Laserfiche WebLink
lim <br />THROUGHOUT THE PLANS ARE ABBREVIATIONS WHICH ARE IN COMMON USE. <br />THE LIST OF ABBREVIATIONS PROVIDED IS NOT INTENDED TO BE COMPLETE OR <br />REPRESENTATIVE OF CONDITIONS OR MATERIALS ACTUALLY USED ON THE <br />PROJECT. THE TECHNICAL REPRESENTATIVE WILL DEFINE THE INTENT OF ANY <br />ABBREVIATION IN QUESTION. <br />& <br />AND <br />® <br />AT <br />APPROXIMATELY <br />ABAN <br />ABANDON <br />AC <br />ASPHALT CONCRETE <br />ADJ <br />ADJUST (-ED,-MENT,-ABLE) <br />AIR <br />COMPRESSED AIR <br />ANSI <br />AMERICAN NATIONAL STANDARD INSTITUTE <br />APPROX <br />APPROXIMATE (-ED, -IVE) <br />ASPH <br />ASPHALT <br />ASTM <br />AMERICAN SOCIETY FOR TESTING AND MATERIALS <br />BIGD <br />BELOW INLET GRATE DEVICE <br />BL DG <br />BUILDING <br />BM <br />BENCH MARK <br />BMP <br />BEST MANAGEMENT PRACTICE <br />BOT <br />BOTTOM <br />CB <br />CATCH BASIN <br />CHR <br />CHILLED RETURN <br />CHS <br />CHILLED SERVICE <br />CL <br />CENTERLINE <br />CM <br />CONSTRUCTION MANAGER/MANAGEMENT <br />CMP <br />CORRUGATED METAL PIPE <br />COL <br />COLUMN <br />CONC <br />CONCRETE <br />COND <br />CONDENSATE <br />CONN <br />CONNECTION <br />CY <br />CUBIC YARD <br />CW <br />CHILLED WATER <br />DEMO <br />DEMOLISH OR DEMOLITION <br />DIA <br />DIAMETER <br />DI <br />DUCTILE IRON <br />DIP <br />DUCTILE IRON PIPE <br />DOE <br />DEPARTMENT OF ECOLOGY <br />DRN <br />DRAIN <br />DW <br />DOMESTIC WATER <br />E <br />EAST <br />EA <br />EACH <br />EHS <br />ENVIRONMENTAL AND HEALTH SERVICES <br />EL, ELEV <br />ELEVATION <br />EV <br />ELECTRICAL VAULT <br />EX <br />EXISTING <br />FH <br />FIRE HYDRANT <br />FIRE <br />FIRE SUPPRESSION MAIN <br />FF <br />FINISH FLOOR <br />FG <br />FINISH GRADE <br />G <br />GAS <br />GV <br />GATE VALVE <br />HORIZ <br />HORIZONTAL <br />ID <br />INSIDE DIAMETER/DIMENSION <br />IE <br />INVERT ELEVATION <br />INV <br />INVERT <br />LF <br />LINEAR FEET <br />MAX <br />MAXIMUM <br />MH <br />MANHOLE <br />MIN <br />MINIMUM; MINUTE <br />MON <br />MONUMENT <br />N <br />NORTH/NEUTRAL <br />N/A <br />NOT APPLICABLE <br />NAD <br />NORTH AMERICAN DATUM <br />NGVD <br />NATIONAL GEODETIC VERTICAL DATUM <br />NOM <br />NOMINAL <br />NO. <br />NUMBER <br />OD <br />OUTSIDE DIAMETER <br />OSHA <br />OCCUPATIONAL SAFETY AND HEALTH ADMINISTRATION <br />PREFAB <br />PREFABRICATED <br />PCC <br />PORTLAND CEMENT CONCRETE <br />PVC <br />POLY VINYL CHLORIDE <br />PVMT <br />PAVEMENT <br />QTY <br />QUANTITY <br />RAID <br />RADIUS <br />REINF <br />REINFORCED <br />S <br />SOUTH, SLOPE <br />SD <br />STORM DRAIN <br />SDCO <br />STORM DRAIN CLEAN OUT <br />SDFM <br />STORM DRAIN FORCE MAIN <br />SDMH <br />STORM DRAIN MANHOLE <br />SF, SQ FT <br />SQUARE FOOT/FEET <br />SHT <br />SHEET <br />SPEC <br />SPECIFICATIONS <br />SS <br />SANITARY SEWER/STAINLESS STEEL <br />SSCO <br />SANITARY SEWER CLEANOUT <br />SSS <br />SANITARY SIDE SEWER <br />STA <br />STATION <br />STS <br />STORM SEWER <br />STD <br />STANDARD <br />STM <br />STEAM <br />SYM <br />SYMMETRICAL <br />TAN <br />TANGENT <br />TEMP <br />TEMPORARY <br />TOP <br />TOP OF PAVEMENT <br />UGP <br />UNDERGROUND POWER <br />VERT <br />VERTICAL <br />VOL <br />VOLUME <br />VS <br />VERSUS <br />W, WTR <br />WEST/WATER <br />WSDOT <br />WASHINGTON STATE DEPARTMENT OF TRANSPORTATION <br />W/ <br />WITH <br />W/0 <br />WITHOUT <br />DETAIL <br />AND <br />SECTON <br />a ► li r '[l <br />C3 C500 <br />DRAWING NUMBER WHERE SHOWN <br />DRAWING NUMBER WHERE TAKEN <br />SECTION LETTER <br />C3 C500 <br />DRAWING NUMBER WHERE SHOWN <br />DRAWING NUMBER WHERE TAKEN <br />SYM REVISION <br />- ACTIVATE STALL 113/777X Cl REFURB W4535737 <br />GENERAL MOTES <br />THE FOLLOWING APPLY UNLESS OTHERWISE INDICATED. <br />1. ALL WORK AND MATERIAL SHALL CONFORM TO BOEING STANDARDS AND SPECIFICATIONS, <br />SNOHOMISH COUNTY STANDARDS, AND CITY OF EVERETT STANDARDS. IF STANDARDS ARE NOT <br />PROVIDED BY THE AUTHORITIES HAVING JURISDICTION, WORK AND MATERIALS SHALL COMPLY WITH <br />THE MOST CURRENT EDITION OF THE STANDARD SPECIFICATIONS FOR ROAD, BRIDGE, AND <br />MUNICIPAL CONSTRUCTION AS JOINTLYPROMULGATED BY THE WASHINGTON STATE DEPARTMENT OF <br />TRANSPORTATION (WSDOT) AND THE WASHINGTON STATE CHAPTER OF THE AMERICAN PUBLIC <br />WORKS ASSOCIATION. <br />2. THE CONTRACTOR SHALL CALL THE UNDERGROUND SERVICE ALERT ONE -CALL NUMBER 811 TWO <br />BUSINESS DAYS PRIOR TO EXCAVATION. <br />3. INFORMATION ON EXISTING CONDITIONS AND BOUNDARIES/RIGHT OF WAY SHOWN ON THESE PLANS <br />WAS OBTAINED FROM A SURVEY NOT PERFORMED BY COFFMAN ENGINEERS. NO GUARANTEE IS <br />MADE AS TO THE ACCURACY OR COMPLETENESS OF THE INFORMATION SHOWN. THE CONTRACTOR <br />SHALL FIELD VERIFY EXISTING CONDITIONS AND REQUIRED ELEVATIONS AT THE SUBJECT SITE. <br />VERIFY THE LOCATION AND SIZE OF EXISTING UTILITIES BEFORE PROCEEDING WITH CONSTRUCTION <br />ACTIVITIES, INCLUDING UNDERGROUND AND OVERHEAD UTILITIES, UTILITY STRUCTURES, POINTS OF <br />CONNECTION, AND UTILITY CROSSINGS. NOTIFY THE ENGINEER OF ANY DISCREPANCIES OR <br />EXCEPTIONS ENCOUNTERED PRIOR TO PROCEEDING. ANY COSTS INCURRED AS A RESULT OF THE <br />CONTRACTOR'S FAILURE TO VERIFY EXISTING CONDITIONS PRIOR TO BEGINNING CONSTRUCTION <br />SHALL BE BORNE BY THE CONTRACTOR. <br />4. THE CONTRACTOR SHALL HAVE A COMPLETE SET OF APPROVED CONSTRUCTION DOCUMENTS <br />(INCLUDING ADDENDA) ON THE JOB SITE WHENEVER CONSTRUCTION IS IN PROGRESS. <br />5. THE CONTRACTOR SHALL PERFORM ALL WORK NECESSARY TO COMPLETE THIS PROJECT IN <br />ACCORDANCE WITH THE CONSTRUCTION DOCUMENTS, INCLUDING SUCH INCIDENTALS AS MAY BE <br />NECESSARY TO MEET REQUIREMENTS AND STANDARDS OF THE AUTHORITIES HAVING JURISDICTION. <br />6. THE DRAWINGS INDICATE LOCATIONS, DIMENSIONS, REFERENCES, AND TYPICAL DETAILS OF <br />CONSTRUCTION. THE DRAWINGS DO NOT INDICATE EVERY CONDITION. WORK NOT FULLY DETAILED <br />SHALL BE CONSTRUCTED SIMILAR TO PARTS THAT ARE FULLY DETAILED. <br />7. THE CONTRACTOR SHALL OBTAIN THE APPROPRIATE APPROVALS AND PERMITS FROM THE <br />AUTHORITIES HAVING JURISDICTION PRIOR TO PROCEEDING WITH CONSTRUCTION ACTIVITIES. THE <br />CONTRACTOR SHALL COORDINATE WITH THE AUTHORITIES HAVING JURISDICTION TO CONFIRM <br />INSPECTION, TESTING, AND CERTIFICATION REQUIREMENTS. <br />8. CONSTRUCTION SHALL COMPLY WITH THE AMERICANS WITH DISABILITIES ACT ACCESSIBILITY <br />GUIDELINES (ADAAG). <br />9. EXISTING PROPERTY CORNERS AND SURVEY MONUMENTS SHALL BE PROTECTED DURING <br />CONSTRUCTION. ANY DAMAGED OR OBLITERATED CORNERS OR MONUMENTS SHALL BE <br />RE-ESTABLISHED BY A PROFESSIONAL SURVEYOR AT THE CONTRACTOR'S EXPENSE. <br />10. THE CONTRACTOR SHALL BE RESPONSIBLE FOR TRAFFIC CONTROL IN ACCORDANCE WITH THE <br />MANUAL OF UNIFORM TRAFFIC CONTROL DEVICES (MUTCD) STANDARDS. COORDINATE <br />REQUIREMENTS WITH BOEING, SNOHOMISH COUNTY, AND CITY OF EVERETT. <br />11. SAFETY STANDARDS AND REQUIREMENTS SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR AND <br />COMPLIED WITH AS SET FORTH BY OSHA. <br />12. REFER TO ARCHITECTURAL AND STRUCTURAL DOCUMENTS FOR ADDITIONAL INFORMATION REGARDING <br />CONSTRUCTION OF STRUCTURES, ENCLOSURES, STAIRS, SIDEWALKS/PATHS, LANDINGS/PATIOS, <br />FENCING, RAILING, AND GATES. <br />13. RECORD DRAWINGS IDENTIFYING AND ACCURATELY LOCATING SUBSURFACE UTILITIES AND <br />IMPROVEMENTS AND NOTING AS -CONSTRUCTED CONDITIONS SHALL BE PROVIDED BY THE <br />CONTRACTOR AT THE END OF CONSTRUCTION. <br />14. CONTRACTOR TO LOCATE AND DETERMINE DEPTH OF EXISTING UTILITIES. NOTIFY BOEING AND THE <br />ENGINEER OF ANY CONFLICTS BETWEEN EXISTING FEATURES AND THE PLACEMENT OF NEW <br />FACILITIES. <br />15. THE CONTRACTOR SHALL BE RESPONSIBLE FOR ALL TRAFFIC CONTROL ON -SITE AND SHALL <br />COORDINATE HIS ACTIVITIES WITH THE OWNER AND ENGINEER A MINIMUM OF TWO (2) WEEKS IN <br />ADVANCE OF THE BEGINNING OF WORK. THE CONTRACTOR IS RESPONSIBLE FOR PROVIDING ALL <br />TRAFFIC CONTROL SIGNS. SAFE VEHICULAR AND PEDESTRIAN ACCESS SHALL BE PROVIDED AT ALL <br />TIMES DURING CONSTRUCTION. SHUTDOWN OF OWNER OPERATION OR ACCESS WILL NOT BE <br />PERMITTED. <br />16. THE CONTRACTOR SHALL MAINTAIN A CLEAN WORK AREA AT ALL TIMES BY SWEEPING. WASHING OF <br />PAVEMENT WILL NOT BE ALLOWED WITHOUT PRIOR BOEING APPROVAL. <br />17. FIELD VERIFY DIMENSIONS FOR WORK PRIOR TO START OF WORK. <br />18. ALL WORK SHALL BE PERFORMED IN A WORKMANLIKE MANNER AND IN CONFORMANCE WITH <br />APPLICABLE CODES, REGULATIONS AND PERMIT REQUIREMENTS. <br />19. PRIOR TO PLACING PAVEMENT, THE CONTRACTOR SHALL ENSURE THAT ALL REQUIRED <br />UNDERGROUND UTILITIES AND APPURTENANCES ARE IN PLACE, INCLUDING, BUT NOT LIMITED TO: <br />SANITARY SEWER, STORM DRAIN, GAS, ELECTRIC, TELEPHONE, COMMUNICATION SYSTEMS, CABLE <br />TELEVISION, SITE LIGHTING AND IRRIGATION SLEEVES. <br />20. ALL DISTURBED PROPERTY AND VEGETATION SHALL BE RESTORED TO ORIGINAL CONDITION OR <br />BETTER AS SPECIFIED. <br />21. THE CONTRACTOR SHALL MAINTAIN ALL SIGNS, BARRICADES, WARNING LIGHTS, AND OTHER DEVICES <br />NECESSARY FOR SAFETY. <br />22. CONTACT JOHN PEARSON AT (425) 266-8502 FOR CURRENT C225 SHEET FOR EACH STALL AS <br />THE STOP BARS AND TETHERS ARE TO BE INSTALLED. <br />MONITORING WELL PROTECTION NOTES- <br />1 . MONITORING WELLS IN THE PROJECT AREA SHOULD BE PROTECTED. ANY DAMAGE TO A WELL <br />MUST BE REPORTED TO THE BOEING CONSTRUCTION MANAGER. NO REPAIR SHOULD BE <br />ATTEMPTED WITHOUT CONTACTING BOEING EHS. <br />UTILITY LOCATE NOTES <br />1. CONTRACTOR SHALL PROCURE UTILITY LOCATING SERVICE TO LOCATE BOEING-OWNED UTILITIES PRIOR <br />TO EXCAVATING. <br />EXISTING UTILITY NOTE <br />1. EXISTING UTILITY AND OTHER SUBSURFACE INFORMATION SHOWN ON THESE DRAWINGS HAS BEEN <br />COMPILED FROM THE BEST INFORMATION AVAILABLE. THIS INFORMATION, HOWEVER, IS NOT <br />GUARANTEED TO BE ACCURATE OR COMPLETE. CONTRACTOR TO LOCATE (INCLUDING ELEVATION) <br />ALL EXISTING UNDERGROUND UTILITIES PRIOR TO EXCAVATING FOR CONSTRUCTION. <br />MISC. REFERENCE SYMBOLS <br />EcBOAT NOTE DESCRIBING SPECIFIC FEATURE THAT WILL REMAIN ON <br />THE DRAWINGS AFTER CONSTRUCTION FOR FUTU'E REFERENCE <br />1 FLAG NOTE FOR SPECIFIC CONSTRUCTION DIRECTION <br />.PAINT STRIPING NOTES <br />1. DURING CONSTRUCTION, THE CONTRACTOR SHALL BE RESPONSIBLE FOR ALL TEMPORARY <br />STRIPING/SIGNAGE NECESSARY TO MAINTAIN SAFE V`1HICLE AND PEDESTRIAN TRAFFIC. <br />2. THE CONTRACTOR SHALL BE RESPONSIBLE FOR REPAINTING ALL LINES AND SYMBOLS OBSCURED BY <br />HIS WORK TO THE SATISFACTION OF THE OWNER. PRIOR TO CONSTRUCTION, THE CONTRACTOR <br />SHALL FIELD VERIFY THE EXISTING STRIPING/SURFACE OF EACH PAVEMENT SEGMENT TO BE <br />RECONSTRUCTED. <br />3. THE CONTRACTOR SHALL VACUUM ALL FOREIGN OBJECT DEBRIS 99 FOD99 AND LOOSE BEADS PRIOR TO <br />AND AFTER INSTALLATION. <br />4. THE CONTRACTOR SHALL LAYOUT ALL PROPOSED PAIINT STRIPING FOR OWNER'S REVIEW/APPROVAL . <br />PRIOR TO FINAL STRIPING. <br />5. COORDINATE STRIPING WITH THE BOEING COMPANY TO MATCH EXISTING STANDARD STRIPING. <br />6. ALL PAVEMENT MARKINGS SHALL BE AIRMARK PRE -FORMED THERMOPLASTIC PAVEMENT MARKINGS <br />FOR AIRFIELDS, BY ENNIS-FLINT CORPORATION, UNLESS OTHERWISE SPECIFIED. <br />7. ALL PRE -FORMED THERMOPLASTIC SHALL HAVE A THICKNESS OF 65 MILS (1.7MM). <br />8. RETROREFLECTIVE GLASS BEADS MUST BE MIXED THROUGHOUT THE THERMOPLASTIC MATERIAL. <br />9. APPLICATION OF AIRMARK PAVEMENT MARKINGS ON PAVEMENT MUST BE DONE BY A CERTIFIED <br />AIRMARK APPLICATOR WITH EXPERIENCE USING LARGE INFRARED HEATERS. <br />10. FLIGHTLINE STALL STRIPING AND LABELING, SHALL BE LOCATED PER THE INDIVIDUAL STALL DRAWINGS <br />45-YD-C225(STALL#). CONTRACTOR SHALL CONTACT BOEING ENGINEERING FOR ANY <br />CLARIFICATIONS. <br />10.1. TAXIWAY STRIPING SHALL BE 6 SOLID YELLOW (STRIPE. <br />10.2. CENTER OF STALL STRIPING SHALL BE 6" SOLID YELLOW STRIPE. <br />10.3. 747 OUTBOARD GEAR STRIPE SHALL BE 4" SOLID YELLOW STRIPE. <br />10.4. STALL LANE STRIPING SHALL BE 4" SOLID YELLOW STRIPE. <br />10.5. FRONT OF STALL STRIPING SHALL BE 6" SOLID WHITE STRIPE. <br />10.6. STALL STOP BAR STRIPING SHALL BE 4" X 16'' LG. SOLID YELLOW STRIPE. <br />10.7. STALL LABELS (STOP BARS, CENTER LINE, ETC.) SHALL BE 3" YELLOW (ARIL NARROW FONT) <br />TEXT ON BLACK BACKGROUND PER BOEING FLIGHTLINE STALL STRIPING - DETAIL <br />45-YD-C225C. <br />1. REMOVE ALL DELETERIOUS MATERIAL FOUND ON -SITE ',INCLUDING VEGETATION, SCRAP WOOD, TRASH, <br />ETC. AND DISPOSE OF AT AN APPROVED OFF -SITE LOCATION. <br />2. AT ALL TIMES THE CONTRACTOR SHALL MAINTAIN SIGNS, BARRICADES. FENCING, OR OTHER MEASURES <br />TO ENSURE CONTINUOUS PROTECTION OF THE PUBLICS AND TO PREVENT UNAUTHORIZED ENTRY TO <br />THE CONSTRUCTION AREA. AT A MINIMUM FENCING SH LL BE 6.0 FEET HIGH. COORDINATE SAFETY <br />AND SECURITY MEASURES WITH ADJACENT WORK. <br />3. DAMAGE TO ANY PROPERTY, INCLUDING BUT NOT LIMITED TO, BUILDINGS, UTILITIES, VEHICLES, <br />FENCING, OR LANDSCAPING AS A RESULT OF CONTRACTORS ACTIVITIES SHALL BE REPAIRED OR <br />REPLACED AT THE CONTRACTOR'S EXPENSE. <br />4. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE PROTECTION OF ALL EXISTING SURVEY <br />MONUMENTS AND OTHER SURVEY MARKERS DURING CONSTRUCTION. ALL SUCH MONUMENTS OR <br />MARKERS DESTROYED DURING CONSTRUCTION SHALL BE REPLACED AT THE CONTRACTOR'S EXPENSE <br />TO ORIGINAL LOCATION AND ELEVATION, <br />5. THE CONTRACTOR IS FINANCIALLY RESPONSIBLE FOR THE MAINTENANCE OR REPAIR OF OFF -SITE AND <br />ON -SITE PAVED SURFACES WHERE DAMAGE HAS BEEN, SUSTAINED BECAUSE OF CONSTRUCTION <br />TRAFFIC. <br />6. ALL CONCRETE, PAVEMENT, CURBS, SIDEWALKS AND RAMPS INDICATED TO BE REMOVED OR REPLACED <br />SHALL BE REMOVED TO THE NEAREST EXPANSION JOINT AS IDENTIFIED DURING CONSTRUCTION. <br />WHERE THIS IS NOT POSSIBLE DUE TO CONFLICTS OR ADJACENT DAMAGED CONCRETE / ASPHALT, <br />THE CONTRACTOR SHALL MAKE A FULL PAVEMENT DEPTH SAWCUT AT THE PROPOSED JOINT IN SOUND <br />PAVEMENT. PROPOSED CONCRETE / ASPHALT SHALL EXTEND TO THE SAWCUT EDGE AND BE <br />APPROPRIATELY JOINED / SEALED. THE CONTRACTOR SHALL MAKE SAWCUTS AT EXISTING CONTRACTION <br />JOINTS WHERE POSSIBLE. <br />7. TO THE MAXIMUM EXTENT POSSIBLE THE CONTRACTOR SHALL SALVAGE AND REUSE ALL CATCH BASIN <br />FRAMES, GRATES, COVERS, MANHOLE LIDS AND ANY OTHER EXISTING METAL WORKS IN PAVEMENTS <br />DESIGNATED FOR REMOVAL / REPLACEMENT. <br />I <br />8. ALL DEMOLITION DEBRIS SHALL BE DISPOSED OF LEGALLY OFF -SITE. <br />i <br />GRADING AND EARTHWORK GENERAL NOTES <br />1. EXPOSED SOIL MUST BE COVERED WITHIN 5 DAYS OF EXPOSURE DURING THE DRY SEASON (MAY 1 <br />THROUGH SEPTEMBER 30) AND WITHIN 48 HOURS ::OF EXPOSURE DURING THE WET SEASON <br />(OCTOBER 1 THROUGH APRIL 30). <br />2. FROM OCTOBER 1 THROUGH MARCH 31, GRADING SHALL BE LIMITED TO AN AREA NO LARGER <br />THAN ONE ACRE. <br />3. ALL PAVEMENT MUST BE KEPT CLEAN AND FREE OF SEDIMENT. <br />4. PLASTIC COVERING MAY BE USED ON STOCKPILE AREAS TO MAINTAIN OPTIMUM MOISTURE CONTENT <br />AND PREVENT SEDIMENT TRANSPORT. <br />C B PROTECTION NOTES <br />1. CATCH BASIN INLET PROTECTION SHALL BE INSTALLED ON ALL ADJACENT CATCH BASINS AND <br />IMMEDIATELY UPON NEW CATCH BASIN INSTALLATION AND SHALL REMAIN UNTIL FINAL SITE <br />STABILIZATION. <br />I <br />2. CATCH BASIN INLET PROTECTION SHALL BE INSTALLED IN ACCORDANCE WITH MANUFACTURER'S <br />RECOMMENDATIONS, AND MAINTAINED TO OPERATE PROPERLY. <br />3. CATCH BASIN INLET PROTECTION SHALL BE REMOVED FOLLOWING COMPLETION OF CONSTRUCTION <br />AND STABILIZATION OF ALL CLEARED AREAS. CATCH BASINS SHALL BE VACTOR CLEANED AND <br />INSPECTED UPON COMPLETION OF CONSTRUCTION. <br />4 @ 45458 $ <br />��GISTjR <br />Z . <br />sIOrdAL ��SG <br />TESC NOTES <br />1. TEMPORARY EROSION AND SEDIMENT CONTROL (TESC) MEASURES SHALL BE INSTALLED PRIOR TO <br />ANY SOIL -DISTURBING ACTIVITY. <br />2. APPROVAL OF THIS TESC PLAN DOES NOT CONSTITUTE AN APPROVAL OF PERMANENT ROAD OR <br />DRAINAGE DESIGN (E.G. SIZE AND LOCATION OF ROADS, PIPES, RESTRICTORS, CHANNELS, <br />RETENTION FACILITIES, UTILITIES...) <br />3. THE IMPLEMENTATION OF THIS TESC PLAN AND THE CONSTRUCTION, MAINTENANCE, REPLACEMENT, <br />AND UPGRADING OF THESE TESC PLAN FACILITIES IS THE RESPONSIBILITY OF THE CONTRACTOR <br />UNTIL ALL CONSTRUCTION IS APPROVED. <br />4. IF INSTALLATION OF SILT FENCE IS NOT POSSIBLE ON PAVED AREAS, CONTRACTOR SHALL <br />IMPLEMENT ALTERNATE EROSION AND SEDIMENT CONTROL MEASURES. <br />5. THE BOUNDARIES OF THE CONSTRUCTION LIMITS SHOWN ON THIS PLAN SHALL BE CLEARLY <br />FLAGGED IN THE FIELD PRIOR TO CONSTRUCTION. DURING THE CONSTRUCTION PERIOD, NO <br />DISTURBANCE AND/OR MATERIAL/EQUIPMENT STAGING SHALL BE PERMITTED BEYOND THE FLAGGED <br />CONSTRUCTION LIMITS. THE FLAGGING SHALL BE MAINTAINED BY THE CONTRACTOR FOR THE <br />DURATION OF CONSTRUCTION. <br />6. THE CONTRACTOR SHALT_ PROVIDE AND MAINTAIN TEMPORARY SEDIMENTATION FACILITIES TO <br />ENSURE THAT SEDIMENT -LADEN WATER DOES NOT ENTER THE NATURAL OR PUBLIC DRAINAGE <br />SYSTEM. <br />7. THE TESC FACILITIES REFERRED ON THIS PLAN ARE THE MINIMUM REQUIREMENTS FOR <br />ANTICIPATED SITE CONDITIONS. AS CONSTRUCTION PROGRESSES AND UNEXPECTED (SEASONAL) <br />CONDITIONS DICTATE, MORE SILTATION CONTROL FACILITIES (E.G. ADDITIONAL SUMP PUMPS, <br />RELOCATION OF DITCHES, ETC), MAY BE REQUIRED TO ENSURE COMPLETE SILTATION CONTROL OF <br />THE PROJECT. THEREFORE, DURING THE COURSE OF CONSTRUCTION; THE CONTRACTOR SHALL <br />ADDRESS ANY CHANGED OR NEW CONDITIONS THAT MAY BE CREATED BY THE CONTRACTOR'S <br />ACTIVITIES AND PROVIDE ADDITIONAL_ FACILITIES THAT MAY BE REQUIRED TO PROTECT ADJACENT <br />PROPERTIES. THE CONTRACTOR SHALL UPDATE THE SWPPP ACCORDINGLY. <br />8. IF NECESSARY FOR SEDIMENT CONTROL, THE CONTRACTOR SHALL DESIGN AND CONSTRUCT <br />SEDIMENT TRAPS AS REQUIRED BY AND IN ACCORDANCE WITH DRAWING #215 OF THE CITY OF <br />EVERETT "DESIGN AND CONSTRUCTION STANDARDS AND SPECIFICATIONS FOR DEVELOPMENT" <br />MANUAL: HTTPS:Z/WWW.EVER ETTWA.GOV/DOCUMENTCENTER/VIEW/243 <br />9. THE TESC FACILITIES SHALL BE INSPECTED DAILY BY THE CONTRACTOR AND MAINTAINED AS <br />NECESSARY TO ENSURE THEIR CONTINUED EFFECTIVENESS. <br />10. ANY AREA STRIPPED OF VEGETATION, INCLUDING EXCAVATION EMBANKMENTS, WHERE NO FURTHER <br />WORK IS ANTICIPATED FOR A PERIOD OF TIME OF TWO (2) DAYS DURING WET SEASON (FROM <br />OCTOBER 1 THROUGH APRIL 30) AND SEVEN (7) DAYS DURING DRY SEASON (FROM MAY 1 TO <br />SEPTEMBER 30), SHALT_ BE IMMEDIATELY STABILIZED WITH THE APPROVED TESC METHODS <br />APPLICABLE FOR THE SEASON (E.G. SEEDING, MULCHING, NETTING, EROSION BLANKETS, PLASTIC... <br />ETC). <br />11. THE TESC FACILITIES AT ACTIVE AREAS OF THE SITE SHALL BE INSPECTED AND MAINTAINED A <br />MINIMUM OF ONCE A WEEK OR WITHIN 24 HOURS OF A STORM EVENT. <br />12. CONTRACTOR SHALL PROVIDE AND PROPERLY MAINTAIN CATCH BASIN INSERTS IN ALL EXISTING <br />AND NEW CATCH BASINS WITHIN THE CONSTRUCTION LIMITS. AT NO TIME SHALL MORE THAN 6 <br />INCHES OF SEDIMENT BE ALLOWED TO ACCUMULATE WITHIN A CATCH BASIN INSERT. ALL CATCH <br />BASINS AND CONVEYANCE LINES SHALL BE CLEARED PRIOR TO PLACING RIGID OR FLEXIBLE <br />PAVEMENT. THE CLEARING OPERATION SHALL NOT FLUSH SEDIMENT -LADEN WATER INTO <br />DOWNSTREAM SYSTEM. <br />13. STABILIZED CONSTRUCTION ENTRANCES SHALL BE INSTALLED AT THE BEGINNING OF CONSTRUCTION <br />AND MAINTAINED FOR THE DURATION OF THE PROJECT. ADDITIONAL MEASURES MAY BE REQUIRED <br />TO INSURE THAT ALL PAVED AREAS ARE KEPT CLEAN FOR THE DURATION OF THE PROJECT. <br />14. WHERE SEEDING IS REQUIRED AS A TEMPORARY STABILIZATION, FAST GERMINATING GRASSES SHALL <br />BE APPLIED AT AN APPROPRIATE RATE (E.G. ANNUAL OR PERENNIAL RYE APPLIED AT <br />APPROXIMATELY 80 LBS / ACRE). <br />15. SCRAPING AND SWEEPING OF STREETS, SIDEWALKS, AND FLOWLINES MUST BE CONDUCTED AT THE <br />END OF EACH WORK DAY (OR MORE FREQUENTLY, IF REQUESTED) WITH A VACUUM SWEEPER OR <br />OTHER MEANS APPROVED BY BOEING ENVIRONMENTAL AFFAIRS. <br />16. THE CONTRACTOR SHALL IMPLEMENT LINEAR RUN-ON CONTROLS TO PREVENT WATER FROM <br />ENTERING THE CONSTRUCTION AREA. <br />17. PROCESS WATER, WHICH INCLUDES CONCRETE WASHOUT, WHEEL WASH WATER, AND SWEEPER <br />TRUCK WASTEWATER, SHALL BE HAULED OFFSITE TO AN APPROPRIATE DISPOSAL SITE, OR <br />DISCHARGED AFTER TREATMENT TO THE SANITARY SEWER WITH LOCAL AGENCY AND BOEING <br />ENVIRONMENTAL AFFAIRS APPROVAL. PROCESS WATER SHALL NOT BE DISCHARGED TO THE STORM <br />DRAIN. <br />18. THE CONTRACTOR SHALL REEFER TO "WASHINGTON DEPARTMENT OF ECOLOGY 2012 STORMWATER <br />MANAGEMENT MANUAL FOR WESTERN WASHINGTON, AS AMENDED IN DECEMBER 2014" FOR ANY <br />EROSION AND SEDIMENTATION CONTROLS. AS APPROVED BY ENVIRONMENTAL AFFAIRS, THE <br />CONTRACTOR SHALL IMPLEMENT STORMWATER BMPS CONTAINED IN THIS MANUAL, INCLUDING THE <br />PROPER SELECTION, IMPLEMENTATION, AND MAINTENANCE OF ALL APPLICABLE AND APPROPRIATE <br />BMPS FOR ON -SITE EROSION, SEDIMENTATION, AND POLLUTION CONTROL. <br />19. STATIONARY EQUIPMENT CONTAINING MORE THAN 55 GALLONS OF OIL/FUELS REQUIRES <br />SECONDARY CONTAINMENT. <br />20. STATIONARY EQUIPMENT LOCATED WITHIN 25 FEET OF A CATCH BASIN OR ON UNPAVED AREAS <br />REQUIRES SECONDARY CONTAINMENT. <br />21. PORTABLE SANITARY FACILITIES SHALL BE LOCATED AT LEAST 25 FEET FROM ANY STORM SEWER <br />INLET OR WATER BODY AND SHALL BE SERVICED REGULARLY, AS NEEDED. <br />22. THERE SHALL BE NO CONCRETE WASHOUT AREA ON BOEING SITE UNLESS AUTHORIZED BY BOEING <br />ENVIRONMENTAL AFFAIRS. IF AUTHORIZED, THE WASHOUT SHALL BE THE ECO-PAN CONTAINMENT <br />SYSTEM OR ANOTHER SYSTEM APPROVED BY ENVIRONMENTAL AFFAIRS, AND SERVICED ADEQUATELY <br />PER CASE BY CASE INSTRUCTIONS. <br />23. NEWLY INSTALLED STORMWATER LINES AND STRUCTURES SHALL BE FLUSHED AND CLEANED <br />BEFORE PLACING IN SERVICE OR CONNECTING TO THE EXISTING STORMWATER SYSTEM. <br />ACCEPTABILITY M. BaSILKOV <br />THIS DESIGN AND/OR CHECKED <br />SPECIFICATION IS APPROVED A. HAZEN <br />ENGINEER <br />APPROVED BY DEPT. DATE A. HAZEN <br />M t SUBTITLE <br />03.26.19 <br />03.26.19 <br />TITLE <br />03,26.19 <br />GENERAL MASTER <br />24. A PLAN FOR FINAL SITE STABILIZATION SHALL BE PROVIDED BY CONTRACTOR AT THE OUTSET OF <br />THE PROJECT FOR APPROVAL BY ENVIRONMENTAL AFFAIRS. UPON PLAN IMPLEMENTATION, <br />ENVIRONMENTAL AFFAIRS SHALL APPROVE FINAL STABILIZATION METHODOLOGIES. PROJECT SHALL <br />NOT BE DEEMED TERMINATED UNTIL ENVIRONMENTAL AFFAIRS DETERMINES THAT THE PROJECT SITE <br />MEETS ALL THE REQUIREMENTS OF FINAL SITE STABILIZATION AS DEFINED BY THE CITY OF <br />EVERETT. <br />THE CONTRACTOR SHALL FOLLOW THE 2010 CITY OF EVERETT'S STORMWATER MANUAL, VOLUME II: <br />2.4.5. ELEMENT 5: STABILIZE SOILS <br />1. ALL EXPOSED AND UNWORKED SOILS SHALL BE STABILIZED BY APPLICATION OF EFFECTIVE_ BMPS <br />THAT PROTECT THE SOIL FROM THE EROSIVE FORCES OF RAINDROP IMPACT, FLOWING WATER, AND <br />WIND. <br />2. FULL STABILIZATION MEANS ALL SOIL DISTURBING ACTIVITIES AT THE SITE HAVE BEEN COMPLETED <br />AND AREAS WHERE THE SOIL OR NATURAL VEGETATIVE COVER HAS BEEN DISTURBED HAVE BEEN <br />PROPERLY COVERED AND ACCEPTED TO MEET PERMANENT EROSION CONTROL. PERMANENT <br />EROSION CONTROL CAN INCLUDE CONCRETE OR ASPHALT PAVING: QUARRY SPALLS USED AS DITCH <br />LINING; APPLICATION OF THICK LAYERS OF GRAVEL OR MULCH; OR VEGETATIVE COVER IN A <br />MANNER THAT WILL FULLY PREVENT SOIL EROSION. WHERE THE TERM "FULLY ESTABLISHED" IS <br />USED TO DESCRIBE_ VEGETATIVE COVER OR PLANTINGS, IT SHALL BE UNDERSTOOD TO MEAN THAT <br />HEALTHY VEGETATION COVERS 90 PERCENT OF EXPOSED BARE SOIL, THE APPLICATION OF <br />HYDROSEEDING, EVEN IN CONJUNCTION WITH A BONDED FIBER MATRIX (BFM) OR ROLLED EROSION <br />PRODUCT WILL NOT BE ACCEPTED AS FULLY ESTABLISHED PERMANENT EROSION CONTROL BEFORE <br />THE NECESSARY DEVELOPMENT AND GROUND COVER REQUIREMENTS OF THE PLANTINGS ARE MET. <br />THE STRONG ROOT STRUCTURES OF WELL ESTABLISHED VEGETATION ARE AN ESSENTIAL <br />MECHANISM IN CONTROLLING SOIL EROSION. THE CITY WILL INSPECT AND MUST APPROVE ALL <br />AREAS AS FULLY STABILIZED BEFORE THE RELEASE OF FINANCIAL GUARANTEES. <br />3. TEMPORARY EROSION CONTROL MEASURES SHALL REMAIN IN PLACE UNTIL PERMANENT MEASURES <br />ARE ESTABLISHED. <br />4. THE CONTRACTOR SHALL INSPECT ALL SEEDED AREAS FOR FAILURES AND RE -SEED, FERTILIZER, <br />AND MULCH WITHIN THE PLANTING SEASON, USING NOT LESS THAN HALF THE ORIGINAL <br />APPLICATION RATES. ANY REVEGETATION EFFORTS THAT DO NOT PROVIDE ADEQUATE COVER MUST <br />BE REAPPLIED AT A SCHEDULE RECOMMENDED BY THE BOEING COMPANY. <br />5. THE CONTRACTOR SHALL SUPPLY ALL SEEDED/SOD AREAS WITH ADEQUATE MOISTURE, BUT NOT <br />TO THE EXTENT RUNOFF OCCURS. THE CONTRACTOR SHALL ENSURE THE SITE IS FULLY <br />STABILIZED UPON COMPLETION OF THE PROJECT. <br />TESC BMP'S <br />1. THE CONTRACTOR SHALL REFER TO "CITY OF EVERETT STORMWATER MANAGEMENT MANUAL, 2010" <br />FOR ANY EROSION AND SEDIMENTATION CONTROLS. THE FOLLOWING LIST CONTAINS SOME COMMON <br />BEST MANAGEMENT <br />PRACTICES (BMPS), BUT ARE NOT LIMITED TO THE ONES LISTED BELOW: <br />BMP <br />C105: <br />STABILIZED CONSTRUCTION ENTRANCE <br />BMP <br />C106: <br />WHEEL WASH <br />BMP <br />C123: <br />PLASTIC COVERING <br />BMP <br />C140: <br />DUST CONTROL <br />BMP <br />C150: <br />MATERIALS ON HAND <br />BMP <br />C151: <br />CONCRETE HANDLING <br />BMP <br />C152: <br />SAWCUTTING AND SURFACE POLLUTION PREVENTION <br />BMP <br />C153: <br />MATERIAL DELIVERY, STORAGE AND CONTAINMENT <br />BMP <br />C160: <br />CERTIFIED EROSION AND SEDIMENT CONTROL LEAD <br />BMP <br />C200: <br />INTERCEPTOR DIKE AND SWALE <br />BMP <br />C207: <br />CHECK DAMS <br />BMP <br />C220: <br />STORM DRAIN INLET PROTECTION <br />BMP <br />C233: <br />SILT FENCE <br />BMP <br />C235: <br />STRAW WATTLES <br />BMP <br />C240: <br />SEDIMENT TRAP <br />BMP <br />C241: <br />TEMPORARY SEDIMENT POND <br />*BMP <br />C250: <br />CONSTRUCTION STORMWATER CHEMICAL TREATMENT <br />*BMP <br />C251: <br />CONSTRUCTION STORMWATER FILTRATION <br />acom l-lll1100IIIIIIIIIZITf:T1111 <br />POLLUTION PREVENTION NOTES <br />1. EQUIPMENT LUBRICATION AND FUELING OPERATIONS SHALL OCCUR AT AN APPROVED OFF -SITE <br />LOCATION. <br />2. PREVENT OILS AND FUELS FROM ENTERING THE STORM DRAINAGE SYSTEM WITH PROPER <br />CONTAINMENT DEVICES. <br />3. ACCESS TO CONSTRUCTION IS VIA ADJACENT EXISTING PAVED STREETS. SWEEP DIRT FROM <br />PAVING DAILY OR AS NEEDED. THE INTENT IS TO PREVENT DIRT AND DEBRIS FROM VEHICLES <br />AND EQUIPMENT FROM BEING DEPOSITED ON BOEING-OWNED STREET AND CITY STREET <br />PAVEMENT. <br />4. SPILL CLEANUP PROCEDURES SHALL BE POSTED ONSITE. IN CASE OF A SPILL THAT MAY ENTER <br />GROUNDWATER, SURFACE WATER, OR STORM DRAIN SYSTEM, CONTACT BOEING EMERGENCY <br />DISPATCH AT (206) 655-2222. SPILLS SHALL BE CLEANED UP IMMEDIATELY AND CONTAMINATED <br />MATERIAL DISPOSED OF PROPERLY. <br />5. THE CONTRACTOR SHALL PREVENT ALL MATERIAL USED OR GENERATED ONSITE FROM ENTERING <br />THE STORM DRAINAGE SYSTEM. THE CONTRACTOR IS RESPONSIBLE FOR PROVIDING ADEQUATE <br />CONTAINMENT/SEPARATION AT ALL TIMES. ALL STORMWATER POLLUTION PREVENTION MEASURES <br />SHALL BE COORDINATED WITH ENVIRONMENTAL ENGINEERING TO ENSURE COMPLIANCE WITH <br />APPLICABLE STORMWATER PERMITS. CONTACT BOEING SAFETY, HEALTH & ENVIRONMENTAL <br />AFFAIRS [SHEA - (206) 544-2393.] A MINIMUM OF TWO (2) WEEKS PRIOR TO THE START OF <br />CONSTRUCTION. <br />6. THE CONTRACTOR SHALL FOLLOW ALL ENVIRONMENTAL AND OTHER REQUIREMENTS AS DEFINED <br />IN THE BOEING SERVICE PROVIDER MANUAL (AVAILABLE UPON REQUEST). <br />7. THE CONTRACTOR SHALL HAVE AN APPROPRIATE SPILL KIT. <br />ISSUE FOR PERMIT <br />3/26/2019 <br />22999265/W6214003 - 03.26.19 <br />SHEET <br />C2 <br />JOB NO. COMP NO. <br />22999285/W6214003 <br />EVERETT, WADWG N0. 45-YD-C2 <br />