Laserfiche WebLink
PAGE I <br /> 1 1-05.16 Water and Power 17 I <br /> 2 1-05.18 Record Drawings 18 <br /> 3 1-06 CONTROL OF MATERIAL 20 I <br /> 4 Build America/Buy America 20 <br /> 5 1-06.6 Recycled Materials 23 , <br /> 6 1-07 LEGAL RELATIONS AND RESPONSIBILITIES TO THE PUBLIC 23 <br /> 7 1-07.1 Laws to be Observed 23 <br /> 8 1-07.1(2) Health and Safety 24 I <br /> 9 1-07.2 State Sales Tax 24 <br /> 10 1-07.7 Load Limits 26 I <br /> 11 1-07.9 Wages 26 <br /> 12 1-07.9.1 General 26 I <br /> 13 1-07.9.2 Posting Notices 26 <br /> 14 1-07.9.5 Required Documents 26 <br /> 15 1-07.11 Requirements for Nondiscrimination 27 <br /> 16 Disadvantaged Business Enterprise Condition of Award Participation 35 , <br /> 17 1-07.12 Federal Agency Inspection 49 <br /> 18 Required Federal Aid Provisions 49 <br /> 19 1-07.17 Utilities and Similar Facilities 49 <br /> 20 1-07.18 Public Liability and Property Damage Insurance 51 <br /> 21 Excess or Umbrella Liability 55 I <br /> 22 Pollution Liability 55 <br /> 23 1-07.23 Public Convenience and Safety 55 I <br /> 24 1-07.23(1) Construction Under Traffic 55 <br /> 25 1-07.24 Rights of Way 57 I <br /> 26 1-08 PROSECUTION AND PROGRESS 58 <br /> 27 1-08.0 Preliminary Matters 58 I <br /> 28 Preconstruction Conference 59 <br /> 29 Hours of Work 59 <br /> 30 1-08.1 Subcontracting 60 I <br /> 31 1-08.3 Progress Schedule 61 <br /> 32 Type A Progress Schedule 61 I <br /> 33 1-08.4 Prosecution of Work 61 <br /> 34 Notice to Proceed and Prosecution of Work 61 I <br /> I <br /> FLEMING BICYCLE CORRIDOR <br /> FEDERAL AID#CM-0420(027) <br /> COE#PW3767 B I <br />