My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Always Active Services 1/23/2023
>
Contracts
>
10 Years Then Transfer to State Archivist
>
2023
>
Always Active Services 1/23/2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/4/2024 3:35:38 PM
Creation date
1/27/2023 9:43:09 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Always Active Services
Approval Date
1/23/2023
Council Approval Date
12/21/2022
End Date
1/4/2023
Department
Public Works
Department Project Manager
Christina Curtis
Subject / Project Title
Fleming Bicycle Corridor
Public Works WO Number
PW3767
Tracking Number
0003556
Total Compensation
$473,273.00
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
376
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> I <br /> BASIC BID ITEMS <br /> Item Total I <br /> Ref Spec Plan Unit Item Description Unit Cost Total Amount <br /> QTy I <br /> 10 8-21 SP 1.0 L.S. PERMANENT SIGNING $ 3qi No 00 $ -sq,do oc) <br /> I <br /> 11 8-22 SP 952.0 L.F. 4-INCH PLASTIC LINE $ 5 . IS $ 5, I 1 11 .00 <br /> I <br /> 12 8-22 SP 400.0 L.F. 8-INCH PLASTIC LINE $ B 50 $ J H vv C d <br /> 1 <br /> 13 8-22 SP 1.0 EACH PLASTIC BICYCLE LANE $ S 00 $ 5-1 c .0 Cl <br /> SYMBOL — — <br /> PLASTIC BICYCLE LANE <br /> 14 8-22 SP 2.0 EACH SYMBOL WITH GREEN $ 2) 7 S .co $ (7 Sa .00 I <br /> BACKGROUND <br /> 15 8-22 SP 54.0 EACH PLASTIC SHARROW $ LBO d0 $ /�s, Z2d d° <br /> STRAIGHT — <br /> 16 8-22 SP 2.0 EACH PLASTIC RIGHT TURN $ 12c06 ad $ 2 I CCI CO I <br /> SHARROW — <br /> 17 8-22 SP 3.0 EACH PLASTIC LEFT TURN $ (26 ad $ ?J�QC 00 I <br /> SHARROW — — <br /> 18 8-22 SP 2.0 EACH PLASTIC JOG RIGHT $ /2 Cy"6 l $ V-I C Cl do I <br /> SHARROW — — <br /> 19 8-22 SP 2.0 EACH PLASTIC JOG LEFT $ f 2 0 e d $ L-I 0 d , a d I <br /> SHARROW <br /> PLASTIC SHARROW (� u I <br /> �7� <br /> 20 8-22 SP 12.0 EACH STRAIGHT WITH $ 1 -t11 1 .Q" $ e q(W " I QU <br /> BRACKETS <br /> 1 <br /> I <br /> I <br /> CITY OF EVERETT PROPOSAL <br /> FLEMING BICYCLE CORRIDOR 08/18/2022 <br /> FEDERAL AID#CM-0420(027);COE#PW3767 Page 4 of 30 I <br /> rovided to Builders Exchanae of WA. Inc. For usage Conditions ArrrPPmPnt S3PP www h,rwa rnm - Al,.ravc vo,-ifs, cr>>P <br />
The URL can be used to link to this page
Your browser does not support the video tag.