Laserfiche WebLink
I <br /> I <br /> 2 1-02.6(1) Recycled Materials Proposal <br /> 3 (January 4, 2016 APWA GSP) <br /> 4 <br /> I <br /> 5 6 The Bidder shall submit with the Bid, its proposal for incorporating recycled materials into <br /> the project, using the form provided in the Contract Provisions. <br /> 7 <br /> I 8 1-02.7.RTF <br /> 9 1-02.7 Bid Deposit <br /> 10 (March 8, 2013 APWA GSP)Iii <br /> 12 Supplement this section with the following: <br /> 13 <br /> 14 Bid bonds shall contain the following: <br /> I15 1. Contracting Agency-assigned number for the project; <br /> 16 2. Name of the project; <br /> I <br /> 17 3. The Contracting Agency named as obligee; <br /> 18 4. The amount of the bid bond stated either as a dollar figure or as a percentage which <br /> 19 represents five percent of the maximum bid amount that could be awarded; <br /> I 20 5. Signature of the bidder's officer empowered to sign official statements. The signature <br /> 21 of the person authorized to submit the bid should agree with the signature on the <br /> 22 bond, and the title of the person must accompany the said signature; <br /> I23 6. The signature of the surety's officer empowered to sign the bond and the power of <br /> 24 attorney. <br /> 25 <br /> I <br /> 26 If so stated in the Contract Provisions, bidder must use the bond form included in the <br /> 27 Contract Provisions. <br /> 28 <br /> I 29 If so stated in the Contract Provisions, cash will not be accepted for a bid deposit. <br /> 30 <br /> 31 1-02.9.OptionA.RTF <br /> I 32 1-02.9 Delivery of Proposal <br /> 33 (January 19, 2022 APWA GSP, Option A) <br /> 34 <br /> I35 Delete this section and replace it with the following: <br /> 36 <br /> 37 Each Proposal shall be submitted in a sealed envelope, with the Project Name and <br /> 38 Project Number as stated in the Call for Bids clearly marked on the outside of the <br /> I 39 envelope, or as otherwise required in the Bid Documents, to ensure proper handling and <br /> 40 delivery. <br /> 41 <br /> I <br /> 42 43 To be considered responsive on a FHWA-funded project, the Bidder may be required to <br /> submit the following items, as required by Section 1-02.6: <br /> 44 <br /> I <br /> 45 • DBE Utilization Certification (WSDOT 272-056) <br /> 46 • DBE Written Confirmation Document (WSDOT 422-031)from each DBE firm <br /> 47 listed on the Bidder's completed DBE Utilization Certification <br /> I <br /> 48 49 • Good Faith Effort (GFE) Documentation <br /> • DBE Bid Item Breakdown (WSDOT 272-054) <br /> I <br /> FLEMING BICYCLE CORRIDOR 7 <br /> PW 3767 November 15, 2022 <br />