My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3003 W CASINO RD 2019 BLDG 40-58 Plans 2023-01-25
>
Address Records
>
W CASINO RD
>
3003
>
BLDG 40-58
>
Plans
>
3003 W CASINO RD 2019 BLDG 40-58 Plans 2023-01-25
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/25/2023 4:37:00 PM
Creation date
1/25/2023 1:21:50 PM
Metadata
Fields
Template:
Address Document
Street Name
W CASINO RD
Street Number
3003
Tenant Name
BLDG 40-58
Permit
B1911-015
Year
2019
Notes
FOUNDATION PACKAGE FOR SPAR PAINT BOOTH
Address Document Type
Plans
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
32
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
3.10 <br />---- <br />T -- <br />--G <br />LEGEND <br />1, SEE LEGEND SHEET EO & E1 FOR ABBREVIATIONS & NOTES. <br />GENERAL NOTES <br />3.15 3.20 3.2(33.30 .3 T34 3.45 ,50 3®55� 3,00 3.05 3,70 3,75 3®30 1. REFER T®HEETs E509-1, E509-1 & E509=3 FOR GROUNDING DETAILS, COORDINATE <br />WITH DIVISION 27 DRAWINGS AND SPECIFICATIONS FOR GROUNDING <br />6 5 7 REQUIREMENTS. <br />2. GROUND ROD LOCATIONS SHOWN ARE APPROXIMATE. CONTRACTOR TO <br />------------G---- — -- ------ --- <br />i 1 ESTABLISH FINAL LOCATIONS. COUNTERPOISE SHALL BE CONNECTED TO STEEL <br />--®--�®— — — — — — --- ------®----�---— — — — — — — — �——��------ I,: _ ——------� COLUMNS AROUND THE PERIMETER OF THE STRUCTURE AT INTERVALS <br />---------- ____- _ _---.._.__._------_-_.__-- - _ ___ __._ _..._ -- <br />_ _---------.___._ ..._._. _ _ ..__ ..__ _. _ _...........- __ _ I AVERAGING NOT MORE THAN 60 FEET. <br />1 I _ � I I I ; I . 1 _.... _ _ _ . I �509-� { �� , I � ; 13 _._ G � _ _ _ _ . _ _ , A <br />8 / I 3. GROUNDING SHOWN DIAGRAMMATICAL. CONTRACTOR TO ESTABLISH FINAL <br />�- — — — ROUTING TO AVOID DOORS AND OTHER OBSTRUCTIONS. <br />_G E509-1 / <br />! ( 4. ALL GROUNDING SHALL BE IN COMPLIANCE WITH 2O14 NEC, STATE OF <br />CAL <br />I 5 21 20 _ m=_—_ I� _ _-_ _. _ _ __.__.; _.. ____ __ _ _-_____ _. { : ....'. .. _..1, (TY ) I WASHINGTON CODES AND REGULATIONS, AND BOEING STANDARDS AND SPECS. <br />G 7 17 1 7 17 �__ ._ . ' 17 _ �; t GROUND �F I #410 AWG BARE STRANDED COPPER. MIN. 2'-6" BELOW GRADE. <br />-_ -- _ BUS GROUND RUB- I 8 SHEET E509 2 DETAIL 7 <br />OUND <br />GROUND ROD MIN24"FR <br />R PAINT BOOTH 9i 1 <br />SG _ _ mm_ FROM FOUNDATION WALL (TYP). SEE <br />I 6 SH - <br />��� I_ I <br />7 EXOTHERMIC WELD OR BURNDY NYGROUND (TYP). <br />(:A:.259 EXTEND #4/0 AWG BARE COPPER 2-6 BELOW GRADE TO BUILDING 4(} 057 <br />! LJ COUNTERPOISE. USE EXOTHERMIC BOND FOR CONNECTION. <br />Z <br />EXTEND #4/0 AWG BARE COPPER AND CONNECT TO UNDERGROUND WATER METAL <br />/ j I PIPING AT WATER MAIN SERVICE ENTRANCE. <br />i 5 I 1 E9-03 E509 2 IG <br />i <br />�� . <br />19 (TYPICAL) I 10 E FOUNDATION <br />! I 5 21 20 ---. _ _�°__— - _3�. --_-- . __ _.._ __. _ _.... REBAR. CONNECTINNO LESS THAN TWO LOCATIONS A MINIMUM OF 500 FEET IO <br />` APART. <br />�GI 7 17 1 it 1 7 17 <br />11 CONNECTION TO TUNNEL GROUNDING CONDUCTOR. REFER TO TNE9-03. <br />AR PAINT BOOTH # 2 �- <br />1E9-9 E509-3 G — ! A,5 12 STATIC GROUND CONNECTION POINT. STUB UP GROUND CONDUCTOR 6-12" ABOVE <br />I �o �- �® e� �e �® m o�e e 3 GRADE. STUB UP SHOULD BE THROUGH A 4" DIAMETER 12" DEEP PVC FLUSH WITH <br />(TYPICAL) — -- - -- -- ± FLOOR. <br />I <br />f I 13 CONNECT TO EQUIPMENT FOUNDATION REBAR <br />I 21 2Q�, �. ... GROUND BUS GROUND BUS- <br />5 14 PROVIDE A 25 FOOT PIG TAIL ABOVE GRADE AT EQUIPMENT CONTROL PANEL <br />LOCATION. <br />5 I I 4 4 I I 15 PROVIDE A 94/0, 6° LONG PIG TAIL ABOVE GRADE FOR FUTURE GROUNDING <br />CONNECTION. PROVIDE RIGID STEEL CONDUIT SLEEVE TO PROTECT CONDUCTOR <br />GROUND BUS I �.�� WHERE IT EXITS THE CONCRETE SLAB. <br />...... <br />I _ I 16 PROVIDE A #4/0,10 LONG PIGTAIL ABOVE GRADE FOR FUTURE GROUNDING <br />CONNECTION. PROVIDE RIGID STEEL CONDUIT SLEEVE TO PROTECT CONDUCTOR <br />,I <br />SEE 1E9-02 I I -- _ -- _ WHERE IT EXITS THE CONCRETE SLAB_. <br />17 STATIC GROUND FOR PLATE BELOW TOOL CART. <br />r ; <br />I I I l I (TYPI AL) <br />x Iri n. I. «_ . �� I i 18. INSTALL ARMORED EDGE GROUNDING PER DETAIL 4 ON SHEET E509-3. <br />I f' <br />I 19 INSTALL STATIC GROUND BAR PER DETAIL 8 ON SHEET E509-2. <br />E ( 20 PROVIDE A #4/0, 5' LONG PIG TALL ABOVE GRADE FOR FUTURE GROUNDING <br />10 r = - g CONNECTION. PROVIDE 1" PVC CONDUIT SLEEVE TO PROTECT CONDUCTOR <br />— — - — — WHERE IT EXITS THE CONCRETE SLAB. <br />3 0®, ( I I ICI I1' 8 I 21 EXOTHERMIC WELD OR BURNDY HYGROUND BY OTHERS. <br />S ���-- sCO"NSMUCTIO'N NOTES <br />� <br />I 12 12 I 1. ENSURE THAT EXPOSED METALLIC FEATURES OF TOOL SUPPORTS ARE WELDED <br />OR DRILLED, TAPPED AND FASTENED TO FOUNDATION STEEL TO PROVIDE A <br />I� = CONTINUOUS BOND WITH THE FOUNDATION GROUNDING SYSTEM. PROVIDE <br />- I _ ADDITIONAL BONDING JUMPERS AS NECESSARY FOR EMBEDS. SUCH METALLIC <br />FEATURES SHALL BE BONDED SUCH THAT THEY MEET OR EXCEED THE <br />_.. .25 <br />i .,- , g, ; PERFORMANCE REQUIREMENTS FOR ELECTRODE SYSTEM RESISTANCE <br />0 ( _ - _ ___ . .. _-_�....�, ,s�« _. « r« SG MEASUREMENTS OUTLINED IN PROJECT SPECIFICATIONS. <br />I 17 <br />I I ....... I 2 <br />PROVIDE STATIC GROUND BAR AT 36 A.F.F. ALONG ENTIRE NORTH WALL OF PAINT <br />I 7 9I STORAGE ROOM. BOND TO EXISTING GRID USING #4/0 SDBC CONDUCTOR. <br />3 PROVIDE STATIC GROUND BAR AT 36" A.F.F. ALONG ENTIRE NORTH WALL OF PAINT <br />s - IX ROOM. BOND TO BUILDING COLUMN A4 USING #4/0 SDBC CONDUCTOR PER <br />M <br />DETAIL8/E5091. <br />SEE 1E9-02 PROVIDE STATIC GROUND BARS AT 36" A.F.F. ALONG ENTIRE NORTH & SOUTH <br />— — — — — — — — — — —� — — I I 16 I. f ! WALLS OF GUN CLEANING ROOM. BOND TO EXISTING GRID USING #4/0 SDBC <br />7 <br />B.5 CONDUCTOR. <br />0 <br />---_--.__ <br />i SG SG I I - I.. ,v, v <br />REFERENCE "RAWINGS <br />40 05$ M I E9 OJ PARTIAL GROUNDING PLAN <br />40-058-E509-1 GROUNDING DETAILS <br />40-058-E509-2 GROUNDING DETAILS <br />a I 40-058-E509-3 GROUNDING DETAILS <br />° "[ <br />7 13 <br />— — — "1 -2 <br />i <br />5 B 3 B <br />I� <br />10 I I c c <br />14 14 -4 -5 -6 <br />i � I <br />I 5 I ® 7 13 7 13 <br />I <br />SG e I ( ! I 7 8 <br />- <br />SEE 1E9-06 F SEE 1E9-06 SEE 1E9-06 III <br />I .. T <br />-10 -11 -12 <br />CONSTRUCTION <br />C"ONSTRUCTION NOTES (CONT) <br />FOUNDATION <br />5 CONTRACTOR SHALL GROUND BOOTH COLUMNS ALONG SOUTH END OF CELL TO 19 <br />8. GROUND STACKS BY PROVIDING BONDING JUMPERS ACROSS JUNCTIONS WHERE PARTIAL GROUNDINGPLAN_ _._ _. _ _ _ _ __ _--_---_ __ISSUED FOR <br />J <br />NEAREST BUILDING GROUND GRID LOCATION USING #4/0 AWG BARE STRANDED METALLIC DUCT IS ELECTRICALLY DISCONTINUOUS. PROVIDE A 1/0 AWG COPPER I -13 -14 -15 <br />COPPER CONDUCTOR. INSTALL CADWELD ON NORTH FACE OF COLUMN AS PER CONDUCTOR ALONG EXTERIOR OF STACK FROM GROUND CONNECTION TO TOP OF ' Our difference I I - <br />DETAIL 5/E509=3. STACK BY WELDING A GROUND ROD STUD AND C-CRIMPING CONDUCTOR TO STUD. SCALE: 1/16 T-O°° I is engineered. V <br />uwvw.harrisgroup.com I I I <br />6 CADWELD #4/0 SDBC TO EXISTING GROUND GRID AT SOUTH END OF CELL. 9� BOND TO STATIC GROUND BAR USING #4/0 SDBC CONDUCTOR AND ROUTE IN 3/4" PVC <br />CONDUIT TO MEZZANINE LEVEL NEAR COLUMN A.25/4.0. ` REVISION "C" ONLY <br />CONTRACTOR SHALL PROVIDE #4l0 SDBC CONDUCTOR IN 3l4" PVC CONDUIT IN N/S _ <br />TRENCH BELOW TOOLING CART AND ALONG C10 SUPPORT BEAMS AS SHOWN. 10 PROVIDE AWG STRANDED COPPER IN 3/4" PVC TO RELOCATED CHATSWORTH — PROJECT NO: 0012630.06 I— <br />CADWELD TO ANCHOR RODS OF LEVELING PLATES FOR TOOLING CART, REFER TO COMMUNICATION ENCLOSURE. SEE DRAWING 1 E410-14 FOR LOCATION. BOND TO _ ;' _ _. DRAWN: NH PROD MGR: RLT o <br />STRUCTURAL DRAWING S591-01 FOR BEAM LOCATIONS. EXISTING GROUND GRID AT BUILDING COLUMN B4. <br />0 8° 16' 32' 48' <br />ENGINEER: EOF APPROVED: RLT <br />CHECKED: MWD DATE: 10.25.19 SCALE: 1/16" =1'-0" <br />SYM REVISION BY APPROVED DATE SYM REVISION BY APPROVED DATE DRAWN DATE SUBTITLE CURRENT REVISION SYMBOL DATE <br />DIB���, ACCEPTABILITY RER 12/05/14 <br />THIS DESIGN ANDIOR CHECKED PARTIAL GROUNDING PLAN W5983281 10.25.19 <br />SPECIFICATION IS APPROVED RFW 12/05/14 " <br />B 777X CWC NEW BUILDING -RECORD WBS 2548317 JMG DFC 07f05/17 ENGINEER sHEEr <br />o ® TITLE PFP SPAR PAINT BOOTH AND 2 <br />APPROVED BY DEPT. DATE DFC 12/05/14 <br />C PFP SPAR PAINT BOOTH 1 AND 2 - IFC FOUNDATION W5983281 HG RLT 10.25.19 / <br />(.',t;r CHECKED1 03 <br />r <br />�p 51289 �� APPROVED ®0 JOB NO COMP NO. <br />BUILDING c <br />APPROVED ELECTRICAL MASTER EVERETT, WA DWG No. 40-058-1 E9-03 <br />0f251201 ®NA�'' <br />
The URL can be used to link to this page
Your browser does not support the video tag.