Laserfiche WebLink
I <br /> I1 PROJECT SPECIAL PROVISIONS CONTENTS <br /> 2 <br /> I3 INTRODUCTION 1 <br /> 4 SPECIAL PROVISIONS <br /> I5 DIVISION 1 <br /> 6 GENERAL REQUIREMENTS <br /> I7 DESCRIPTION OF WORK 1 <br /> 8 1-01.3 Definitions 2 <br /> 1 9 1-02 BID PROCEDURES AND CONDITIONS 4 <br /> 10 1-02.2 Plans and Specifications 4 <br /> I11 1-02.4 Examination of Plans, Specifications and Site of Work 4 <br /> 12 1-02.5 Proposal Forms 5 <br /> I 13 1-02.6 Preparation of Proposal 5 <br /> 14 1-02.6(1) Recycled Materials Proposal 6 <br /> I <br /> 15 1-02.7 Bid Deposit 7 <br /> 16 1-02.9 Delivery of Proposal 7 <br /> 17 1-02.10 Withdrawing, Revising, or Supplementing Proposal 9 <br /> I18 1-02.12 Public Opening of Proposals 9 <br /> 19 1-02.13 Irregular Proposals 9 <br /> I <br /> 20 1-02.14 Disqualification of Bidders 10 <br /> 21 1-02.15 Pre Award Information 11 <br /> I22 1-03.1 Consideration of Bids 11 <br /> 23 1-03.1(1) Identical Bid Totals 12 <br /> I 24 1-03.3 Execution of Contract 12 <br /> 25 1-03.4 Contract Bond 13 <br /> I 26 1-03.7 Judicial Review 14 <br /> 27 1-04.2 Coordination of Contract Documents, Plans, Special Provisions, 14 <br /> 28 1-05 CONTROL OF WORK 14 <br /> I29 1-05.7 Removal of Defective and Unauthorized Work 14 <br /> 30 1-05.11 Final Inspection 15 <br /> I31 1-05.13 Superintendents, Labor and Equipment of Contractor 17 <br /> 32 1-05.14 Cooperation With Other Contractors 17 <br /> I33 1-05.15 Method of Serving Notices 17 <br /> IFLEMING BICYCLE CORRIDOR <br /> FEDERAL AID#CM-0420(027) <br /> I <br /> COE#PW3767 A <br />