STATEMENT OF SPECIAL INSPECTIONS 2018 IBC <br />1. THE OWNER SHALL HIRE AN INDEPENDENT TESTING/INSPECTION AGENCY TO PERFORM REQUIRED SPECIAL <br />INSPECTIONS IN ACCORDANCE WITH SECTION 1704.2 OF THE INTERNATIONAL BUILDING CODE (IBC). <br />2. THE STATEMENT OF SPECIAL INSPECTIONS HEREIN IS FULFILLMENT OF THE REQUIREMENTS OF IBC SECTIONS 1704 <br />AND 1705. <br />3. SPECIAL INSPECTIONS AND TESTING SHALL BE PERFORMED IN ACCORDANCE WITH THE APPROVED PLANS AND <br />SPECIFICATIONS, THIS STATEMENT, IBC CHAPTER 17 AND ITS REFERENCED STANDARDS. <br />4. THE SPECIAL INSPECTOR SHALL OBSERVE THE WORK FOR COMPLIANCE WITH THE JURISDICTION APPROVED PLANS, <br />SPECIFICATIONS, AND APPLICABLE PROVISIONS OF THE IBC. THE ARCHITECT/ENGINEER'S REVIEWED SHOP DRAWINGS, <br />AND/OR PLACEMENT DRAWINGS, MAY BE USED ONLY AS AN AID TO SPECIAL INSPECTIONS. THE DEFINITIONS FOR <br />ACTIONS OR FREQUENCIES OF INSPECTIONS ARE AS FOLLOWS: <br />A. "CONTINUOUS", FULL-TIME OBSERVATION OF WORK REQUIRING SPECIAL: INSPECTION BY AN APPROVED <br />SPECIAL INSPECTOR WHO IS PRESENT IN THE AREA WHERE THE WORK IS BEING PERFORMED. <br />B. "PERIODIC", INTERMITTENT OBSERVATION OF WORK REQUIRING SPECIAL INSPECTION BY AN APPROVED <br />SPECIAL INSPECTOR WHO IS PRESENT IN THE AREA WHERE THE WORK IS BEING PERFORMED AND AT THE <br />COMPLETION OF THE WORK. <br />C. "OBSERVE" THESE ITEMS ON A RANDOM BASIS (AISC). OPERATIONS NEED NOT BE DELAYED PENDING <br />THESE INSPECTIONS. <br />D. "PERFORM" THESE TASKS FOR EACH BOLTED CONNECTION, WELDED JOINT, OR MEMBER (AISC). <br />5. THE SPECIAL INSPECTOR SHALL COMPLETE A DAILY REPORT FOR INSPECTIONS. THE DAILY REPORTS SHALL REMAIN AT <br />THE JOB SITE WITH THE CONTRACTOR FOR THE BUILDING OFFICIAL'S INSPECTOR. THE REPORTS SHALL INCLUDE THE <br />FOLLOWING. <br />A. NAME OF SPECIAL INSPECTOR AND DATE THE INSPECTION WAS PERFORMED. <br />B. DESCRIPTION OF THE INSPECTIONS, WITH LOCATIONS AND TESTS PERFORMED. <br />C. LIST OF NON -CONFORMING ITEMS. <br />D. HOW NON -CONFORMING ITEMS WERE RESOLVED OR UNRESOLVED. <br />E. LIST OF CHANGES OR CORRECTIONS TO NON -CONFORMING ISSUES.AUTHORIZED BY THE ENGINEER, <br />ARCHITECT, OR BUILDING OFFICIAL'S INSPECTORS. <br />6. THE INSPECTOR SHALL BRING NONCONFORMING ITEMS TO THE IMMEDIATE ATTENTION OF THE CONTRACTOR, AND <br />NOTE ALL SUCH ITEMS IN THE DAILY REPORT. IF ANY ITEM IS NOT RESOLVED IN A TIMELY MANNER AND IS ABOUT TO BE <br />INCORPORATED IN THE WORK, THE SPECIAL INSPECTORS SHALL IMMEDIATELY NOTIFY THE ENGINEER OF RECORD. <br />7. THE INSPECTION AGENCY SHALL FURNISH MONTHLY REPORTS OF THE TEST AND INSPECTIONS PERFORMED DIRECTLY <br />TO THE BUILDING OFFICIAL, ENGINEER OF RECORD, AND/OR OTHERS AS DESIGNATED, <br />8. THE INSPECTION AGENCY SHALL SUBMIT A FINAL SIGNED AND SEALED REPORT TO THE BUILDING OFFICIAL STATING <br />THAT ALL ITEMS REQUIRING SPECIAL INSPECTIONS AND TESTING WERE FULFILLED; ALL DISCREPANCIES WERE <br />CORRECTED OR RESOLVED, AND ALL WORK REQUIRING SPECIAL INSPECTIONS IS IN CONFORMANCE WITH THE <br />APPROVED DESIGN DRAWINGS AND SPECIFICATIONS AND APPLICABLE CODES. ANY ITEMS UNRESOLVED OR <br />DISCREPANCIES IN COVERAGE (I.E. MISSED INSPECTIONS, PERIODIC INSPECTIONS WHEN CONTINUOUS WAS <br />REQUIRED, ETC) SHALL BE SPECIFICALLY ITEMIZED IN THE REPORT. <br />9. SPECIAL INSPECTION AND TEST REQUIREMENTS FOR CERTAIN BUILDING ELEMENTS IMPLIED BY THE STATEMENT OF <br />SPECIAL INSPECTIONS YET LISTED AS EXEMPT BY IBC IS PERMITTED TO BE WAIVED WITH WRITTEN APPROVAL FROM <br />THE ENGINEER OF RECORD... <br />10. REQUIREMENTS FOR WIND RESISTANCE: <br />STATEMENT OF SPECIAL INSPECTION FOR WIND RESISTANCE IS NOT REQUIRED. (REQUIRED IN WIND EXPOSURE <br />CATEGORY B, WHERE THE NOMINAL DESIGN WIND SPEED, Vasd IS 120 MPH OR GREATER. REQUIRED IN WIND <br />EXPOSURE CATEGORY C OR D, WHERE THE NOMINAL DESIGN WIND SPEED, Vasd IS 110 MPH OR GREATER.) <br />11. EACH CONTRACTOR RESPONSIBLE FOR THE CONSTRUCTION OR FABRICATION OF A SYSTEM OR COMPONENT <br />DESCRIBED ABOVE SHALL SUBMIT A WRITTEN STATEMENT OF RESPONSIBILITY TO THE BUILDING OFFICIAL AND OWNER <br />OR THE OWNER'S AUTHORIZED AGENT PRIOR TO THE COMMENCEMENT OF WORK ON THE SYSTEM OR COMPONENT IN <br />ACCORDANCE WITH IBC 1704.4. REQUIREMENTS FOR SEISMIC RESISTANCE: <br />STATEMENT OF SPECIAL INSPECTION FOR SEISMIC RESISTANCE IS REQUIRED. <br />DESCRIPTION OF SEISMIC FORCE -RESISTING SYSTEM SUBJECT TO SPECIAL INSPECTION AND TESTING FOR SEISMIC <br />RESISTANCE: (REQUIRED FOR SEISMIC DESIGN CATEGORIES C, D, E, OR F IN ACCORDANCE WITH IBC SECTIONS <br />1705.12.1 THROUGH 1705.12.3, 1705.13.1, AND 1705.13.2.) <br />STEEL INTERMEDIATE MOMENT FRAMES <br />EACH CONTRACTOR RESPONSIBLE FOR THE CONSTRUCTION OR FABRICATION OF ASYSTEM OR COMPONENT <br />DESCRIBED ABOVE SHALL SUBMIT A WRITTEN STATEMENT OF RESPONSIBILITY TO THE BUILDING OFFICIAL AND OWNER <br />OR THE OWNER'S AUTHORIZED AGENT PRIOR TO THE COMMENCEMENT OF WORK ON THE SYSTEM OR COMPONENT IN <br />ACCORDANCE WITH IBC 1704.4. <br />12. THIS STATEMENT OF SPECIAL INSPECTION HAS BEEN PREPARED BY THE ENGINEER OF RECORD WITH THE <br />UNDERSTANDING THAT THE BUILDING OFFICIAL WILL: <br />A. REVIEW AND APPROVE THE QUALIFICATIONS OF THE SPECIAL INSPECTORS WHO WILL <br />PERFORM THE INSPECTIONS. <br />B. MONITOR SPECIAL INSPECTION ACTIVITIES ON THE JOB SITE TO ASSURE THAT THE SPECIAL INSPECTORS ARE <br />QUALIFIED AND PERFORMING THEIR DUTIES AS CALLED FOR IN THE STATEMENT OF SPECIAL INSPECTION. <br />C. REVIEW SUBMITTED INSPECTION REPORTS. <br />D; PERFORM INSPECTIONS AS REQUIRED BY THE LOCAL BUILDING CODE. <br />E. ISSUE CERTIFICATIONOF OCCUPANCY AFTER ALL SPECIAL INSPECTION REPORTS AND THE FINAL SPECIAL <br />INSPECTION REPORT HAVE BEEN SUBMITTED AND ACCEPTED. <br />REVISION <br />CONCRETE CONSTRUCTION (IBC 9 : <br />ITEM <br />FREQUENCY OF INSPECTION <br />INSTRUCTIONS <br />VERIFY PRIOR TO PLACING CONCRETE THAT REINFORCING IS OF <br />SPECIFIED TYPE, GRADE AND SIZE; THAT IT, IS FREE OF OIL, DIRT <br />AND RUST; THAT IT IS LOCATED AND SPACED PROPERLY; THAT <br />REINFORCING STEEL <br />CONTINUOUS <br />PERIODIC / <br />HOOKS, BEND, TIES, STIRRUPS AND SUPPLEMENTAL <br />REINFORCEMENT ARE PLACED CORRECTLY; THAT LAP LENGTHS, <br />STAGGER AND OFFSETS ARE PROVIDED; AND THAT ALL <br />MECHANICAL CONNECTIONS ARE INSTALLED PER THE <br />MANUFACTURER'S INSTRUCTIONS AND/OR EVALUATION REPORT. <br />CAST -IN BOLTS & EMBEDS <br />CONTINUOUS <br />PERIODIC <br />INSPECT ANCHORS CAST IN CONCRETE. <br />ANCHORS POST -INSTALLED IN HARDENED <br />CONCRETE MEMBERS: ADHESIVE ANCHORS <br />INSTALLED IN HORIZONTALLY OR UPWARDLY <br />CONTINUOUS <br />PERIODIC <br />ANCHORS/DOWELS SHALL BE SPECIALLY INSPECTED AS <br />INCLINED ORIENTATIONS TO RESIST SUSTAINED <br />REQUIRED BY THE APPROVED ICC-ES REPORT. <br />TENSION LOADS <br />ANCHORS POST -INSTALLED IN HARDENED <br />CONCRETE MEMBERS: MECHANICAL ANCHORS AND <br />INSTALLED IN DOWNWARD <br />CONTINUOUS <br />PERIODIC <br />ANCHORS/DOWELS SHALL BE SPECIALLY INSPECTED AS <br />ADHESIVE ANCHORS <br />REQUIRED BY THE APPROVED ICC-ES REPORT. <br />ORIENTATIONS NOT SUBJECTED TO SUSTAINED <br />TENSION LOADS <br />VERIFY THAT ALL MIXES USED COMPLY WITH THE APPROVED <br />USE OF REQUIRED MIX DESIGN <br />CONTINUOUS <br />PERIODIC 0 <br />CONSTRUCTION DOCUMENTS; ACI 318;CH 19, 26.4.3, 26.4.4; <br />AND IBC 1904.1, 1904.2, 1908.2, 1908.3 <br />PRIOR TO CONCRETE PLACEMENT, FABRICATE SPECIMENS FOR <br />CONCRETE TESTS <br />CONTINUOUS <br />PERIODIC 11 <br />STRENGTH TESTS, PERFORM SLUMP AND AIR CONTENT TESTS, <br />AND DETERMINE THE TEMPERATURE OF THE CONCRETE. <br />CONCRETE PLACEMENT <br />CONTINUOUS <br />PERIODIC <br />INSPECT CONCRETE PLACEMENT FOR PROPER APPLICATION <br />TECHNIQUES. <br />VERIFY THAT THE AMBIENT TEMPERATURE FOR CONCRETE IS <br />KEPT AT > 50OF FOR AT LEAST 7 DAYS AFTER PLACEMENT. <br />HIGH -EARLY -STRENGTH CONCRETE SHALL BE KEPT AT >50°F <br />FOR AT LEAST 3 DAYS. ACCELERATED CURING METHODS MAY <br />BE USED (SEE ACI 318:26.4.7 - 26.4.9). THE AMBIENT <br />TEMPERATURE FOR SHOTCRETE SHALL BE >40°F FOR THE <br />CURING TEMPERATURE AND TECHNIQUES <br />CONTINUOUS El <br />PERIODIC <br />SAME PERIOD OF TIME AS NOTED FOR CONCRETE. SHOTCRETE <br />SHALL BE KEPT CONTINUOUSLY MOIST FOR AT LEAST 24 <br />HOURS AFTER SHOTCRETING. ALL CONCRETE MATERIALS, <br />REINFORCEMENT, FORMS, FILLERS, AND GROUND SHALL BE <br />FREE FROM FROST. IN HOT WEATHER CONDITIONS ENSURE <br />THAT APPROPRIATE MEASURES ARE TAKEN TO AVOID PLASTIC <br />SHRINKAGE CRACKING AND THAT THE SPECIFIED <br />WATER/CEMENT RATIO IS NOT EXCEEDED. <br />VERIFY THAT ADEQUATE STRENGTH HAS BEEN ACHIEVED PRIOR <br />STRENGTH VERIFICATION <br />CONTINUOUS <br />PERIODIC <br />TO THE REMOVAL OF SHORES AND FORMS OR THE STRESSING <br />OF POST -TENSIONED TENDONS. <br />FORMWQRK <br />CONTINUOUS <br />PERIODIC <br />VERIFY THAT THE FORMS ARE PLACED PLUMB AND CONFORM <br />TO THE SHAPES, LINES, AND DIMENSIONS OF THE MEMBERS AS <br />REQUIRED BY THE APPROVED CONSTRUCTION DOCUMENTS. <br />ITEM <br />INSPECTION ACTION <br />INSTRUCTIONS <br />ALL MEMBERS INDICATED AS SFRS SHALL BE SUBJECT TO THE <br />QUALITY ASSURANCE PLAN IN ACCORDANCE WITH CHAPTER J PER <br />AISC 341-10. MT TEST 100% OF ALL PARTIAL PENETRATION WELDS <br />AT COLUMN BASES AND COLUMN SPLICES IN SFRS. AFTER AT <br />LEAST (20)- PJP WELDS HAVE BEEN MT TESTED, THE TESTING <br />INSPECTION OF STRUCTURAL WELDING IN <br />PERFORM <br />OBSERVE <br />RATE MAY BE REDUCED TO 10% PROVIDED THE REJECTION RATE <br />ACCORDANCE WITH AISC SEISMIC <br />IS 5% OR LESS FOR A PARTICULAR WELDER. AT LARGE PARTIAL <br />PROVISIONS <br />PENETRATION WELDS (V GROOVES AND LARGER), UT TEST 100% <br />CJP GROOVE WELDS AT BRACING REINFORCING PLATES. AFTER <br />(40)- CJP GROOVE WELDS HAVE BEEN UT TESTED, THE TESTING <br />RATE MAY BE REDUCED TO 25% PROVIDED THE REJECTION RATE <br />ID 5% OR LESS FOR A PARTICULAR WELDER. <br />WELDING OF SEISMIC FORCE RESISTING SYSTEM SHALL <br />MEET THE REQUIREMENTS OF AWS D1.8/D1.8M INCLUDING <br />THE FOLLOWING SECTIONS AND ANNEXES: <br />WELDING INSPECTION AND NON-DESTRUCTIVE <br />TESTING SHALL MEET REQUIREMENTS OF AWS <br />PERFORM <br />OBSERVE <br />1. GENERAL REQUIREMENTS <br />7. INSPECTION <br />D1.8/D1.8M <br />ANNEX F. SUPPLEMENTAL ULTRASONIC TECHNICIAN TESTING. <br />ANNEX G. SUPPLEMENTAL MAGNETIC PARTICLE TESTING <br />PROCEDURES. <br />ANNEX H. FLAW SIZING BY ULTRASONIC TESTING. <br />PROTECTED ZONES <br />PERFORM 171 <br />OBSERVE <br />VERIFY THAT NO HOLES OR UNAPPROVED ATTACHMENTS ARE MADE <br />WITHIN THE PROJECTED ZONE (SEE TABLE J84 OF AISC 341-10). <br />WEB WHERE WELDING OF DOUBLER PLATES <br />CONTINUITY PLATES OR STIFFENERS ARE. <br />PERFORMED IN k-AREA <br />PERFORM <br />OBSERVE <br />NDT PER SECTION J6.2a. <br />COMPLETE -JOINT -PENETRATION (CJP) GROOVE <br />PERFORM <br />OBSERVE <br />NDT PER SECTION J6.2b. PERCENTAGE OF TESTING IS <br />WELDS IN MATERIALS 5/16-INFH THICK OR GREATER <br />PERMITTED TO BE REDUCED PER SECTIONS J6.20 AND J6.2h. <br />BASE METAL THICKER THAN 1-1/2-INCH LOADED IN <br />TENSION IN THE THROUGH-T�ICKNESS DIRECTION <br />NDT PER SECTION J6.2c. USE ASTM A435 OR ASTM A898 (LEVEL 1 <br />IN TEE AND CORNER JOINTS WHERE THE <br />PERFORM <br />OBSERVE <br />CRITERIA) AS BASIS FOR ACCEPTANCE OF ANY MATERIAL <br />CONNECTED MATERIAL IS > q/4 INCH AND <br />DISCONTINUITIES. <br />CONTAINS CJP GROOVE WELDS <br />THERMALLY CUT SURFACES PF BEAM COPES AND <br />ACCESS HOLES AT WELDED SPLICES AND PERFORM OBSERVE NDT PER SECTION J6.2d. <br />CONNECTIONS <br />REDUCED REAM SECTION (RSS) REPAIR PERFORM OBSERVE NDT PER SECTION J6.2e. <br />WELD TAB REMOVAL. SITES <br />PERFORM <br />OBSERVE <br />NDT PER SECTION J6.2f. <br />DESIGNATEDI IC SYSTEMS (IBC 17 ® a)3 <br />ITEM <br />FREQUENCY OF INSPECTION <br />INSTRUCTIONS <br />INSPECT AND VERIFY THAT THE COMPONENT LABEL, ANCHORAGE, <br />DESIGNATED SEISMIC SYSTEMS VERIFICATION <br />CONTINUOUS <br />PERIODIC <br />OR MOUNTING CONFORMS TO THE CERTIFICATE OF COMPLIANCE <br />IN ACCORDANCE WITH SECTION 1705.13.3. <br />ARCHITECTURAL TS (113C 17 a1 17 ®1a7)® <br />ITEM <br />FREQUENCY OF INSPECTION <br />INSTRUCTIONS <br />ANCHORAGE OF ELECTRICAL EQUIPMENT <br />VERIFY THAT ANCHORAGE COMPLIES WITH APPROVED <br />FOR EMERGENCY OR STANDPY POWER <br />CONTINUOUS <br />PERIODIC <br />CONSTRUCTION DOCUMENTS. PERFORMED BY CODE INSPECTION <br />SYSTEMS <br />FIRM. <br />INSTALLATION AND ANCHORAGE OF PIPING <br />VERIFY THAT INSTALLATION AND RESISTANT COMPLY WITH <br />SYSTEMS CARRYING FLAMMABLE, COMBUSTIBLE <br />CONTINUOUS <br />PERIODIC <br />APPROVED CONSTRUCTION DOCUMENTS. PERFORMED BY CODE <br />OR HIGHLY TOXIC MATERIALS <br />INSPECTION FIRM. <br />INSTALLATION AND ANCHORAGE OF HVAC <br />VERIFY THAT INSTALLATION AND RESISTANT COMPLY WITH <br />DUCTWORK CONTAINING HAZARDOUS <br />CONTINUOUS <br />PERIODIC <br />APPROVED CONSTRUCTION DOCUMENTS, PERFORMED BY CODE <br />MATERIALS <br />INSPECTION FIRM. <br />INSTALLATION AND ANCHORAGE OF VIBRATION <br />VERIFY THAT INSTALLATION COMPLIES WITH APPROVED <br />ISOLATION SYSTEMS HAVING A CLEARANCE OF <br />CONTINUOUS <br />PERIODIC <br />CONSTRUCTION DOCUMENTS AND MANUFACTURERS <br />BETWEEN THE EQUIPMENT SUPPORT FRAME <br />RECOMMENDATIONS. PERFORMED BY CODE INSPECTION FIRM. <br />AND RESTRAINT. <br />CONFIRM THAT MANUFACTURERS CERTIFICATION OF COMPLIANCE <br />CONFORMS TO THE REQUIREMENTS OF SECTION 13.2 OF ASCE 7-10. <br />DESIGNATED SEISMIC SYSTEMS <br />CONTINUOUS � <br />PERIODIC <br />VERIFY THAT THE LABEL, ANCHORAGE OR MOUNTING CONFORMS TO <br />THE MANUFACTURER'S CERTIFICATION OF COMPLIANCE. <br />PERFORMED BY CODE INSPECTION FIRM. <br />DRAY <br />ACCEPTABILITY <br />KKB <br />THIS DESIGN AND/OR <br />CHEC <br />SPECIFICATION IS APPROVED <br />BLS <br />ENGI <br />APPROVED BY DEPT. DATE <br />JTP <br />1 1 L SUBTITLE <br />06/30/22 <br />06/30/22 <br />TITLE <br />06/30/22 <br />CITY OF EVERETT <br />REVIEWED FOR PERMIT <br />www.brph.com <br />o 2022 <br />Architects r , <br />Inc® <br />19020 33rd Ave W, Suite #500 <br />State of Washington <br />Certificate of Authorization <br />L <br />Lyn <br />Lynnwood, Washington, 96036 <br />Architecture No. 603235512 <br />3500 <br />Engineering No. 3137 <br />CURRENT REVISION 5YMF30L <br />iSATE <br />16123 <br />06/30/22 <br />SWEET <br />� <br />C <br />S2o-a <br />-200 <br />JOB NO. <br />WO 15/2899-200 <br />COMP NO. <br />DWG NO. 40-023,S2®-214-a <br />