Laserfiche WebLink
PROJECT <br />NOTES <br />(FROM JANUARY 2020 CITY OF EVERETT <br />STANDARD ESC NOTES <br />GENERAL STRUCTURAL <br />DESIGN AND CONSTRUCTION STANDARDS) <br />1. <br />THE EXISTING STORMWATER SYSTEM AT THE PROJECT SITE COLLECTS, DETAINS, AND <br />15. <br />THE CONTRACTOR FOR THIS PROJECT SHALL MAINTAIN A CLEAN, LEGIBLE SET OF <br />1. APPROVAL OF THIS EROSION/SEDIMENTATION CONTROL (ESC) PLAN DOES NOT CONSTITUTE <br />1. <br />CONCRETE SURFACE SHALL HAVE A SLOPE OF 0.5% MINIMUM TO PREVENT <br />TREATS RUNOFF FROM THE BOEING EVERETT SITE. STORMWATER DISCHARGES ARE <br />THESE PLANS AND NOTE ALL DEVIATIONS THEREON. UPON COMPLETION OF <br />AN APPROVAL OF PERMANENT ROAD OR DRAINAGE DESIGN (E.G. SIZE AND LOCATION OF <br />PONDING OF WATER. <br />RELEASED INTO POWDER MILL GULCH CREEK (PMC). STORMWATER DISCHARGES ARE <br />CONSTRUCTION, THESE DRAWINGS SHALL BE DELIVERED TO THE ENGINEER FOR THE <br />ROADS, <br />PIPES, RESTRICTORS, CHANNELS, RETENTION FACILITIES, UTILITIES). <br />COVERED UNDER THE INDUSTRIAL STORMWATER GENERAL PERMIT ISSUED BY <br />PREPARATION OF RECORD DRAWINGS. <br />2. <br />CONCRETE SHALL HAVE A MINIMUM 26 DAY COMPRESSIVE STRENGTH OF <br />ECOLOGY, WHICH INCLUDES NUMERIC EFFLUENT LIMITS FOR ZINC AND COPPER. <br />2. THE <br />IMPLEMENTATION OF THESE ESC PLANS AND THE CONSTRUCTION, MAINTENANCE, <br />4,000 PSI AS MEASURED IN ACCORDANCE WITH ASTM C39. <br />THIS PROJECT INCLUDES IMPLEMENTATION OF AN ENHANCED MEDIA FILTER AND <br />16. <br />THE CONTRACTOR SHALL PROVIDE ALL NECESSARY EQUIPMENT TO PREVENT UTILITY <br />REPLACEMENT, <br />AND UPGRADING OF THESE ESC FACILITIES IS THE RESPONSIBILITY OF THE <br />ASSOCIATED IMPROVEMENTS TO REDUCE COPPER AND ZINC CONCENTRATIONS IN <br />INTERRUPTION. NOTIFY THE BOEING COMPANY TWO WEEKS IN ADVANCE OF EACH <br />APPLICANT/CONTRACTOR UNTIL ALL CONSTRUCTION IS COMPLETED AND APPROVED AND <br />3. <br />MIX DESIGN <br />STORMWATER DISCHARGES TO BELOW THE NUMERIC EFFLUENT LIMITS. <br />UTILITY CONNECTION. IF SHUTDOWN IS REQUIRED, SHUTDOWN SHALL ONLY BE <br />VEGETATION/LANDSCAPING IS ESTABLISHED. <br />3.1. FIELD TEST RECORDS: SUBMIT IN ACCORDANCE WITH ACI 316 <br />PERFORMED BY THE OWNER/PURVEYOR OF THE UTILITY, <br />CHAPTER 5.33.2, <br />2. <br />ALL WORK SHALL CONFORM TO THE 2020 EDITION OF THE WSDOT STANDARD <br />3. THE BOUNDARIES OF THE CLEARING LIMITS SHOWN ON THIS PLAN SHALL BE CLEARLY <br />WATER/CEMENT RATIO: 0.5 MAX <br />SPECIFICATIONS, THE CURRENT EWSDOT STANDARD PLANS, AND THE JANUARY 2020 <br />17. <br />a <br />PRIOR TO COMMENCING WORK, IT SHALL BE THE CONTRACTORS RESPONSIBILITY TO <br />FLAGGED <br />IN THE FIELD PRIOR TO CONSTRUCTION. DURING THE CONSTRUCTION PERIOD, NO <br />3.3. AIR CONTENT: 4% +/- 1 % IN ACCORDANCE W/ ASTM C231 <br />EDITION OF THE CITY OF ENT DESIGN AND CONSTRUCTION STANDARDS �e <br />MAKE ALL NECESSARY SITE INSPECTIONS AND DETERMINATIONS OF ITEMS AND <br />DISTURBANCE BEYOND THE FLAGGED CLEARING LIMITS SHALL DE PERMITTED. THE <br />FLAGGING SHALL BE MAINTAINED BY THE APPLICANT/CONTRACTOR FOR THE DURATION OF <br />SPECIFICATIONS FOR DEVELOPMENT AND THE LATEST VERSION OF THE WASHINGTON <br />QUANTITIES OF WORK TO ENSURE THAT ALL ITEMS OF WORK NECESSARY TO <br />4. <br />CEMENTITIOUS MATERIALS <br />STATE DEPARTMENT OF ECOLOGY DAM SAFETY GUIDELINES, <br />PERFORM A COMPLETE AND ACCEPTABLE JOB HAVE BEEN TAKEN INTO <br />CONSTRUCTION <br />. <br />4.1. MINIMUM CONTENT: 570 LBS/CU YD <br />CONSIDERATION. <br />4. 'THE ESC FACILITIES SHOWN ON THIS PLAN MUST BE CONSTRUCTED IN CONJUNCTION WITH <br />4.2. PORTLAND CEMENT: ASTM C150, TYPE II LOW ALKALI <br />3. <br />THE GENERAL CONTRACTOR SHALL VERIFY ALL EXISTING CONDITIONS BEFORE <br />ALL CLEARING AND GRADING ACTIVITIES AND IN SUCH A MANNER AS TO ENSURE THAT <br />4.3. FLYASH: ASTM C616, CLASS F, NOT TO EXCEED 20% OF TOTAL <br />BEGINNING WORK AND SHALL NOTIFY THE BOEING PROJECT MANAGER OF ALL <br />16. <br />EXCAVATIONS ARE TO HAVE SLOPED SIDES TO COMPLY WITH LOCAL CODES AND <br />SEDIMENT AND SEDIMENT LADEN WATER DO NOT ENTER THE DRAINAGE SYSTEM, <br />CEMENTITIOUS MATERIALS. <br />DISCREPANCIES BETWEEN THE DRAWINGS AND ACTUAL FIELD CONDITIONS. <br />ORDINANCES HAVING JURISDICTION AND THE WASHINGTON STATE DIVISION OF <br />ROADWAYS, <br />OR VIOLATE APPLICABLE WATER QUALITY STANDARDS. <br />OCCUPATIONAL SAFETY AND HEALTH. PROVIDE SHORING AND BRACING WHERE <br />5. <br />AGGREGATE <br />4. <br />ALL MATERIALS SHALL BE INSTALLED IN STRICT ACCORDANCE WITH THE <br />SLOPING IS NOT POSSIBLE BECAUSE OF SPACE RESTRICTIONS, STABILITY OF <br />5. THE ESC FACILITIES SHOWN ON THIS PLAN ARE THE MINIMUM REQUIREMENTS FOR <br />5.1. COARSE: CONFORM TO ASTM C33, 1 INCH MAX AGGREGATE <br />MANUFACTURER'S WRITTEN RECOMMENDATIONS. <br />MATERIAL EXCAVATED, OR TRENCH DEPTH IS GREATER THAN 4 FEET. ENGAGE AND <br />ANTICIPATED SITE CONDITIONS. DURING THE CONSTRUCTION PERIOD, THESE ESC FACILITIES <br />5.2. FINE: CONFORM TO TABLE 1 OF ASTM C33 <br />PAY FOR A WASHINGTON STATE LICENSED ENGINEER EXPERIENCED IN THE DESIGN <br />SHALL BE UPGRADED AS NEEDED FOR UNEXPECTED STORM EVENTS AND TO ENSURE <br />5. <br />CONTRACTOR SHALL PREPARE A TEMPORARY STORMWATER MANAGEMENT PLAN TO <br />OF SHORING WITH SHORING MEETING OR EXCEEDING ALL WISHA CHAPTER 96-155 <br />THAT SEDIMENT AND SEDIMENT -LADEN WATER DO NOT LEAVE THE SITE. <br />DETAIN, REROUTE, AND TREAT RUNOFF AS NECESSARY TO SUPPORT CONSTRUCTION <br />WAG, PART N REQUIREMENTS. SUBMIT DESIGN DATA TO OWNER'S ENGINEER FOR <br />COMBINED AGGREGATE GRADATION (% PASSING SIEVE) <br />ACTIVITIES, MAINTAIN ESTABLISHED FLOW CONTROL CRITERIA FOR THE PMC AND <br />REVIEW FOR CONFORMANCE WITH DESIGN INTENT. <br />6. THE ESC FACILITIES SHALL BE INSPECTED ROUTINELY AND MAINTAINED BY THE <br />ADJACENT WETLAND, AND MEET REQUIREMENTS OF THE CONSTRUCTION STORMWATER <br />APPLICANT/CONTRACTOR TO ENSURE THEIR CONTINUED FUNCTIONING, ESPECIALLY AFTER <br />1 1/2" 1" 3/4" 3/6" NO. 4 NO. 6 NO. 16 NO. <br />190-100 1 <br />30 NO. 50 NO. 100 NO. 200 <br />PERMIT. SEE SHEET M310 FOR DISCHARGE FLOWRATE LIMITS. <br />19. <br />COORDINATE ENTRY, SECURITY, ENVIRONMENTAL PROCEDURES, FOD TRAINING, AND <br />STORM EVENTS. <br />100 55-100 45-75 35-60 27-45 20-35 12-25 3-15 0®5 0®2 <br />OTHER REQUIREMENTS WITH OWNER PRIOR TO BEGINNING WORK. <br />- <br />6. <br />CONTRACTOR SHALL COORDINATE WITH BOEING FOR TESTING AND DISPOSAL <br />7. THE <br />ESC FACILITIES ON INACTIVE SITES SHALL BE INSPECTED AND MAINTAINED A MINIMUM <br />REQUIREMENTS FOR MATERIAL EXCAVATED FROM THE PEAT FILTER. <br />20. <br />SECURE SITE AT ALL TIMES. CONFIRM ACCESS GATE IS CLOSED AND LOCKED WHEN <br />OF ONCE A MONTH OR WITHIN THE 46 HOURS FOLLOWING A MAJOR STORM EVENT. <br />6. <br />ADMIXTURES <br />NOT IN USE. PROVIDE SECURE TEMPORARY SITE FENCING DURING TIME PERIOD <br />B. AT <br />NO TIME SHALL MORE THAN ONE FOOT OF SEDIMENT DE ALLOWED TO ACCUMULATE <br />6.1. AIR ENTRAINING: ASTM C260 <br />7. <br />IF EXISTING SOIL CONTAMINATION IS ENCOUNTERED, THE CONTRACTOR SHALL <br />WHEN EXISTING FENCE IS REMOVED AND WHEN NEW PERMANENT FENCING AND <br />WITHIN A TRAPPED CATCH BASIN. ALL CATCH BASINS AND CONVEYANCE LINES SHALL BE <br />6.2. WATER REDUCING: ASTM C494, TYPE A <br />IMMEDIATELY NOTIFY THE BOEING CONSTRUCTION MANAGER. ALL EXCAVATED <br />GATES ARE INSTALLED. <br />CLEANED PRIOR TO PAVING. THE CLEANING OPERATION SHALL NOT FLUSH SEDIMENT <br />MATERIAL SHALL BE EXAMINED BY FACILITIES ENVIRONMENTAL REPRESENTATIVES <br />LADEN WATER INTO THE DOWNSTREAM SYSTEM. <br />7. <br />CONCRETE CONSTRUCTION SHALL CONFORM TO ACI 301-10, 316®11, <br />PRIOR TO DISPOSAL OFF -SITE. <br />21. <br />POST SIGN WITH NAME AND PHONE NUMBER OF SUPERVISOR. <br />AND ACI 347. <br />9. 'STABILIZED CONSTRUCTION ENTRANCES SHALL BE INSTALLED AT THE BEGINNING OF <br />8. <br />CONCRETE SHALL BE PLACED AND CURED BETWEEN 50 AND 90 DEGREES F. <br />6. <br />UNLESS NOTED OTHERWISE, CONTRACTOR SHALL PROTECT IN PLACE ALL <br />22. <br />CONTRACTOR TO COORDINATE WITH BOEING FOR PHASING OF PROJECT TO MEET <br />CONSTRUCTION AND MAINTAINED FOR THE DURATION OF THE PROJECT. ADDITIONAL <br />MONITORING WELLS WITHIN THE WORK LIMITS. MONITORING WELL MONUMENTS WITHIN <br />BOEING'S OPERATION REQUIREMENTS. A WORK SEQUENCING PLAN SHALL BE <br />MEASURES MAY BE REQUIRED TO ENSURE THAT ALL PAVED AREAS ARE KEPT CLEAN FOR <br />9. <br />PROVIDE SF-2.0 FINISH AT FORMED SURFACES IN ACCORDANCE WITH ACI <br />THE REPAVING LIMITS SHALL BE REMOVED PRIOR TO PAVING AND REINSTALLED. ALL <br />PREPARED BY THE CONTRACTOR AND APPROVED BY BOEING. <br />THE <br />DURATION OF THE PROJECT. <br />301 <br />IMPACTED MONITORING WELL MONUMENTS WILL BE ADJUSTED AS NECESSARY TO <br />MATCH FINISHED GRADE. ANY ADJUSTMENT OF MONITORING WELLS SHALL BE DONE <br />23. <br />ALL INDICATED SCALES ON THE DRAWINGS ARE APPROXIMATE AND DIMENSIONS <br />10. THE CONTRACTOR SHALL PROVIDE PERIODIC STREET CLEANING TO REMOVE DEBRIS AND <br />10. <br />PROVIDE TROWEL FINISH AT HORIZONTAL SURFACES IN ACCORDANCE WITH ACI <br />BY A LICENSED WELL DRILLER IN ACCORDANCE WITH WAC173-160 AND <br />SHOWN TAKE PRECEDENCE OVER SCALED DISTANCES. <br />SEDIMENT TRACKED OFF THE SITE. <br />301. <br />COORDINATED WITH BOEING EHS. <br />24. <br />CONTRACTOR SHALL MAINTAIN THE SITE IN A NEAT AND ORDERLY CONDITION. <br />11. APPROPRIATE MEASURES SHALL BE TAKEN TO STOP SEDIMENT FROM ENTERING SURFACE <br />WATER BODIES IF THE PROPOSED BMPS FAIL. <br />11. <br />UNLESS OTHERWISE NOTED, ALL EXPOSED EDGES AND CORNERS SHALL BE <br />9. <br />THE USE OF COPPER OR GALVANIZED/ZINC®BASED MATERIALS FOR SYSTEMS IN <br />CHAMFERED 3/4-INCH. <br />CONTACT WITH STORMWATER RUNOFF IS PROHIBITED. <br />25 <br />CONTRACTOR SHALL RESTORE ALL AREAS AFFECTED BY THE CONTRACTOR'S WORK <br />12. FARE AND/OR DISTURBED SOILS SHALL REMAIN UNCOVERED AND/OR UNSTABILIZED FOR <br />AND OPERATIONS. UPON COMPLETION OF A WORK AREA, THE CONTRACTOR SHALL <br />NO MORE THAN 2 DAYS FROM OCTOBER 1 THROUGH APRIL 30, AND FOR NO MORE THAN <br />12. <br />REINFORCING BARS SHALL BE ASTM A615�GRADE 60. <br />10. <br />SPOT ELEVATIONS, UNDERGROUND UTILITIES, AND SURFACE FEATURES SHOWN ON <br />THOROUGHLY CLEAN THE AREA PRIOR TO MOVING TO THE NEXT AREA. <br />7 DAYS FROM MAY 1 THROUGH SEPTEMBER 30. <br />THESE PLANS ARE AS SHOWN ON TOPOGRAPHIC MAPS PREPARED BY DUANE <br />13. <br />WELDED WIRE FABRIC SHALL CONFORM TO ASTM A185. <br />HARTMAN & ASSOCIATES, INC. FROM FIELD WORK GATHERED IN 2020. THE <br />CONTRACTOR IS RESPONSIBLE FOR FIELD VERIFICATION OF ALL EXISTING FEATURES, <br />26. <br />THE CONTRACTOR SHALL TAKE ALL PRECAUTIONARY MEASURES NECESSARY TO <br />14. <br />ARRANGEMENT AND DETAILING OF REINFORCING STEEL, INCLUDING BAR <br />ELEVATIONS, AND PROPERTY LINES SHOWN. IF DISCREPANCIES OCCUR, THE <br />PROTECT EXISTING FEATURES WHICH ARE TO REMAIN IN PLACE. ALL NEW AND <br />SUPPORTS AND SPACERS, SHALL BE IN ACCORDANCE WITH THE LATEST ACI <br />CONTRACTOR SHALL NOTIFY THE ENGINEER IMMEDIATELY. <br />EXISTING IMPROVEMENTS DAMAGED BY THE CONTRACTOR'S OPERATIONS SHALL BE <br />STrRM <br />ru RAI NAG E <br />315 DETAILING MANUAL. <br />EXPEDITIOUSLY REPAIRED OR RECONSTRUCTED AT THE CONTRACTOR'S EXPENSE <br />11. <br />THE HORIZONTAL DATUM USED FOR THIS SURVEY IS WASHINGTON STATE <br />WITHOUT ADDITIONAL COMPENSATION. <br />P LAN <br />NOTES (FROM JANUARY 2020 CITY OF EVERETT <br />15. <br />REINFORCING SHALL LAP IN ACCORDANCE WITH ACI 316®11. <br />COORDINATE SYSTEM, NORTH ZONE NAD 63/91. <br />27, <br />WHERE CONFLICTS OCCUR BETWEEN EXISTING FEATURES AND THE PLACEMENT OF <br />DESIGN AND CONSTRUCTION STANDARDS) <br />16. <br />DIMENSIONS TO REINFORCING ARE TO BAR CENTERLINES, UNLESS NOTED <br />NEW FACILITIES, THEY SHALL BE BROUGHT TO THE ATTENTION OF THE ENGINEER BY <br />1. NO PART OF THE DRAINAGE SYSTEM SHALL BE COVERED, CONCEALED, OR PUT INTO USE <br />OTHERWISE BAR COVER IS CLEAR DISTANCE BETWEEN THE BAR AND THE <br />12. <br />THE VERTICAL DATUM USED FOR THESE PLANS IS THE NATIONAL GEODETIC <br />THE CONTRACTOR AND WILL BE RESOLVED BY THE ENGINEER. <br />UNTIL IT HAS BEEN INSPECTED, TESTED, AND ACCEPTED BY THE CITY OF EVERETT. <br />CON FACE.UNLESS SHOWN OTHERWISE, BAR COVER SHALL NOT BE <br />S1 R1 <br />VERTICAL DATUM 1929 (NGVD 29). <br />LESS R HAN /2 <br />26. <br />THE APPLICATION RATE OF FERTILIZERS USED TO ESTABLISH VEGETATION MUST <br />2. ALL WORK AND MATERIAL SHALL CONFORM TO THE CITY OF EVERETT DESIGN AND <br />13. <br />THE CONTRACTOR SHALL BE RESPONSIBLE FOR ALL TRAFFIC CONTROL AND SHALL <br />FOLLOW MANUFACTURER'S RECOMMENDATIONS TO MINIMIZE NUTRIENT RELEASES TO <br />CONSTRUCTION STANDARDS AND SPECIFICATIONS AND THE WSDOT/APWA STANDARD <br />COORDINATE HIS ACTIVITIES WITH THE OWNER AND ENGINEER A MINIMUM OF TWO <br />SURFACE WATERS. EXERCISE CAUTION WHEN USING TIME -RELEASE FERTILIZERS <br />SPECIFICATIONS FOR ROAD, BRIDGE, AND MUNICIPAL CONSTRUCTION (CURRENT EDITION). <br />(2) WEEKS IN ADVANCE OF THE BEGINNING OF WORK. THE CONTRACTOR IS <br />WITHIN ANY WATERWAY RIPARIAN ZONE. <br />RESPONSIBLE FOR PROVIDING ALL TRAFFIC CONTROL SIGNS. SAFE VEHICULAR AND <br />3. APPROXIMATE LOCATIONS OF EXISTING UTILITIES HAVE BEEN OBTAINED FROM AVAILABLE <br />PEDESTRIAN ACCESS SHALL BE PROVIDED AT ALL TIMES DURING CONSTRUCTION. <br />RECORDS AND ARE SHOWN FOR CONVENIENCE. THE CONTRACTOR SHALL BE RESPONSIBLE <br />SHUTDOWN OF OWNER OPERATION OR ACCESS WILL NOT BE PERMITTED. A MINIMUM <br />29 <br />EXISTING SAMPLING EQUIPMENT THE STILLING BASIN SHALL BE PROTECTED IN <br />FOR VERIFICATION OF LOCATIONS AND TO AVOID DAMAGE TO ANY ADDITIONAL UTILITIES <br />OF ONE LANE SHALL REMAIN OPEN AT ALL TIMES DURING CONSTRUCTION. <br />PLACE AND REMAIN FULLY OPERATIONAL THROUGHOUT CONSTRUCTION. <br />SHOWN. IF CONFLICTS WITH EXISTING UTILITIES ARISE DURING CONSTRUCTION, THE <br />CONTRACTOR SHALL NOTIFY THE PUBLIC WORKS INSPECTOR AND ANY CHANGES REQUIRED <br />14. <br />THE LOCATION OF ALL UTILITIES SHOWN ON THIS PLAN IS APPROXIMATE. THE <br />SHALL BE APPROVED BY THE CITY ENGINEER PRIOR TO COMMENCEMENT OF RELATED <br />CONTRACTOR SHALL VERIFY THE EXISTING UTILITIES PRIOR TO EXCAVATION. TO <br />CONSTRUCTION ON THE PROJECT. <br />LOCATE UTILITIES, CALL THE UNDERGROUND LOCATE LINE AT 1-600-424-5555. <br />4. ALL STORM SYSTEMS WITHIN THE PUBLIC RIGHT-OF-WAY OR IN EASEMENTS MUST BE <br />THE CONTRACTOR SHALL BE RESPONSIBLE FOR PROTECTING ALL EXISTING UTILITIES, <br />STAKED BY SURVEY FOR LINE AND GRADE PRIOR TO STARTING CONSTRUCTION. <br />WHETHER OR NOT SHOWN ON THE DRAWINGS. <br />CD <br />Cq <br />v <br />1 <br />ENGINEERS, <br />r� <br />c14 <br />cy <br />CIVIL ® STRUCTURAL ® SURVEYING <br />4815 CENTER STREET TACOMA, WA. 98409 <br />1 <br />PHONE: (253) 474.9449 FAX: (253) 474-9449 <br />http://www.sitts-hill-engineers.com/ Ke:nnedy/Jenks Consultants <br />MARCH 5,2021 <br />Project No.: 16,615 Project Mgr.: DCD 32001 32nd Avenue South, Suite 100 <br />Federal Way, WA 96001 <br />i <br />Pr®j. Engineer: DCD Praj. Drafter: KLK Ph. 253®335-6400 <br />Fax 253-952-3435 <br />LU <br />GYM <br />REVISION <br />BY <br />APPROVED <br />DATE <br />SYM <br />REVISION <br />6Y <br />APPROVED <br />DATE <br />ACCEPTABILITY <br />DRAWN <br />LMW KLK <br />DATE <br />03.05.21 <br />SUBTITLE <br />NOTES�50654�6 <br />CURRENT REVISION <br />SYMBOL <br />®� <br />DATE <br />®�.0�.�1 <br />CHECKED <br />L <br />THIS DESIGN AND/OR <br />SHEET <br />SEQUENCE NO. <br />0 <br />�� <br />BOEING <br />EVERETT SITE STORMWATER UPGRADE 25065466 <br />KJ <br />BEE <br />03.05.21 <br />SPECIFICATION IS APPROVED <br />BEF DCD <br />03.05.21 <br />���� <br />�� <br />C2D <br />APPROVED BY <br />DEPT. <br />DATE <br />rRINE <br />BEF <br />03.05.21 <br />TITLE <br />HOEING EVERETT SITE STORMWATER UPGRADE <br />Y< <br />CHECKED <br />ECK <br />03.05.21 <br />Af�PR�VED <br />48 39 <br />��064�6 <br />03.05.21 <br />CIVIL <br />EVERETT, WA <br />APPROVED <br />®wc N®. <br />40®YD-M- <br />l <br />