Laserfiche WebLink
3.10 <br />---- <br />T -- <br />--G <br />LEGEND <br />1, SEE LEGEND SHEET EO & E1 FOR ABBREVIATIONS & NOTES. <br />GENERAL NOTES <br />3.15 3.20 3.2(33.30 .3 T34 3.45 ,50 3®55� 3,00 3.05 3,70 3,75 3®30 1. REFER T®HEETs E509-1, E509-1 & E509=3 FOR GROUNDING DETAILS, COORDINATE <br />WITH DIVISION 27 DRAWINGS AND SPECIFICATIONS FOR GROUNDING <br />6 5 7 REQUIREMENTS. <br />2. GROUND ROD LOCATIONS SHOWN ARE APPROXIMATE. CONTRACTOR TO <br />------------G---- — -- ------ --- <br />i 1 ESTABLISH FINAL LOCATIONS. COUNTERPOISE SHALL BE CONNECTED TO STEEL <br />--®--�®— — — — — — --- ------®----�---— — — — — — — — �——��------ I,: _ ——------� COLUMNS AROUND THE PERIMETER OF THE STRUCTURE AT INTERVALS <br />---------- ____- _ _---.._.__._------_-_.__-- - _ ___ __._ _..._ -- <br />_ _---------.___._ ..._._. _ _ ..__ ..__ _. _ _...........- __ _ I AVERAGING NOT MORE THAN 60 FEET. <br />1 I _ � I I I ; I . 1 _.... _ _ _ . I �509-� { �� , I � ; 13 _._ G � _ _ _ _ . _ _ , A <br />8 / I 3. GROUNDING SHOWN DIAGRAMMATICAL. CONTRACTOR TO ESTABLISH FINAL <br />�- — — — ROUTING TO AVOID DOORS AND OTHER OBSTRUCTIONS. <br />_G E509-1 / <br />! ( 4. ALL GROUNDING SHALL BE IN COMPLIANCE WITH 2O14 NEC, STATE OF <br />CAL <br />I 5 21 20 _ m=_—_ I� _ _-_ _. _ _ __.__.; _.. ____ __ _ _-_____ _. { : ....'. .. _..1, (TY ) I WASHINGTON CODES AND REGULATIONS, AND BOEING STANDARDS AND SPECS. <br />G 7 17 1 7 17 �__ ._ . ' 17 _ �; t GROUND �F I #410 AWG BARE STRANDED COPPER. MIN. 2'-6" BELOW GRADE. <br />-_ -- _ BUS GROUND RUB- I 8 SHEET E509 2 DETAIL 7 <br />OUND <br />GROUND ROD MIN24"FR <br />R PAINT BOOTH 9i 1 <br />SG _ _ mm_ FROM FOUNDATION WALL (TYP). SEE <br />I 6 SH - <br />��� I_ I <br />7 EXOTHERMIC WELD OR BURNDY NYGROUND (TYP). <br />(:A:.259 EXTEND #4/0 AWG BARE COPPER 2-6 BELOW GRADE TO BUILDING 4(} 057 <br />! LJ COUNTERPOISE. USE EXOTHERMIC BOND FOR CONNECTION. <br />Z <br />EXTEND #4/0 AWG BARE COPPER AND CONNECT TO UNDERGROUND WATER METAL <br />/ j I PIPING AT WATER MAIN SERVICE ENTRANCE. <br />i 5 I 1 E9-03 E509 2 IG <br />i <br />�� . <br />19 (TYPICAL) I 10 E FOUNDATION <br />! I 5 21 20 ---. _ _�°__— - _3�. --_-- . __ _.._ __. _ _.... REBAR. CONNECTINNO LESS THAN TWO LOCATIONS A MINIMUM OF 500 FEET IO <br />` APART. <br />�GI 7 17 1 it 1 7 17 <br />11 CONNECTION TO TUNNEL GROUNDING CONDUCTOR. REFER TO TNE9-03. <br />AR PAINT BOOTH # 2 �- <br />1E9-9 E509-3 G — ! A,5 12 STATIC GROUND CONNECTION POINT. STUB UP GROUND CONDUCTOR 6-12" ABOVE <br />I �o �- �® e� �e �® m o�e e 3 GRADE. STUB UP SHOULD BE THROUGH A 4" DIAMETER 12" DEEP PVC FLUSH WITH <br />(TYPICAL) — -- - -- -- ± FLOOR. <br />I <br />f I 13 CONNECT TO EQUIPMENT FOUNDATION REBAR <br />I 21 2Q�, �. ... GROUND BUS GROUND BUS- <br />5 14 PROVIDE A 25 FOOT PIG TAIL ABOVE GRADE AT EQUIPMENT CONTROL PANEL <br />LOCATION. <br />5 I I 4 4 I I 15 PROVIDE A 94/0, 6° LONG PIG TAIL ABOVE GRADE FOR FUTURE GROUNDING <br />CONNECTION. PROVIDE RIGID STEEL CONDUIT SLEEVE TO PROTECT CONDUCTOR <br />GROUND BUS I �.�� WHERE IT EXITS THE CONCRETE SLAB. <br />...... <br />I _ I 16 PROVIDE A #4/0,10 LONG PIGTAIL ABOVE GRADE FOR FUTURE GROUNDING <br />CONNECTION. PROVIDE RIGID STEEL CONDUIT SLEEVE TO PROTECT CONDUCTOR <br />,I <br />SEE 1E9-02 I I -- _ -- _ WHERE IT EXITS THE CONCRETE SLAB_. <br />17 STATIC GROUND FOR PLATE BELOW TOOL CART. <br />r ; <br />I I I l I (TYPI AL) <br />x Iri n. I. «_ . �� I i 18. INSTALL ARMORED EDGE GROUNDING PER DETAIL 4 ON SHEET E509-3. <br />I f' <br />I 19 INSTALL STATIC GROUND BAR PER DETAIL 8 ON SHEET E509-2. <br />E ( 20 PROVIDE A #4/0, 5' LONG PIG TALL ABOVE GRADE FOR FUTURE GROUNDING <br />10 r = - g CONNECTION. PROVIDE 1" PVC CONDUIT SLEEVE TO PROTECT CONDUCTOR <br />— — - — — WHERE IT EXITS THE CONCRETE SLAB. <br />3 0®, ( I I ICI I1' 8 I 21 EXOTHERMIC WELD OR BURNDY HYGROUND BY OTHERS. <br />S ���-- sCO"NSMUCTIO'N NOTES <br />� <br />I 12 12 I 1. ENSURE THAT EXPOSED METALLIC FEATURES OF TOOL SUPPORTS ARE WELDED <br />OR DRILLED, TAPPED AND FASTENED TO FOUNDATION STEEL TO PROVIDE A <br />I� = CONTINUOUS BOND WITH THE FOUNDATION GROUNDING SYSTEM. PROVIDE <br />- I _ ADDITIONAL BONDING JUMPERS AS NECESSARY FOR EMBEDS. SUCH METALLIC <br />FEATURES SHALL BE BONDED SUCH THAT THEY MEET OR EXCEED THE <br />_.. .25 <br />i .,- , g, ; PERFORMANCE REQUIREMENTS FOR ELECTRODE SYSTEM RESISTANCE <br />0 ( _ - _ ___ . .. _-_�....�, ,s�« _. « r« SG MEASUREMENTS OUTLINED IN PROJECT SPECIFICATIONS. <br />I 17 <br />I I ....... I 2 <br />PROVIDE STATIC GROUND BAR AT 36 A.F.F. ALONG ENTIRE NORTH WALL OF PAINT <br />I 7 9I STORAGE ROOM. BOND TO EXISTING GRID USING #4/0 SDBC CONDUCTOR. <br />3 PROVIDE STATIC GROUND BAR AT 36" A.F.F. ALONG ENTIRE NORTH WALL OF PAINT <br />s - IX ROOM. BOND TO BUILDING COLUMN A4 USING #4/0 SDBC CONDUCTOR PER <br />M <br />DETAIL8/E5091. <br />SEE 1E9-02 PROVIDE STATIC GROUND BARS AT 36" A.F.F. ALONG ENTIRE NORTH & SOUTH <br />— — — — — — — — — — —� — — I I 16 I. f ! WALLS OF GUN CLEANING ROOM. BOND TO EXISTING GRID USING #4/0 SDBC <br />7 <br />B.5 CONDUCTOR. <br />0 <br />---_--.__ <br />i SG SG I I - I.. ,v, v <br />REFERENCE "RAWINGS <br />40 05$ M I E9 OJ PARTIAL GROUNDING PLAN <br />40-058-E509-1 GROUNDING DETAILS <br />40-058-E509-2 GROUNDING DETAILS <br />a I 40-058-E509-3 GROUNDING DETAILS <br />° "[ <br />7 13 <br />— — — "1 -2 <br />i <br />5 B 3 B <br />I� <br />10 I I c c <br />14 14 -4 -5 -6 <br />i � I <br />I 5 I ® 7 13 7 13 <br />I <br />SG e I ( ! I 7 8 <br />- <br />SEE 1E9-06 F SEE 1E9-06 SEE 1E9-06 III <br />I .. T <br />-10 -11 -12 <br />CONSTRUCTION <br />C"ONSTRUCTION NOTES (CONT) <br />FOUNDATION <br />5 CONTRACTOR SHALL GROUND BOOTH COLUMNS ALONG SOUTH END OF CELL TO 19 <br />8. GROUND STACKS BY PROVIDING BONDING JUMPERS ACROSS JUNCTIONS WHERE PARTIAL GROUNDINGPLAN_ _._ _. _ _ _ _ __ _--_---_ __ISSUED FOR <br />J <br />NEAREST BUILDING GROUND GRID LOCATION USING #4/0 AWG BARE STRANDED METALLIC DUCT IS ELECTRICALLY DISCONTINUOUS. PROVIDE A 1/0 AWG COPPER I -13 -14 -15 <br />COPPER CONDUCTOR. INSTALL CADWELD ON NORTH FACE OF COLUMN AS PER CONDUCTOR ALONG EXTERIOR OF STACK FROM GROUND CONNECTION TO TOP OF ' Our difference I I - <br />DETAIL 5/E509=3. STACK BY WELDING A GROUND ROD STUD AND C-CRIMPING CONDUCTOR TO STUD. SCALE: 1/16 T-O°° I is engineered. V <br />uwvw.harrisgroup.com I I I <br />6 CADWELD #4/0 SDBC TO EXISTING GROUND GRID AT SOUTH END OF CELL. 9� BOND TO STATIC GROUND BAR USING #4/0 SDBC CONDUCTOR AND ROUTE IN 3/4" PVC <br />CONDUIT TO MEZZANINE LEVEL NEAR COLUMN A.25/4.0. ` REVISION "C" ONLY <br />CONTRACTOR SHALL PROVIDE #4l0 SDBC CONDUCTOR IN 3l4" PVC CONDUIT IN N/S _ <br />TRENCH BELOW TOOLING CART AND ALONG C10 SUPPORT BEAMS AS SHOWN. 10 PROVIDE AWG STRANDED COPPER IN 3/4" PVC TO RELOCATED CHATSWORTH — PROJECT NO: 0012630.06 I— <br />CADWELD TO ANCHOR RODS OF LEVELING PLATES FOR TOOLING CART, REFER TO COMMUNICATION ENCLOSURE. SEE DRAWING 1 E410-14 FOR LOCATION. BOND TO _ ;' _ _. DRAWN: NH PROD MGR: RLT o <br />STRUCTURAL DRAWING S591-01 FOR BEAM LOCATIONS. EXISTING GROUND GRID AT BUILDING COLUMN B4. <br />0 8° 16' 32' 48' <br />ENGINEER: EOF APPROVED: RLT <br />CHECKED: MWD DATE: 10.25.19 SCALE: 1/16" =1'-0" <br />SYM REVISION BY APPROVED DATE SYM REVISION BY APPROVED DATE DRAWN DATE SUBTITLE CURRENT REVISION SYMBOL DATE <br />DIB���, ACCEPTABILITY RER 12/05/14 <br />THIS DESIGN ANDIOR CHECKED PARTIAL GROUNDING PLAN W5983281 10.25.19 <br />SPECIFICATION IS APPROVED RFW 12/05/14 " <br />B 777X CWC NEW BUILDING -RECORD WBS 2548317 JMG DFC 07f05/17 ENGINEER sHEEr <br />o ® TITLE PFP SPAR PAINT BOOTH AND 2 <br />APPROVED BY DEPT. DATE DFC 12/05/14 <br />C PFP SPAR PAINT BOOTH 1 AND 2 - IFC FOUNDATION W5983281 HG RLT 10.25.19 / <br />(.',t;r CHECKED1 03 <br />r <br />�p 51289 �� APPROVED ®0 JOB NO COMP NO. <br />BUILDING c <br />APPROVED ELECTRICAL MASTER EVERETT, WA DWG No. 40-058-1 E9-03 <br />0f251201 ®NA�'' <br />