SPECIAL INSPECTION
<br />1. SPECIAL INSPECTION BY A REGISTERED DEPUTY BUILDING INSPECTOR,
<br />IN CONTRACT WITH THE OWNER AND APPROVED BY THE FOR AND THE
<br />BUILDING OFFICIAL, SHALL BE REQUIRED FOR THE FOLLOWING TYPES OF WORK:
<br />BUILDING CODE
<br />REFERENCE
<br />STEEL 1705.2 AND
<br />AISC 360 CHAPTER N
<br />DETAIL VERIFICATION
<br />WELDING OF STRUCTURAL STEEL
<br />WELDING OF REINFORCING STEEL
<br />SHEAR CONNECTORS AND ANCHOR STUDS
<br />HIGH STRENGTH BOLTING
<br />CONCRETE 1705.3
<br />SPECIFIED Vc GREATER THAN 2000 PSI
<br />PLACING OF REINFORCING STEEL
<br />SOIL 1705.6
<br />EXCAVATION
<br />SOIL COMPACTION
<br />SPECIAL SYSTEMS 1705.1.1
<br />EXPANSION/EPDXY ANCHOR BOLTS
<br />SPECIAL INSPECTIONS FOR SEISMIC SYSTEMS 1705.11
<br />STRUCTURAL STEEL CONSTRUCTION
<br />2.
<br />SPECIAL INSPECTIONS SHALL NOT BE REQUIRED WHEN THE WORK IS DONE ON
<br />THE PREMISES OF A FABRICATOR REGISTERED AND APPROVED BY THE BUILDING
<br />OFFICIAL TO PERFORM SUCH WORK WITHOUT SPECIAL INSPECTION. CERTIFICATES OF
<br />COMPLIANCE SHALL BE SUBMITTED TO THE BUILDING OFFICIAL FROM THE
<br />FABRICATORS OR MANUFACTURERS OF THE FOLLOWING COMPONENTS:
<br />STRUCTURAL STEEL
<br />PREFABRICATED STEEL MOMENT FRAMES
<br />3.
<br />ALL PREPARED SOIL -BEARING SURFACES SHALL BE INSPECTED BY THE SOILS
<br />ENGINEER PRIOR TO PLACEMENT OF REINFORCING STEEL.
<br />4.
<br />EPDXY OR EXPANSION TYPE ANCHORS SHALL BE APPROVED BY THE BUILDING
<br />OFFICIAL FOR THEIR USE AND SHALL BE INSTALLED ACCORDING TO THE
<br />MANUFACTURER'S RECOMMENDATIONS AND ICC PRODUCT APPROVAL CONDITIONS.
<br />5.
<br />NONDESTRUCTIVE INSPECTION OF ALL WELDS, SHOP AND FIELD, OF
<br />MOMENT -RESISTING FRAMES SHALL BE PROVIDED IN ACCORDANCE WITH THE
<br />GOVERNING CODE.
<br />6.
<br />SUMMARY REPORTS OF ALL INSPECTIONS AND TEST RESULTS SHALL BE
<br />DISTRIBUTED TO THE OWNER, ARCHITECT, STRUCTURAL ENGINEER, AND
<br />BUILDING OFFICIAL WITH DEFICIENCIES CLEARLY NOTED,
<br />7.
<br />DEFICIENCIES SHALL BE REPORTED TO THE CONTRACTOR ON A DAILY BASIS.
<br />8.
<br />DEFINITIONS OF SPECIAL INSPECTIONS AND TESTING FREQUENCY:
<br />"CONTINUOUS" - THE FULL-TIME OBSERVATION OF WORK REQUIRING
<br />SPECIAL INSPECTION BY AN APPROVED SPECIAL INSPECTOR WHO IS
<br />PRESENT IN THE AREA WHERE THE WORK IS BEING PERFORMED.
<br />"PERIODIC" - THE PART-TIME OR INTERMITTENT OBSERVATION OF WORK
<br />REQUIRING SPECIAL INSPECTION BY AN APPROVED SPECIAL INSPECTOR WHO
<br />IS PRESENT IN THE AREA WHERE THE WORK HAS BEEN OR IS BEING
<br />PERFORMED AND AT THE COMPLETION OF THE WORK.
<br />9.
<br />CONCRETE INSPECTIONS
<br />FOR REFERENCED STANDARDS, SEE IBC 2015 TABLE 1705.3
<br />A. (PER) INSPECT REINFORCEMENT AND VERIFY PLACEMENT.
<br />B. REINFORCING BAR WELDING:
<br />i. (PER) VERIFY WELDABILITY OF REINFORCING BARS OTHER THAN ASTM A706;
<br />ii. (PER) INSPECT SINGLE -PASS FILLET WELDS, MAXIMUM 5/16"; AND
<br />iii. (CONT) INSPECT ALL OTHER WELDS.
<br />C, (PER) INSPECT ANCHORS CAST IN CONCRETE.
<br />D. INSPECT ANCHORS POST -INSTALLED IN HARDENED CONCRETE MEMBERS
<br />i. (CONT) ADHESIVE ANCHORS INSTALLED IN HORIZONTALLY OR UPWARDLY
<br />INCLINED ORIENTATIONS TO RESIST SUSTAINED TENSION LOADS.
<br />ii. (PER) MECHANICAL ANCHORS AND ADHESIVE ANCHORS NOT DEFINED IN 4.A.
<br />E. (PER) VERIFY USE OF REQUIRED DESIGN MIX.
<br />F. (CONT) PRIOR TO CONCRETE PLACEMENT, FABRICATE SPECIMENS FOR
<br />STRENGTH TESTS, PERFORM SLUMP AND AIR CONTENT TESTS, AND DETERMINE
<br />THE TEMPERATURE OF THE CONCRETE.
<br />G. (CONT) INSPECT CONCRETE PLACEMENT FOR PROPER APPLICATION
<br />TECHNIQUES.
<br />H. (PER) VERIFY MAINTENANCE OF SPECIFIED CURING TEMPERATURE AND
<br />TECHNIQUES.
<br />I. (PER) INSPECT FORMWORK FOR SHAPE, LOCATION AND DIMENSIONS OF THE
<br />CONCRETE MEMBER BEING FORMED.
<br />REVISION
<br />BY
<br />APPROVED
<br />DATE
<br />SYM
<br />SYM
<br />ORIG
<br />ACTIVATE STALL
<br />113/777X Cl REFURU 11056813761
<br />CEI
<br />EO
<br />04.08.19
<br />SPECIAL INSPECTION CONT.
<br />9. CONCRETE INSPECTIONS
<br />FOR REFERENCED STANDARDS, SEE IBC 2015 TABLE 1705.3
<br />A. (PER) INSPECT REINFORCEMENT AND VERIFY PLACEMENT.
<br />B. REINFORCING BAR WELDING:
<br />i. (PER) VERIFY WELDABILITY OF REINFORCING BARS OTHER THAN ASTM
<br />A706;
<br />ii. (PER) INSPECT SINGLE -PASS FILLET WELDS, MAXIMUM 5/16"; AND
<br />iii. (CONT) INSPECT ALL OTHER WELDS.
<br />C. (PER) INSPECT ANCHORS CAST IN CONCRETE.
<br />D. INSPECT ANCHORS POST -INSTALLED IN HARDENED CONCRETE MEMBERS
<br />i. (CONT) ADHESIVE ANCHORS INSTALLED IN HORIZONTALLY OR UPWARDLY
<br />INCLINED ORIENTATIONS TO RESIST SUSTAINED TENSION LOADS.
<br />ii. (PER) MECHANICAL ANCHORS AND ADHESIVE ANCHORS NOT DEFINED IN
<br />4.A.
<br />E. (PER) VERIFY USE OF REQUIRED DESIGN MIX.
<br />F. (CONT) PRIOR TO CONCRETE PLACEMENT, FABRICATE SPECIMENS FOR
<br />STRENGTH TESTS, PERFORM SLUMP AND AIR CONTENT TESTS, AND DETERMINE
<br />THE TEMPERATURE OF THE CONCRETE.
<br />G. (CONT) INSPECT CONCRETE PLACEMENT FOR PROPER APPLICATION TECHNIQUES.
<br />H. (PER) VERIFY MAINTENANCE OF SPECIFIED CURING TEMPERATURE AND
<br />TECHNIQUES.
<br />I. (PER) INSPECT FORMWORK FOR SHAPE, LOCATION AND DIMENSIONS OF THE
<br />CONCRETE MEMBER BEING FORMED.
<br />10. SOILS INSPECTIONS
<br />A. (PER) VERIFY MATERIALS BELOW SHALLOW FOUNDATIONS ARE ADEQUATE TO
<br />ACHIEVE THE DESIGN BEARING CAPACITY.
<br />B. (PER) VERIFY EXCAVATIONS ARE EXTENDED TO PROPER DEPTH AND HAVE
<br />REACHED PROPER MATERIAL.
<br />C. (PER) PERFORM CLASSIFICATION AND TESTING OF COMPACTED FILL MATERIALS.
<br />D. (CONT) VERIFY USE OF PROPER MATERIALS, DENSITIES AND LIFT THICKNESSES
<br />DURING PLACEMENT AND COMPACTION OF COMPACTED FILL.
<br />E. (PER) PRIOR TO PLACEMENT OF COMPACTED FILL, INSPECT SUBGRADE AND
<br />VERIFY THAT SITE HAS BEEN PREPARED PROPERLY.
<br />11. STEEL INSPECTIONS
<br />REVISION
<br />A. WELDS, PRIOR TO WELDING
<br />L (CONT) WELDING PROCEDURE SPECIFICATIONS (WPSS) AVAILABLE.
<br />ii. (CONT) MANUFACTURE CERTIFICATIONS FOR WELDING CONSUMABLES
<br />AVAILABLE.
<br />iii. (PER) MATERIAL IDENTIFICATION (TYPE/GRADE).
<br />iv. (PER) WELDER IDENTIFICATION SYSTEM - THE FABRICATOR OR ERECTOR,
<br />AS APPLICABLE, SHALL MAINTAIN A SYSTEM BY WHICH A WELDER WHO
<br />HAS WELDED A JOINT OR MEMBER CAN BE IDENTIFIED.
<br />V. (PER) FIT -UP OR GROVE WELDS (INCLUDING JOINT GEOMETRY)
<br />vi. (PER) CONFIGURATION AND FINISH OF ACCESS HOLES
<br />vii. (PER) FIT -UP OF FILLET WELDS
<br />viii. (PER) CHECK WELDING EQUIPMENT
<br />B. WELDS, DURING WELDING
<br />i. (PER) USE OF QUALIFIED WELDERS
<br />ii. (PER) CONTROL AND HANDLING OF WELDING CONSUMABLES
<br />iii. (PER) NO WELDING OVER CRACKED WELDS.
<br />iv. (PER) ENVIRONMENTAL CONDITIONS
<br />v. (PER) WPS FOLLOWED
<br />vi. (PER) WELDING TECHNIQUES
<br />C. WELDS, AFTER WELDING
<br />i. (PER) WELDS CLEANED
<br />ii. (CONT) SIZE, LENGTH AND LOCATION OF WELDS
<br />iii. (CONT) WELDS MEET VISUAL ACCEPTANCE CRITERIA
<br />iv. (CONT) ARC STRIKES
<br />v. (CONT) K-AREA (WHEN WELDING OF DOUBLER PLATES, CONTINUITY
<br />PLATES OR STIFFENERS HAS BEEN PERFORMED IN THE K-AREA, VISUALLY
<br />INSPECT THE WEB K-AREA FOR CRACKS WITHIN 31N OF THE WELD.
<br />vi. (CONT) BACKING REMOVED AND WELD TABS REMOVED (IF REQUIRED)
<br />vii. (CONT) REPAIR ACTIVITIES
<br />viii. (CONT) DOCUMENT ACCEPTANCE OR REJECTION OF WELDED JOINT
<br />OR MEMBER
<br />BY I APPROVED I DATE
<br />SPECIAL INSPECTION CONT.
<br />D. NONDESTRUCTIVE TESTING
<br />i. CJP WELDS - ULTRASONIC TESTING SHALL BE PERFORMED ON ALL CJP
<br />JOINTS IN MATERIALS 5/16 INCH AND THICKER.
<br />ii. WELD ACCESS HOLES IN MATERIALS 2 INCH OR THICKER - FLANGES
<br />SHALL BE TESTED USING MAGNETIC PARTICLE OR PENETRANT TESTING.
<br />iii. AFTER JOINT COMPLETION, BASE METAL THICKER THAN 1 z INCH WHERE
<br />THE CONNECTED MATERIAL IS GREATER THAN $ INCH, AND CONTAINS CJP
<br />GROOVE WELDS, SHALL BE ULTRASONICALLY TESTED.
<br />iv. REDUCED BEAM SECTION REPAIR - MP TESTING SHALL BE PERFORMED
<br />ON ANY WELD AND ADJACENT AREA OF THE REDUCED BEAM SECTION CUT
<br />SURFACE THAT HAS BEEN REPAIRED BY WELDING, OR ON THE BASE
<br />METAL OF THE REDUCED BEAM SECTION CUT SURFACE IF A SHARP NOTCH
<br />HAS BEEN REMOVED BY GRINDING.
<br />v. WELD TAB REMOVAL SITES - AT THE END OF WELDS, WHERE WELD TABS
<br />HAVE BEEN REMOVED, MPT SHALL BE PERFORMED ON THE SAME
<br />BEAM -TO -COLUMN JOINTS RECEIVING UT.
<br />E. BOLTS, PRIOR TO BOLTING
<br />i. (CONT) MANUFACTURER'S CERTIFICATIONS AVAILABLE FOR FASTENER
<br />MATERIALS
<br />ii. (PER) FASTENERS MARKED IN ACCORDANCE WITH ASTM REQUIREMENTS
<br />iii. (PER) PROPER FASTENERS SELECTED FOR THE JOINT DETAIL (GRADE,
<br />TYPE, BOLT LENGTH IF THREADS ARE. TO BE EXCLUDED FROM SHEAR
<br />PLANE)
<br />iv. (PER) PROPER BOLTING PROCEDURE SELECTED FOR JOINT DETAIL
<br />v. (PER) CONNECTING ELEMENTS, INCLUDING THE APPROPRIATE FAYING
<br />SURFACE CONDITION AND HOLE PREPARATION, IF SPECIFIED, MEET
<br />APPLICABLE REQUIREMENTS
<br />vi. (PER) PRE -INSTALLATION VERIFICATION TESTING BY INSTALLATION
<br />PERSONNEL OBSERVED AND DOCUMENTED FOR FASTENER ASSEMBLIES AND
<br />METHODS USED
<br />vii. (PER) PROPER STORAGE PROVIDED FOR BOLTS, NUTS, WASHERS AND
<br />OTHER FASTENER COMPONENTS
<br />F. BOLTS, DURING BOLTING
<br />i. (PER) FASTENERS ASSEMBLIES, OF SUITABLE CONDITION, PLACED IN ALL
<br />HOLES AND WASHERS (IF REQUIRED) ARE POSITIONED AS REQUIRED
<br />ii. (PER) JOINT BROUGHT TO THE SNUG -TIGHT CONDITION PRIOR TO THE
<br />PRETENSIONING OPERATION
<br />iii. (PER) FASTENER COMPONENT NOT TURNED BY THE WRENCH PREVENTED
<br />FROM ROTATING
<br />iv. (PER) FASTENERS ARE PRETENSIONED IN ACCORDANCE WITH THE RCSC
<br />SPECIFICATION, PROGRESSING SYSTEMATICALLY FROM THE MOST RIGID
<br />POINT TOWARD THE FREE EDGES
<br />SUBMITTALS CONT.
<br />5. CALCS - SUBMIT CALCULATIONS SIGNED AND SEALED BY A DESIGN
<br />PROFESSIONAL AUTHORIZED TO PERFORM WORK IN THE PROJECT
<br />JURISDICTION.
<br />6. "BLDG DEPT" - IF CHECKED, THE SUBMITTALS SHALL BE REVIEWED AND
<br />APPROVED BY THE BUILDING OFFICIAL PRIOR TO FABRICATION AND/OR
<br />INSTALLATION.
<br />7. THE CONTRACTOR SHALL REVIEW, STAMP AND APPROVE SUBMITTALS PRIOR TO REVIEW
<br />BY THE STRUCTURAL ENGINEER. UNREVIEWED OR UNSTAMPED SUBMITTALS WILL BE
<br />RETURNED TO THE CONTRACTOR UNREVIEWED.
<br />8. THE CONTRACTOR SHALL ALLOW TWO WEEKS FOR REVIEW OF SUBMITTALS.
<br />COMMENTS OR MARKS ON SUBMITTALS ARE A NORMAL AND EXPECTED PART OF THE
<br />SUBMITTAL PROCESS AND SHALL NOT BE USED AS A BASIS FOR CHANGE ORDERS.
<br />TIME REQUIRED TO REVISE AND RESUBMIT ANY SUBMITTAL SHALL BE CONSIDERED
<br />INHERENT TO THE SUBMITTAL REVIEW PROCESS AND SHALL NOT BE DEEMED A
<br />CHANGE ORDER.
<br />9. RESUBMITTALS SHALL HAVE ALL REVISIONS CLEARLY IDENTIFIED WITH DRAWING
<br />CLOUDS AND REVISION DATES. THE STRUCTURAL ENGINEER SHALL NOT BE
<br />RESPONSIBLE FOR THE REVIEW OF ANY UNMARKED REVISIONS.
<br />10. CONTRACTOR REQUESTED CHANGES OR SUBSTITUTIONS SHALL BE SUBMITTED IN
<br />WRITING TO THE STRUCTURAL ENGINEER FOR APPROVAL PRIOR TO FABRICATION OR
<br />CONSTRUCTION CHANGES SHOWN ON SHOP DRAWINGS ONLY WILL NOT SATISFY THIS
<br />REQUIREMENT. CONTRACTOR WILL BE RESPONSIBLE FOR ANY ADDITIONAL
<br />ENGINEERING ERROR AND ASSOCIATED FEES REQUIRED FOR REVIEW AND APPROVAL
<br />OF REQUESTED CHANGES AND SUBSTITUTIONS.
<br />STRUCTURAL OBSERVATION
<br />1. STRUCTURAL OBSERVATION IS REQUIRED FOR THE STRUCTURAL SYSTEM IN
<br />ACCORDANCE WITH THE GOVERNING CODE. STRUCTURAL OBSERVATION IS THE
<br />VISUAL OBSERVATION OF THE ELEMENTS AND CONNECTIONS OF THE STRUCTURAL
<br />SYSTEMS AT SIGNIFICANT CONSTRUCTION STAGES AND THE COMPLETED STRUCTURE
<br />FOR GENERAL CONFORMANCE TO THE APPROVED PLANS AND SPECIFICATIONS.
<br />STRUCTURAL OBSERVATION DOES NOT WAIVE THE RESPONSIBILITY FOR THE
<br />INSPECTIONS REQUIRED OF THE BUILDING INSPECTOR OR THE DEPUTY INSPECTOR.
<br />2. THE OWNER SHALL EMPLOY AN ENGINEER OR ARCHITECT LICENSED TO PERFORM
<br />STRUCTURAL OBSERVATION IN THE PROJECT JURISDICTION.
<br />3. THE STRUCTURAL OBSERVER SHALL PROVIDE A LETTER TO BE SUBMITTED TO THE
<br />BUILDING OFFICIAL, AS REQUIRED BY THE JURISDICTION, BEFORE THE FIRST SITE
<br />VISIT. THE STRUCTURAL OBSERVER SHALL ALSO INFORM THE OWNER OF THE
<br />REQUIREMENTS FOR A PRECONSTRUCTION MEETING AND SHALL PRESIDE OVER THIS
<br />MEETING.
<br />G. BOLTS, AFTER BOLTING
<br />4. THE OWNER OR OWNER'S REPRESENTATIVE SHALL COORDINATE COMMUNICATION
<br />i. (CONT) DOCUMENT ACCEPTANCE
<br />OR REJECTION OF BOLTED CONNECTIONS
<br />BETWEEN THE ENGINEER OR ARCHITECT RESPONSIBLE FOR THE STRUCTURAL DESIGN,
<br />STRUCTURAL OBSERVER, CONTRACTOR, AFFECTED SUBCONTRACTORS AND SPECIAL
<br />INSPECTORS. THE PURPOSE OF THIS COMMUNICATION SHALL BE TO IDENTIFY THE
<br />H. OTHER STEEL INSPECTIONS
<br />MAJOR STRUCTURAL ELEMENTS AND CONNECTIONS THAT AFFECT THE VERTICAL AND
<br />j. (PER) VERIFICATION OF STRUCTURAL STEEL DETAILING - VERIFY
<br />LATERAL LOAD SYSTEMS OF THE STRUCTURE AND TO REVIEW SCHEDULING OF THE
<br />COMPLIANCE WITH THE DETAILS
<br />SPECIFIED ON THE STRUCTURAL DRAWINGS.
<br />REQUIRED OBSERVATIONS.
<br />ii. (CONT) ANCHOR RODS/EMBEDS
<br />- VERIFY MATERIAL, GRADE, DIAMETER,
<br />LENGTH AND TYPE OF ELEMENT
<br />AND EMBEDMENT DEPTH.
<br />5. REPORTS SHALL BE ISSUED FOR EACH STRUCTURAL OBSERVATION AND ISSUED TO
<br />iii. (CONT) PROTECTED ZONE - NO
<br />HOLES AND UNAPPROVED ATTACHMENTS
<br />THE OWNER, ARCHITECT, CONTRACTOR AND BUILDING OFFICIAL. A RECORD OF THE
<br />MADE.
<br />PRECONSTRUCTION MEETING NOTED ABOVE SHALL BE INCLUDED IN THE FIRST
<br />iv. (CONT) RBS GEOMETRY REQUIREMENTS, IF APPLICABLE.
<br />OBSERVATION REPORT.
<br />SUBMITTALS
<br />1. THE
<br />FOLLOWING ITEMS SHALL
<br />BE SUBMITTED TO THE STRUCTURAL ENGINEER
<br />FOR
<br />REVIEW AND APPROVAL PRIOR
<br />TO
<br />FABRICATION/ERECTION/INSTALLATION.
<br />THESE ITEMS ARE IN ADDITION
<br />TO ANY
<br />SUBMITTAL REQUIREMENTS SPECIFIED
<br />ON
<br />THESE PLANS OR IN THE
<br />PROJECT
<br />SPECIFICATIONS.
<br />ITEM
<br />PROD
<br />SHOP TEST CALCS
<br />DATA
<br />DWGS RESULTS
<br />A.
<br />STRUCTURAL STEEL
<br />X
<br />B.
<br />CONCRETE
<br />X
<br />X
<br />C.
<br />REINFORCING
<br />X
<br />D. GROUT X
<br />E. EPDXY X
<br />F. EXPANSION ANCHORS X
<br />G. PEMB X X
<br />2. "PROD DATA" - SUBMIT ADEQUATE DOCUMENTATION THAT THE PRODUCT
<br />PROPOSED TO BE USED MEETS THE REQUIREMENTS ON THESE PLANS AND
<br />THE PROJECT SPECIFICATIONS.
<br />3. "SHOP DWGS" - SUBMIT COMPLETE SHOP DRAWINGS SUFFICIENT TO SHOW
<br />QUANTITIES AND KINDS OF MATERIALS, METHODS OF ASSEMBLY, AND ALL
<br />DATA REQUIRED FOR FABRICATION, ERECTION, AND INSTALLATION. THE
<br />PURPOSE OF THESE DRAWINGS IS TO DEMONSTRATE THAT THE CONTRACTOR
<br />UNDERSTANDS THE DESIGN CONCEPT DOCUMENTED HEREIN. SUBMITTALS
<br />CONSISTING OF DRAWINGS TAKEN DIRECTLY FROM THESE PLANS WILL NOT
<br />BE APPROVED.
<br />4. "TEST RESULTS" - SUBMIT RESULTS FOR ANY TESTING REQUIRED BY
<br />BUILDING CODE OR THESE PLANS.
<br />ACCEPTABILITY
<br />CEI
<br />THIS DESIGN AND/OR
<br />CHECKED
<br />SPECIFICATION IS APPROVED
<br />R. REEVES
<br />ENGINEER
<br />APPROVED BY
<br />DEPT.
<br />DATE
<br />K. WANG
<br />CHECKED
<br />E. OJALA
<br />6. THE CONTRACTOR SHALL SCHEDULE EACH OBSERVATION AT LEAST TWO WEEKS PRIOR
<br />TO DATE OF THE PROPOSED OBSERVATION.
<br />7. THE STRUCTURAL OBSERVER SHALL PERFORM OBSERVATIONS AT THE FOLLOWING
<br />SIGNIFICANT CONSTRUCTION STAGES:
<br />CONSTRUCTION STAGES ELEMENTS/CONNECTIONS TO BE OBSERVED:
<br />A) PRIOR TO CONCRETE PLACEMENT/FOUNDATION REINFORCEMENT AND ANCHOR
<br />BLDG BOLTS.
<br />DEPT B) AT SUBSTANTIAL COMPLETION OF THE PRIMARY STRUCTURE.
<br />a
<br />/-BUILDING
<br /># D.Y d 454,
<br />fI
<br />STRUCTURAL MASTER
<br />I S SUE
<br />FDo" U"*'R E R
<br />M
<br />d 1
<br />CURRENT REVISION SYMBOL DATE
<br />22999285/W6214003 0 R I G 04.08.19
<br />SHEET
<br />S2A-3
<br />JOB NO. COMP NO.
<br />22999285/W6214003
<br />DWG N0.
<br />EVERETT, WA 45-005-S2A-3