|
W
<br />E I
<br />REV
<br />REVISI❑N DESCRIPTI❑N AUTH❑RIZATI❑NS
<br />DESIGNERI DCS
<br />CHECKER1 DCS
<br />APPROVAL: KMB
<br />LEGEND
<br />,_
<br />GENERAL NOTES
<br />i
<br />1.
<br />THIS DRAWING IS SERVED BY RISER SV32-XX LOCATED NEAR
<br />COL. X-XX.
<br />2.
<br />THE BOEING EVERETT FIRE INSPECTION DEPARTMENT (206-655-8800)
<br />��m��mee����������
<br />SHALL BE NOTIFIED 24 HOURS IN ADVANCE OF ALL VALVE CLOSURES,
<br />_ ®
<br />����e���� ��� if
<br />I
<br />FLUSHING AND HYDROSTATIC TESTS ON THE FIREPROTECTION SYSTEM,
<br />THE
<br />.�-----
<br />I-------� °-----�_------------------- �
<br />— --= - --- -- - ---------- - ---- ----
<br />---= _..--------- -- - �- --- ----- --- ,-
<br />DURATION 0 F A SYSTEM CLOSURE S HOURSTEM.
<br />ESS
<br />I
<br />- - --
<br />� - --
<br />-+
<br />_MAXIMUM8
<br />PERMISSION IS GRANTED BY THE FIRE CHIEF.
<br />if
<br />3,
<br />PROVIDE A MATERIAL AND TEST CERTIFICATE UPON COMPLETION OF THE
<br />�I
<br />- c
<br />Y '✓J' l a
<br />I
<br />#I
<br />TESTING. THE CERTIFICATE SHALL BE SIGNED OFF BY THE BOEING EVERETT
<br />FIRE INSPECTOR DEPARTMENT PRIOR TO COMMENCING ADDITIONAL WORK ON
<br />iI
<br />i,4.
<br />;)
<br />I�
<br />THE FIRE PROTECTION SYSTEM.
<br />—
<br />i I
<br />i
<br />PIPE HANGERS SPACING SHALL BE PER NFPA 13.
<br />I
<br />:�
<br />.I
<br />1 I
<br />I
<br />t it
<br />I
<br />0
<br />I
<br />) ICI
<br />-
<br />5.SPRINKLERPING
<br />ALL P 3 I AND SMALLER SHALL E
<br />B SCHEDULE 40 AST
<br />I
<br />I
<br />y
<br />A-53 GRADE B BLACK STEEL. ALL PIPING 4" AND LARGER SHALL BE ASTM
<br />A-53 SCHEDULE 40 FOR VERTICAL RISERS AND SCHEDULE 10 FOR
<br />I
<br />I
<br />I
<br />Ij
<br />I,
<br />HORIZONTAL MAINS AND CROSS MAINS.
<br />II
<br />6.
<br />SPRINKLER SYSTEM PIPE FITTINGS SHALL 3E 150 LB. THREADED MALLEABLE
<br />I
<br />II
<br />1
<br />IRON FOR 1-1/2" AND SMALLER, AND VICTAULIC GROOVED FITTINGS FOR
<br />i
<br />I'
<br />2-1/2" AND LARGER. PIPE FITTINGS FOR 2" MAY BE EITHER 150 LB.
<br />THREADED MALLEABLE IRON OR VICTAULIC GROOVED.
<br />`
<br />L__
<br />I
<br />i
<br />'
<br />1 if
<br />' I
<br />:
<br />7.
<br />COUPLINGS FOR GROOVED PIPE AND FITTINGS SHALL BE VICTAULIC STYLE
<br />- --- T- -
<br />..
<br />..,____ _-_- ---
<br />,
<br />- ---- - _ --_
<br />- _-- -_- __ - ---- --;; _
<br />_ __ __ __
<br />_ __
<br />___. __ __ -_
<br />07 ZERO -FLEX UNLESS OTHERWISE NOTED.
<br />8.
<br />HYDROSTATIC TEST: PRESSURE - 225 PSIG, DURATION - 2 HOURS.
<br />If
<br />T,9.
<br />SEISMIC BRACING SHALL BE INSTALLED IN ACCORDANCE WITH FM
<br />I!
<br />1
<br />J
<br />STANDARDS. SEE FM DATA SHEETS 2-8, EARTHQUAKE PROTECTION FOR
<br />WATER -BASED FIRE PROTECTION SYSTEMS" FOR SPECIFIC DETAILS.
<br />o I,�, I'' I,
<br />' I
<br />SPRINKLER DESIGN SHALL BE IN ACCORDANCE WITH THE LATEST VERSIONS
<br />OF NFPA 13 AND FM GLOBAL DATA SHEET 2-0.
<br />if
<br />_--.��
<br />.,.
<br />—
<br />10.
<br />AUTOMATIC SPRINKLER HEADS SHALL BE 155 - 165 DEGREE F.
<br />if
<br />TEMPERATURE RATED.
<br />1 1 .
<br />ALL EQUIPMENT SHALL BE UL LISTED AND FM APPROVED FOR FIRE
<br />I
<br />SERVICE.
<br />III!III
<br />I
<br />I
<br />CONSTRUCTIONNOTES
<br />i
<br />r
<br />II
<br />I
<br />I
<br />:I
<br />I
<br />i
<br />1.
<br />CONTRACTOR SHALL INVESTIGATE AND VERIFY LOCATIONS OF
<br />III
<br />STRUCTURAL, MECHANICAL, AND ELECTRICAL ELEMENTS AND OTHER
<br />r:
<br />Ii
<br />I T_,E
<br />EXISTING CONDITIONS TO AVOID CONFLICTS PRIOR TO BEGINNING THE
<br />I
<br />WORK.
<br />2.
<br />ANY DISCREPANCIES BETWEEN EXISTING CONDITIONS AND CONTRACT
<br />ILL
<br />DOCUMENTS SHALL BE CALLED TO THE ATTENTION OF BRPH.
<br />I
<br />III
<br />3.
<br />CONTRACTOR SHALL BE RESPONSIBLE FOR SAFETY IN THE AREA OF
<br />i ), - - -
<br />� -
<br />I
<br />>
<br />j
<br />I'I
<br />� J�
<br />WORK IN ACCORDANCE WITH ALL OSHA AND BOEING STANDARDS.
<br />I
<br />——
<br />I
<br />1 — —
<br />— — ---- —
<br />x
<br />;- -,-,
<br />4.
<br />ROUTE FIRE PROTECTION PIPE ALONG TOOL STEEL.
<br />5.
<br />COORDINATE SPRINKLER HEAD PLACEMENT AND PIPE ROUTING WITH ALL
<br />-= r=
<br />I'--
<br />- _
<br />DISCIPLINES, INCLUDING NW AND EXISTING MECHANICAL AND ELECTRICAL
<br />t
<br />x _- .
<br />� _D.-., - c_. - L ,r.
<br />�':I.
<br />r c- --f_ r
<br />c.
<br />,
<br />I'
<br />iI�
<br />DISCIPLINES.
<br />I
<br />PROVIDE PERMANENT SPRINKLER PIPING, MOUNTED ON TOOL. THE
<br />..I
<br />SPRINKLER HEADS MUST PROVIDE COVERAGE FOR THE ENTIRE SURFACE
<br />i a
<br />I
<br />OF THE AFT SI FUSELAGE SECTION, INCLUDING AT OPEN ENDS AND
<br />a _
<br />I I
<br />ALONG FULL LENGTH.
<br />If
<br />7.
<br />PROVIDE ADDITIONAL OVERHEAD COVERAGE AS REQUIRED BY BOEING
<br />If
<br />FIRE DEPARTMENT.
<br />It
<br />a
<br />I'
<br />I
<br />sl
<br />i
<br />�q
<br />i
<br />I
<br />i
<br />u
<br />8,
<br />DEFER FIRE PROTECTION PIPE SIZING AND ARRANGEMENT TO LICENSED
<br />,I
<br />I
<br />I
<br />w
<br />_
<br />_
<br />�
<br />-
<br />FIRE PROTECTION CONTRACTOR.
<br />T
<br />!I I
<br />If
<br />it
<br />i
<br />I
<br />9.
<br />PROVIDE WET PIPE FIRE SPRINKLER PROTECTION THROUGHOUT THE
<br />TOOL SHOWN ON THIS DRAWING IN ACCORDANCE WITH NFPA-13 AND
<br />BOEING FIRE DEPARTMENT REQUIREMENTS. PROVIDE FIRE SPRINKLERS
<br />r
<br />UNDER ALL GRATED AREAS AND UNDER ALL PLATFORMS. LOCATE
<br />SPRINKLER PIPING IN A NEAT MANNER AND TO PROVIDE ADEQUATE
<br />CLEARANCE FOR PERSONNEL AND EQUIPMENT. COORDINATE PIPE
<br />ROUTING WITH ALL DISCIPLINES AND PROVIDE ADDITIONAL OFFSETS AND
<br />if
<br />��f
<br />SPRINKLERS AS REQUIRED. PROVIDE AUXILIARY DRAINS PER NFPA
<br />I.
<br />10.
<br />PROVIDE FIRE SPRINKLER SYSTEMS IN ACCORDANCE WITH BOEING FIRE
<br />j
<br />II
<br />I
<br />PROTECTION ENGINEERING STANDARD 038108-F, NFPA-13, FM 2-8
<br />I!
<br />I�
<br />--t
<br />_.
<br />AND FM 2-8N, APPLICABLE CODES AND BOEING FIRE DEPARTMENT
<br />_I
<br />—
<br />I
<br />C
<br />'----
<br />r
<br />---
<br />_
<br />I
<br />1
<br />1 E_ .�`_ r r-
<br />_— —=
<br />_
<br />,r,
<br />ni r
<br />��,
<br />17 fi"
<br />r L-
<br />REQUIREMENTS. THE FIRE SPRINKLER CONTRACTOR SHALL PREPARE
<br />;I
<br />— — ---- —---- _ --- — — — — — - -----.,._-----------
<br />— -- — ---- --- -- — — -�
<br />- -- --�.
<br />_- . -..- -- -.-. ---�,, _ -
<br />} - ;------------ - r-- _.: ----
<br />------
<br />----
<br />.— —- - ._._.-------,
<br />-- --
<br />-
<br />-
<br />- --
<br />FIRE SPRINKLER SHOP DRAWINGS AND HYDRAULIC CALCULATIONS IN
<br />I
<br />�
<br />I
<br />I--
<br />ACCORDANCE WITH THESE STANDARDS AND SUBMIT TO BOEING FIRE
<br />`
<br />PROTECTION ENGINEERING FOR APPROVAL AND PERMIT.
<br />11.
<br />FIRE SPRINKLER SHOP DRAWINGS SHALL INCLUDE THE SPRINKLER
<br />- — — -
<br />-
<br />�
<br />-- �
<br />CONTROL VALVE TAG AND LOCATION FOR THE CONTROL VALVE THAT
<br />� m � ®moo
<br />— — — — — — — — — — — — — — — — — — — — — — — — — °�
<br />I
<br />I
<br />— — — — — — — — — — — — — — — — — — — — — — — — — — — — — — —
<br />�
<br />i
<br />I
<br />! �
<br />I
<br />—
<br />SERVES THE AREA.
<br />A -DECK FIRE PROTECTION PLAN
<br />SCALE: 1:50
<br />NEW SHEET
<br />2 ~
<br />D3 AL
<br />A -DECK FIRE PROTECTION PLAN
<br />767 RATE INCREASE - AFT SI
<br />40-32 BUILDING, COL E16-17
<br />www.brph.com Copyright © 2019
<br />Architects Engineers, Inc.
<br />19020 33rd Ave W, Suite 530 Slate of Washington
<br />Lynnwood, Washington, 98036 Ce Architecture
<br />ofAuthorization
<br />425-921-3500 Architecture No.313235512
<br />En9ineerinq No.3137.
<br />IDM
<br />PRODUCT
<br />TYPES
<br />DISCIPLINE1 MECHANICAL
<br />DATE
<br />PLOTTED 07/26/19
<br />STATUS, 90P
<br />STATUS
<br />08/16/19
<br />DATE:
<br />DESIGN
<br />OPTION ID;
<br />REVISIONS
<br />SCALE 1 O
<br />ALL DIMENSIONS IN INCHES
<br />.—
<br />ORG, NO.
<br />CONCURRENCE
<br />DATE
<br />FINISH
<br />COLOR OR PROTECTIVE
<br />SECTION
<br />1 3
<br />SHT SIZE
<br />REV
<br />REV
<br />DATE
<br />—
<br />MODEL
<br />EXCEPT AS NOTED
<br />TOLERANCES MACHINE
<br />DECIMALFINISHX ALxx =± 7
<br />xxx=± ���////
<br />ANGULAR =+ SEE TDM
<br />0E= I— � f � W = f�l
<br />I EBC EVERETT DTVISI❑N
<br />I
<br />NAME
<br />DATE
<br />DESIGNED
<br />D. SMITH
<br />07/26/19
<br />FIRE PROTECTION SYSTEM
<br />BODY SECTIONS 46/48
<br />DETAILED
<br />D. SMITH
<br />07/26/19
<br />FLOOR AREA
<br />APPROX WT
<br />CHECKED
<br />D. SMITH
<br />07/26/19
<br />SEE SHT 1 SEE SHT 1
<br />PROD
<br />CFIG NO
<br />APPROVED
<br />K. BENHAM
<br />07/26/19
<br />USED ON
<br />WORK EVE-18-30055-601
<br />ORDER
<br />APPROVED
<br />FME140T0000-8000
<br />DWG NO, SHT NO. M O "C 0F
<br />DRAWING NO
<br />SHEET
<br />REV
<br />NO
<br />NAME, I
<br />EVERETT FACILITIES SERVER
<br />LAST PROD DRAWING CHANGE
<br />NOR
<br />NAME
<br />FME140T0000-8000_M09
<br />E F
<br />
|