Laserfiche WebLink
STRUCTURAL ABBREVIATIONS <br />& — AND <br />@ — AT <br />°, DEG — DEGREE <br />0, DIA — DIAMETER <br />(E), EXIST — EXISTING <br />NO <br />— NUMBER <br />LB <br />— POUND <br />AB <br />— ANCHOR BOLT <br />ABV <br />— ABOVE <br />ADDL <br />— ADDITIONAL <br />ADH <br />— ADHESIVE <br />ADJ <br />— ADJACENT <br />AFS <br />— ABOVE FINISHED SLAB <br />ALT <br />— ALTERNATE <br />ALUM <br />— ALUMINUM <br />APPROX <br />— APPROXIMATE <br />AR <br />— AS REQUIRED <br />ARCH <br />— ARCHITECTURAL <br />ASPH <br />— ASPHALT <br />ASSY --- <br />ASSEMBLY <br />B PL <br />— BASE PLATE <br />BLDG <br />— BUILDING <br />BLKG <br />— BLOCKING <br />BLW <br />— BELOW <br />BM(S) <br />— BEAM(S) <br />BO xxx <br />— BOTTOM OF xxx <br />BOT <br />— BOTTOM <br />BRB <br />— BUCKLING RESTRAINED BRACE <br />BRG <br />— BEARING <br />BS <br />— BOTH SIDES <br />BTWN <br />— BETWEEN <br />C <br />— CHANNEL <br />CANT <br />— CANTILEVER <br />CDF <br />— CONTROLLED DENSITY FILL <br />CEM PLAS <br />— CEMENT PLASTER <br />CIP <br />— CAST —IN —PLACE <br />CJ <br />— CONSTRUCTION JOINT/CONTROL JOINT <br />CJP <br />— COMPLETE JOINT PENETRATION WELD <br />CL <br />— CENTER LINE <br />CLR <br />— CLEAR(ANCE) <br />CMU <br />— CONCRETE MASONRY UNIT <br />COL <br />— COLUMN <br />CONC <br />— CONCRETE <br />CONN <br />— CONNECT(ION) <br />CONSTR <br />— CONSTRUCTION <br />CONT <br />— CONTINUOUS <br />CONTR --- <br />CONTRACTOR <br />COORD <br />— COORDINATE <br />CSK <br />— COUNTER SUNK <br />CTR <br />— CENTER(ED) <br />D <br />— DEPTH/DEEP <br />DC <br />— DEMAND CRITICAL <br />DBI <br />— DOUBLE <br />DEG <br />— DEGREE <br />DEMO <br />— DEMOLITION <br />DET <br />— DETAIL <br />DIA <br />— DIAMETER <br />DIAL <br />— DIAGONAL/DIAGRAM <br />DIM <br />— DIMENSION <br />DIR — <br />DIRECTION <br />DIST <br />— DISTANCE <br />DN <br />— DOWN <br />DWG <br />— DRAWING <br />DWL <br />— DOWEL <br />EA <br />— EACH <br />EF <br />— EACH FACE <br />EJ <br />— EXPANSION JOINT <br />EL <br />— ELEVATION <br />ELEC <br />— ELECTRICAL <br />ELEV <br />— ELEVATOR <br />EMBED <br />— EMBEDMENT/EMBEDDED <br />FOR <br />— ENGINEER OF RECORD <br />EOS <br />— EDGE OF SLAB <br />EQ <br />— EQUAL <br />EQL SP <br />— EQUALLY SPACED <br />EQUIP — <br />EQUIPMENT <br />ES — <br />EACH SIDE <br />ESCAL — <br />ESCALATOR <br />EW — <br />EACH WAY <br />EXIST — <br />EXISTING <br />EXP — <br />EXPANSION <br />EXT — <br />EXTERIOR <br />FIN <br />-- FINISH(ED) <br />FLG <br />— FLANGE <br />FL R <br />— FLOOR <br />FO xxx <br />— FACE OF xxx <br />FOC <br />— FACE OF CONCRETE <br />FOF <br />— FACE OF FINISH <br />FOS <br />-- FACE OF STEEL <br />FP <br />-- FIREPROOF(ING)/FIRE PROTECTION <br />FRT <br />— FIRE RETARDANT TREATED <br />FS <br />— FAR SIDE <br />FT <br />— FOOT, FEET <br />FTG <br />— FOOTING <br />GA <br />— GAGE/GAUGE <br />GALV <br />— GALVANIZED <br />GEN <br />— GENERAL <br />GLU LAM <br />— GLUE LAMINATED TIMBER <br />GR <br />— GRADE <br />GR BM <br />— GRADE BEAM <br />GYP BD <br />- GYPSUM BOARD <br />H <br />— HIGH <br />HDR <br />— HEADER <br />HGR <br />— HANGER <br />HLDN <br />— HOLDDOWN <br />HORIZ <br />— HORIZONTAL <br />HSS <br />— HOLLOW STRUCTURAL SECTION <br />HT <br />— HEIGHT <br />HVAC <br />— HEATING, VENTILATING AND <br />AIR CONDITIONING <br />ID <br />— INSIDE DIAMETER <br />IF <br />— INSIDE FACE <br />iJ <br />— ISOLATION JOINT <br />IN <br />— INCHES <br />INFO <br />— INFORMATION <br />INSUL <br />— INSULATE/INSULATION <br />INT <br />— INTERIOR <br />JST <br />— JOIST <br />JT <br />— JOINT <br />KIP <br />— KIP (1,000 POUNDS) <br />KSi <br />— KIPS PER SQUARE INCH <br />KWY <br />— KEYWAY <br />L <br />— ANGLE/LENGTH <br />LBR <br />— LUMBER <br />LLH <br />— LONG LEG HORIZONTAL <br />LLV <br />— LONG LEG VERTICAL <br />LOC <br />— LOCATION <br />LONG <br />— LONGITUDINAL <br />LSH <br />— LONG SLOTTED HOLE <br />/LONG SIDE HORIZONTAL <br />LSV <br />— LONG SIDE VERTICAL <br />LT <br />— LIGHT <br />LWC <br />— LIGHTWEIGHT CONCRETE <br />MAX <br />— MAXIMUM <br />MB <br />— MACHINE BOLT <br />MBR <br />— MEMBER <br />MECH <br />— MECHANICAL <br />MEZZ <br />— MEZZANINE <br />MFR <br />— MANUFACTURE(R/D) <br />MFR REC <br />— MANUFACTURER'S RECOMMENDATIONS <br />MH <br />— MANHOLE <br />MID <br />— MIDDLE <br />MIN <br />— MINIMUM <br />MISC <br />— MISCELLANEOUS <br />NA <br />— NOT APPLICABLE <br />NIC <br />— NOT IN CONTRACT <br />NIP <br />— NOT IN PERMIT <br />NORM <br />— NORMAL <br />NO <br />— NUMBER <br />NS <br />— NEAR SIDE <br />NTS <br />— NOT TO SCALE <br />0/ <br />— OVER <br />OC <br />— ON CENTER <br />OD <br />— OUTSIDE DIAMETER <br />OF <br />— OUTSIDE FACE <br />OFS <br />— OUTSIDE FACE OF STUDS <br />OPH <br />— OPPOSITE HAND <br />OPNG <br />— OPENING <br />OPP <br />- OPPOSITE <br />OVS — OVERSIZED (HOLES) <br />PAF <br />PAR <br />PCC <br />PEN <br />PIL <br />PJP <br />PL <br />PLCS <br />PNL <br />PRCST <br />PREFAB <br />PSF <br />PSI <br />PT <br />PUR <br />R <br />RC <br />RD <br />REF <br />REINF <br />READ <br />RO <br />RST <br />SC <br />SCHED <br />SECT <br />SLRS <br />SHT <br />SHTHG <br />Sim <br />Si <br />SL <br />SMS <br />SPEC <br />SPCS <br />SQ <br />SSH <br />SST <br />STAG <br />STD <br />STI F <br />STIR <br />STL <br />STL JST <br />SLRS <br />STRUCT <br />SYM M <br />TB <br />TBC <br />TBR <br />TD <br />TH K <br />TO xxx <br />TOG <br />TOF <br />TOGB <br />TOS <br />TOSL <br />TOW <br />TRANSV <br />TRTD <br />TYP <br />T/C <br />T&B <br />T&C <br />UON <br />VAR <br />VIF <br />VNR <br />VR FY <br />VERT <br />W <br />WD <br />WF <br />WHS <br />WO <br />WP <br />WPM <br />WT <br />WWF <br />011 <br />W/0 <br />XFMR <br />YD <br />POWDER ACTUATED FASTENER <br />PARALLEL/PARAPET <br />PRECAST CONCRETE <br />PEN ETRATE/PEN ETRATI O N <br />PILASTER <br />PARTIAL JOINT PENETRATION WELD <br />PLATE <br />PLACES <br />PANEL <br />PRECAST <br />PREFABRICATED <br />POUNDS PER SQUARE FOOT <br />POUNDS PER SQUARE INCH <br />POST TENSIONED/PRESSURE TREATED <br />PURLIN <br />RADIUS <br />REINFORCED CONCRETE <br />ROOF DRAIN <br />REFERENCE <br />REINFORCING <br />REQUIRED <br />ROUGH OPENING <br />REINFORCING STEEL <br />SLIP CRITICAL <br />SCHEDULE <br />SECTION <br />SEISMIC LOAD RESISTING SYSTEM <br />SHEET <br />SHEATHING <br />SIMILAR <br />SAWCUT CONTRACTION JOINT <br />SLOPE <br />SHEET METAL SCREW <br />SPECIFICATION <br />SPACES <br />SQUARE <br />SHORT SLOTTED HOLE <br />STAINLESS STEEL <br />STAGGERED <br />STANDARD <br />STIFFENER <br />STIRRUP <br />STEEL <br />STEEL JOIST <br />SEISMIC LOAD RESISTING SYSTEM <br />STRUCTURAL <br />SYMMETRICAL <br />THROUGH BOLT <br />THREADED BAR COUPLER <br />TO BE REMOVED <br />TRENCH DRAIN <br />THICKNESS) <br />TOP OF xxx <br />TOP OF CONCRETE <br />TOP OF FOOTING <br />TOP OF GRADE BEAM <br />TOP OF STEEL <br />TOP OF SLAB <br />TOP OF WALL <br />TRANSVERSE <br />TREATED <br />TYPICAL <br />TENSION/COMPRESSION CORD <br />TOP AND BOTTOM <br />TONGUE AND GROOVE <br />UNLESS OTHERWISE NOTED <br />VARIATION/VARIES <br />VERIFY IN FIELD <br />VENEER <br />VERIFY <br />VERTICAL <br />WIDE/WIDTH <br />WOOD <br />WIDE FLANGE <br />WELDED HEADED STUDS <br />WHERE OCCURS <br />WATERPROOFING/WORK POINT <br />WATERPROOF MEMBRANE <br />WEIGHT <br />WELDED WIRE FABRIC <br />WITH <br />WITHOUT <br />TRANSFORMER <br />— YARD <br />SYM <br />REVISION <br />BY <br />APPROVED <br />DATE SYM <br />I REVISION <br />BY <br />APPROVED <br />DATE <br />ORIG <br />FACTORY PRV/SRV DECK UPGRADE <br />W5805116 <br />CEI <br />EO <br />04.09.20 <br />�® <br />A <br />PERMIT SUBMITTAL <br />W5805116 <br />CEI <br />EO <br />08.19.22 <br />GENERAL NOTES <br />1. THE STRUCTURAL DRAWINGS REPRESENT THE DESIGN OF THE PRIMARY STRUCTURE <br />BASED ON PRESCRIBED LOADS, (SEE "DESIGN CRITERIA" SECTION), IMFOSED ON THE <br />STRUCTURE PER THE BUILDING CODE AS SPECIFIED IN THE "BUILDING CODE" <br />SECTION. THE PRIMARY STRUCTURE OF THE BUILDING IS DEFINED AS THE <br />FOUNDATIONS, BEARING WALLS, SHEAR WALLS, COLUMNS, BEAMS, SLABS, FLOOR <br />FRAMING AND LATERAL FORCE RESISTING ELEMENTS REQUIRED TO MAINTAIN THE <br />STABILITY OF THE COMPLETED STRUCTURE AS A WHOLE. <br />2. ALL CONSTRUCTION MATERIALS AND WORKMANSHIP SHALL CONFORM TO THE <br />REQUIREMENTS OF THE DRAWINGS, SPECIFICATIONS, AND THE CODES, RULES AND <br />REGULATIONS OF THE BUILDING CODE AS DEFINED IN THE "BUILDING CODE" SECTION. <br />3. THE CONTRACT DOCUMENTS REPRESENT THE FINISHED STRUCTURE, THEY DO NOT <br />INDICATE THE METHOD OF CONSTRUCTION. THE CONTRACTOR SHALL PROVIDE ALL <br />MEASURES NECESSARY TO PROTECT THE STRUCTURE DURING CONSTRUCTION. SUCH <br />MEASURES SHALL INCLUDE, BUT NOT BE LIMITED TO, BRACING, SHORING FOR LOADS <br />DUE TO CONSTRUCTION EQUIPMENT, ETC. OBSERVATION VISITS TO THE SITE BY THE <br />STRUCTURAL ENGINEER SHALL NOT INCLUDE INSPECTION OF THE ABOVE ITEMS, <br />4. THE CONTRACTOR SHALL BE RESPONSIBLE FOR TEMPORARY BRACING AS REQUIRED <br />FOR THE STRUCTURE AND STRUCTURAL COMPONENTS UNTIL ALL MEMBERS ARE IN <br />PLACE AND FINAL CONNECTIONS HAVE BEEN COMPLETED IN ACCORDANCE WITH THE <br />PLANS. <br />5. CONSTRUCTION TOLERANCES SHALL CONFORM TO THE BUILDING STANDARDS <br />SPECIFIED IN THE "BUILDING CODE" SECTION. <br />6. THE CONTRACTOR SHALL VERIFY ALL DIMENSIONS PRIOR TO CONSTRUCTION. THE <br />FOR SHALL BE NOTIFIED OF ANY DISCREPANCIES OR INCONSISTENCIES. <br />7. IF ANY ERRORS OR OMISSIONS APPEAR TO EXIST IN THESE DRAWINGS, <br />SPECIFICATIONS, OR OTHER CONTRACT DOCUMENTS; THE CONTRACTOR SHALL NOTIFY <br />THE STRUCTURAL ENGINEER OR ARCHITECT IN WRITING Or SUCH OMISSION OR ERROR <br />BEFORE PROCEEDING WITH THE WORK. <br />8. NOTES AND DETAILS SHALL TAKE PRECEDENCE OVER GENERAL NOTES AND TYPICAL <br />DETAILS. WHERE NOTES AND DETAILS ON DRAWINGS AND THESE GENERAL NOTES <br />AND TYPICAL DETAILS ARE IN CONFLICT WITH THE PROJECT SPECIFICATIONS, THE <br />MOST STRINGENT SHALL APPLY. CONDITIONS NOT SPECIFICALLY SHOWN SHALL BE <br />CONSTRUCTED AS SHOWN FOR SIMILAR WORK, SUBJECT TO REVIEW BY THE <br />FOR AND STRUCTURAL ENGINEER. <br />9. MANUFACTURED MATERIALS SHALL BE APPROVED BY THE BUILDING OFFICIAL PRIOR <br />TO THEIR USE. ALL REQUIREMENTS OF THOSE APPROVALS SHALL BE FOLLOWED, <br />10. SEE MECHANICAL, PLUMBING, ELECTRICAL AND OTHER SPECIALTY DRAWINGS AND <br />PROJECT SPECIFICATIONS FOR THE FOLLOWING: <br />A. PIPE RUNS, SLEEVES, HANGERS, TRENCHES, WALL, ROOF AND FLOOR <br />OPENINGS, ETC., NOT SHOWN OR NOTED. <br />B. ELECTRICAL CONDUIT RUNS, BOXES, OUTLETS IN WALLS AND SLABS. <br />C. ANCHORAGE AND BRACING FOR ELECTRICAL, MECHANICAL OR PLUMBING <br />EQUIPMENT TO THE STRUCTURE. <br />D. ANCHOR BOLTS FOR MOTOR MOUNTS. <br />E. SIZE, WEIGHT AND LOCATION OF MACHINES AND EQUIPMENT BASES, <br />11. FRAMING MEMBERS WHICH ARE NOT DIMENSIONED SHALL BE EQUALLY SPACED <br />BETWEEN DIMENSIONED POINT OF MEMBERS. <br />12. OPENINGS, POCKETS, ETC. SHALL NOT BE PLACED IN STRUCTURAL MEMBERS UNLESS <br />SPECIFICALLY DETAILED ON THE STRUCTURAL DRAWINGS. <br />13. MATERIALS SPECIFICATIONS ARE ASTM LATEST EDITION. <br />BUILDING CODE <br />A <br />1. ALL CONSTRUCTION, MATERIALS, AND WORKMANSHIP SHALL <br />CONFORM TO THE <br />REQUIREMENTS OF THESE DRAWINGS, SPECIFICATIONS, AND <br />THE CODES, RULES <br />AND <br />REGULATIONS OF THE INTERNATIONAL BUILDING CODE (IBC), <br />2018 EDITION, AS <br />ADOPTED AND AMENDED BY THE CITY OF EVERETT, HEREINAFTER REFERRED TO <br />AS <br />THE BUILDING CODE. <br />e <br />2. WHERE NOTED IN THE STRUCTURAL NOTES, CONSTRUCTION, <br />MATERIALS, AND <br />WORKMANSHIP SHALL ALSO CONFORM TO THE FOLLOWING STANDARDS, WHERE THESE <br />STANDARDS CONFLICT WITH THE BUILDING CODE, THE CODE <br />SHALL GOVERN. <br />4 <br />GENERAL <br />ASCE "MINIMUM DESIGN LOADS FOR BUILDINGS AND <br />OTHER STRUCTURES" <br />AMERICAN SOCIETY OF CIVIL ENGINEERS <br />ASCE/SET 7 — 2016 EDITION <br />HOT ROLLED STEEL <br />AISC "SPECIFICATION FOR STRUCTURAL STEEL BUILDINGS" <br />AMERICAN INSTITUTE OF STEEL CONSTRUCTION <br />ANSI/AISC360 — 2016 EDITION <br />AISC "SPECIFICATION FOR STRUCTURAL JOINTS USING ASTM A325 OR A490 <br />BOLTS" <br />RESEARCH COUNCIL ON STRUCTURAL CONNECTIONS <br />JUTE 30, 2014 <br />AISC-303 "CODE OF STANDARD PRACTICE FOR STEEL BUILDINGS AND BRIDGES" <br />AMERICAN INSTITUTE OF STEEL CONSTRUCTION <br />AISC303 2016 EDITION <br />j� <br />ACCEPTABILITY <br />S,`­SARVER <br />WA <br />THIS DESIGN AND/OR <br />CHECKED <br />SPECIFICATION IS APPROVED <br />K. WANG <br />— <br />—ENGINEER <br />APPROVED BY <br />DEPT. <br />DATE <br />K. WANG <br />CHECKED <br />E. OJAL A <br />DESIGN CRITERIA <br />1. <br />LIVE LOAD CRITERIA <br />ELEVATED PLATFORM <br />100 PSF PER BOEING STANDARDS <br />ROOF (REDUCIBLE) <br />20 PSF <br />2. <br />SEISMIC DESIGN CRITERIA <br />SEISMIC USE GROUP <br />II <br />SITE CLASS <br />D <br />IMPORTANCE FACTOR I = <br />SS = <br />S1 = <br />SDS = <br />CO.495 <br />SDI = <br />SEISMIC DESIGN CATEGORY <br />LATITUDE <br />47°55'56° N <br />LONGITUDE <br />122' 16'55° W <br />3. <br />DEAD LOAD CRITERIA <br />ROOF <br />21 PSF <br />SELF WEIGHT OF STRUCTURE <br />4. <br />SNOW LOAD CRITERIA <br />ROOF <br />25 PSF <br />A. SNOW LOAD > 13 PSF <br />REDUCE CRANE LIFT CAPACITY FOR EACH <br />SINGLE CAB (68,000 LBS) <br />BY 12,000 LBS FOR EVERY ADDITIONAL 1 <br />PSF PER BOEING. <br />5. <br />CRANE LOAD CRITERIA <br />34 TON CAPACITY <br />A. SEE SNOW LOAD CRITERIA FOR LIFT CAPACITY <br />REDUCTION. <br />EXISTING CONSTRUCTION <br />1. EXISTING STRUCTURAL DIMENSIONS AND MEMBERS SIZES ARE FOR REFERENCE ONLY. <br />CONTRACTOR SHALL VERIFY ALL DIMENSIONS IN THE FIELD PRIOR TO FABRICATION. <br />THE CONTRACTOR SHALL VERIFY THE ACTUAL CONFIGURATION OF EXISTING <br />CONSTRUCTION AND THE CONDITION OF THE STRUCTURE BEFORE BEGINNING WORK. <br />ANY DISCREPANCIES OR UNSOUND CONDITIONS SHALL BE REPORTED TO THE <br />ENGINEER FOR RESOLUTION BEFORE BEGINNING WORK. REFER TO MECHANICAL, <br />PLUMBING AND ELECTRICAL PLANS FOR DUCTS, PIPING, EMBEDMENTS, AND OPENINGS <br />NOT SHOWN. <br />2. TEMPORARY SHORING AND BRACING MAY BE NECESSARY IN ORDER TO PERFORM THE <br />NECESSARY STRUCTURAL MODIFICATIONS TO THE EXISTING STRUCTURE SHOWN ON <br />THE STRUCTURAL AND ARCHITECTURAL DRAWINGS. THE CONTRACTOR MUST SUBMIT <br />PLANS AND SUPPORTING CALCULATIONS PREPARED BY A DESIGN PROFESSIONAL <br />LICENSED I0 PERFORM WORK IN THE PROJECT JURISDICTION. <br />3. WHERE NEW STRUCTURAL WORK IS BEING PERFORMED, THE CONTRACTOR SHALL <br />VERIFY ALL DIMENSIONS AS REQUIRED PRIOR TO CONSTRUCTION. ANY <br />DISCREPANCIES SHALL BE REPORTED TO THE FOR FOR RESOLUTION PRIOR TO <br />BEGINNING WORK. <br />4. EXISTING CONSTRUCTION, FRAMING MEMBERS AND DIMENSIONS HAVE BEEN <br />ESTABLISHED BASED ON REVIEW OF THE AVAILABLE CONSTRUCTION DRAWINGS FOR <br />THE ORIGINAL BUILDING. ONLY LIMITED FIELD VERIFICATION HAS BEEN PERFORMED. <br />ANY DISCREPANCIES CONCERNING HOW NEW WORK RELATED TO THE AS —BUILT <br />CONSTRUCTION SHALL BE REPORTED TO THE ARCHITECT/ENGINEER FOR RESOLUTION <br />PRIOR TO BEGINNING WORK, <br />5. UNLESS SPECIFIED OTHERWISE, LOCATION AND ELEVATION OF NEW STRUCTURAL <br />ELEMENTS WITHIN THE EXISTING STRUCTURE ARE DETERMINED BY THEIR RELATIONSHIP <br />TO EXISTING CONDITIONS. THESE RELATIONSHIPS ARE NOTED ON THE PLANS, <br />SECTIONS AND DETAILS. <br />6. WHEN PROVIDED, DEMOLITION DRAWINGS INDICATE DEMOLITION EXTENT ASSOCIATED <br />WITH THE ACTUAL SIZE OF THE NEW ELEMENT. THE EXTENT OF DEMO MAY NOT <br />REFLECT ADDITIONAL DEMOLITION REQUIRED TO INSTALL NEW ELEMENTS, IN ADDITION <br />TO WHAT IS SHOWN ON THE ARCHITECTURAL DEMOLITION DRAWINGS, MINOR LOCAL <br />DEMOLITION OF EXISTING ELEMENTS MAY BE REQUIRED TO PERFORM THE <br />STRUCTURAL WORK AS INDICATED ON THE PLANS, SECTIONS AND DETAILS. <br />GENERAL CONTRACTOR TO FIELD SURVEY ALL DIMENSIONS REQUIRED <br />TO COMPLETE THE WORK INDICATED IN THESE DRAWINGS, THESE <br />FIELD VERIFIED DIMENSIONS SHALL BE PROVIDED TO STEEL FABRICATOR <br />FOR INCORPORATION INTO THE SHOP DRAWINGS PRIOR TO REVIEW. <br />PERMIT SUBMITTAL <br />ISSUE FAR CONSTRUCTION <br />Permit#: B2208-113 ROLLED PLANS <br />Site Address: 3003 W CASINO RD RLDG: 40-21 & 4 -31 <br />Owner: <br />BOEING COMPANY <br />Tenant: <br />BOEING COMPANY <br />App. Date: <br />8/29/2022 <br />Proposed Use: <br />COMMERCIAL ALTERATIONS <br />Description: <br />BLOC: 21 & 40-31 UPGRADE & <br />MODIFICATION TO HPS <br />Reviewed By ';ems Date tr ;may <br />Off ice Set <br />lob Site SetFire/PlanningSet <br />"I <br />VIEWED FOR PERMIT <br />A* <br />A COFFMAN <br />1101 2nd Avenue, Suite 400 <br />Seattle, WA 98101 <br />h 206.623.0717 <br />www.coffman.ccrn <br />4TE SUBTITLE CURRENT REVISION <br />04.09.20STRUCTURAL ABBREVIATIONS AND NOTES W5805116 <br />04.09.20 SHEET <br />UH I C. <br />08.19.22 <br />R/1 R/gt17g <br />