Laserfiche WebLink
MATCHLINE - SEE DWG 40-YD08-C10 <br />I <br />I <br />0 <br />Lu <br />w <br />cn <br />I <br />I� <br />SBOEING EVERETT _ AD <br />MATCHLINE - SE DWG 40-YD17-CIO <br />PARTIAL PLAN <br />SCALE: 1 „ - 40' <br />IFC SUBMITTAL <br />MARCH 5, 2021 <br />LEGEND <br />B® <br />CONCRETE BOLLARD <br />-a- <br />POWER POLE <br />POST INDICATOR VALVE <br />CATCH BASIN <br />Da <br />VALVE <br />O <br />STORM DRAIN MANHOLE <br />FIRE HYDRANT <br />0 <br />SANITARY SEWER MANHOLE <br />GAS VALVE <br />SIGN <br />CO ® <br />CLEANOUT <br />WATER VAULT <br />LIGHT POLE <br />TELEPHONE/POWER MANHOLE <br />TRANSFORMER /CV m <br />IRRIGATION CONTROL VALVE <br />POWER VAULT <br />WHEEL CHAIR RAMP/PARKING <br />TELEPHONE VAULT <br />MONITOR WELL <br />POWER CABINET <br />® <br />WATER MANHOLE <br />WATER METER <br />IM <br />TRAFFIC CABINET <br />MAILBOX <br />TD— <br />TIE DOWN <br />DHA SURVEY CONTROL <br />® <br />CAPPED VERTICAL PVC PIPE <br />JUNCTION BOX <br />POWER POLE ANCHOR <br />GENERAL NOTES <br />CONTOUR INTERVAL: ONE (1) FOOT CONTOURS. <br />HORIZONTAL DATUM: WASHINGTON STATE COORDINATE <br />SYSTEM, NORTH ZONE, NAD 83(91) <br />VERTICAL DATUM: NATIONAL GEODETIC VERTICAL <br />o DATUM 1929 (NGVD 29) <br />E <br />0 <br />�- <br />CD <br />CONSTRUCTON NOTES <br />Lli <br />REFERENCE DRAWINGS <br />40-YD-CS0 <br />40-YD-220 <br />40-YD-221 <br />40-YD-290 <br />40-YD-El10 <br />APPROVED <br />DATE <br />SYM <br />REVISION <br />BY <br />APPROVED <br />DATE <br />ACCEPTABILITY <br />THIS DESIGN AND/OR <br />DRAWN <br />J. PEARSON <br />DATE <br />02.21.2021 <br />SUBTITLE <br />TOPOGRAPHY AND SURVEY <br />A. <br />�® W `�� <br />REF <br />03.05.21 <br />CHECKED <br />®�w <br />r <br />rsT <br />SPECIFICATION IS APPROVED <br />APPROVED BY <br />DEPT, <br />DATE <br />ENGINEER <br />TITLE <br />BOEING EVERETT SITE STORMWATER UPGRADE <br />SITE 40—YD <br />CHECKED <br />APPROVED <br />Lo <br />CIVIL MASTER <br />APPRovED <br />(F'A LN JF'AUL) bLL: 4U—TUUU_05-U I U.UWb <br />