My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Always Active Services 1/23/2023
>
Contracts
>
10 Years Then Transfer to State Archivist
>
2023
>
Always Active Services 1/23/2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/4/2024 3:35:38 PM
Creation date
1/27/2023 9:43:09 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Always Active Services
Approval Date
1/23/2023
Council Approval Date
12/21/2022
End Date
1/4/2023
Department
Public Works
Department Project Manager
Christina Curtis
Subject / Project Title
Fleming Bicycle Corridor
Public Works WO Number
PW3767
Tracking Number
0003556
Total Compensation
$473,273.00
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
376
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I . <br /> IBID PROPOSAL <br /> CITY OF EVERETT,WASHINGTON <br /> IFLEMING BICYCLE CORRIDOR <br /> I COE # PW3767 <br /> FEDERAL AID#CM-0420(027) <br /> I <br /> Note: Unit prices for all items,all extensions,and the total amount bid must be shown. Where conflict occurs between the unit price and the <br /> total amount named for any item,the unit price shall prevail,and totals shall be corrected to conform thereto. All entries must be typed or <br /> entered in ink. <br /> BIDDER NAME /4k/dal)() IVCk(v► LLL, <br /> IBASIC BID ITEMS <br /> I Item Total <br /> # Ref Spec Plan Unit Item Description Unit Cost Total Amount <br /> Qty <br /> I1 1-04.4(1) 1.0 F.A. MINOR CHANGE $ 25,000.00 $ 25,000.00 <br /> I1-05.18 SP 1.0 L.S. RECORD DRAWINGS $ 5,000.00 $ 5,000.00 <br /> (MINIMUM BID) <br /> 1 <br /> 3 1-07.15 1.0 L.S. SPCC PLAN $ id 0 0 DC) $ Zdc 0 00 <br /> I e (. <br /> 4 1-09.7 1.0 L.S. MOBILIZATION $8e 000 CO $ 8,&000 do <br /> I <br /> 5 1-10 1.0 L.S. PROJECT TEMPORARY $ r 30 600 00 $14 O( odd . 00 <br /> i <br /> TRAFFIC CONTROL <br /> 6 4-04 6.5 TON CRUSHED SURFACING $ 5o CIO $ 1)2T Ce3 <br /> TOP COURSE — -- <br /> 7 8-01 1.0 L.S. EROSION/WATER $ �J/ 660 co $ 5160 dc) <br /> POLLUTION CONTROL <br /> Il8 8-01 22.0 EACH INLET PROTECTION $ to U Oc $ f D-0 00 <br /> I 9 8-07 315.0 L.F. PRECAST SLOPED $ u dU $ 22 j a 00 <br /> MOUNTABLE CURB <br /> I <br /> CITY OF EVERETT PROPOSAL <br /> FLEMING BICYCLE CORRIDOR 08/18/2022 <br /> IFEDERAL AID#CM-0420(027); COE#PW3767 Page 3 of 30 <br /> rnv;riarl to 1Th;1Aara F.xrhanna of WA. Inc. For usaae Conditions Agreement see www.bxwa.com - Always Verify Scale <br />
The URL can be used to link to this page
Your browser does not support the video tag.