Laserfiche WebLink
1111 <br /> PAGE <br /> I <br /> 1 1-08.5 Time for Completion 62 <br /> 2 1-08.9 Liquidated Damages 63 <br /> I 3 1-09 MEASUREMENT AND PAYMENT 64 <br /> 4 1-09.2(5) Measurement 64 <br /> I <br /> 5 1-09.6 Force Account 64 <br /> 6 1-09.9 Payments 64 <br /> 7 Retainage 66 <br /> I8 1-09.11(3)Time Limitation and Jurisdiction 66 <br /> 9 1-09.13(3)Arbitration General 67 <br /> 1 10 1-09.13(4) Venue for Litigation 67 <br /> 11 <br /> 12 DIVISION 4 <br /> 13 Bases <br /> I14 4-04 BALLAST AND CRUSH SURFACING 70 <br /> 15 <br /> I <br /> 16 DIVISION 8 <br /> 17 MISCELLANEOUS CONSTRUCTION <br /> I 18 8-21 PERMANENT SIGNING 74 <br /> 19 8-22 PAVEMENT MARKING 75 <br /> 20 8-26 POLYMER CEMENT SURFACING WITH HEXAGON PATTERN FOR GREEN <br /> 1 21 COLORED BICYCLE LANES 76 <br /> 22 8-27 TEXTURED AND PIGMENTED CEMENT CONC. 81 <br /> II <br /> 23 8-32 ELECTRONIC FILES 82 <br /> 24 <br /> I <br /> 1 <br /> I <br /> I <br /> IFLEMING BICYCLE CORRIDOR <br /> FEDERAL AID#CM-0420(027) <br /> 1 <br /> COE#PW3767 C <br />