELAGE SECTION, INCLUDING AT OPEN <br />ENDS AND ALONG FULL LENGTH. <br />PROVIDE IN -DUCT WET PIPE FIRE SPRINKLER PROTECTION IN CIC <br />EXHAUST DUCTWORK, AS SHOWN. SPRINKLER DENSITY SHALL BE <br />DEFERRED TO LICENSED FIRE PROTECTION CONTRACTOR, <br />8. PROVIDE A FLEXHEAD SPRINKLER DROP CONNECTION WITH DUCT <br />MOUNTING BLOCK, WAX COATED SPRINKLER HEAD WITH POLY BAG FOR <br />EACH IN -DUCT SPRINKLER HEAD. <br />9, PROVIDE WET PIPE FIRE SPRINKLER PROTECTION FOR EXHAUST DUCT <br />SYSTEM AS SHOWN. ROUTE MAIN SUPPLY PIPING DOWN TO SPRINKLER <br />HEADS. <br />10. MODIFY EXISTING FIRE SPRINKLER SYSTEMS IN ACCORDANCE WITH <br />BOEING FIRE PROTECTION ENGINEERING STANDARD D38108-F, FM 2-8 <br />AND FM 2-8N, APPLICABLE CODES AND BOEING FIRE DEPARTMENT <br />REQUIREMENTS. FIRE SPRINKLER SHOP DRAWINGS SHALL INCLUDE THE <br />SPRINKLER CONTROL VALVE TAG AND LOCATION FOR THE CONTROL <br />VALVE THAT SERVES THIS AREA. <br />11. COORDINATE SPRINKLER HEAD PLACEMENT AND PIPE ROUTING WITH ALL <br />DISCIPLINES, INCLUDING NEW AND EXISTING MECHANICAL AND <br />ELECTRICAL DISCIPLINES. PROVIDE ADDITIONAL PIPING AND SPRINKLERS <br />AS REQUIRED. <br />12. DEFER FIRE PROTECTION PIPE SIZING TO LICENSED FIRE PROTECTION <br />CONTRACTOR. <br />O NEW SHEET B-DECK FIRE PROTECTION PLAN <br />767 RATE INCREASE -AFT SI <br />40-32 BUILDING, COL E16-17 <br />
The URL can be used to link to this page
Your browser does not support the video tag.