My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Always Active Services 1/23/2023
>
Contracts
>
10 Years Then Transfer to State Archivist
>
2023
>
Always Active Services 1/23/2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/4/2024 3:35:38 PM
Creation date
1/27/2023 9:43:09 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Always Active Services
Approval Date
1/23/2023
Council Approval Date
12/21/2022
End Date
1/4/2023
Department
Public Works
Department Project Manager
Christina Curtis
Subject / Project Title
Fleming Bicycle Corridor
Public Works WO Number
PW3767
Tracking Number
0003556
Total Compensation
$473,273.00
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
376
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> 1 • DBE Trucking Credit Form (WSDOT 272-058) <br /> 2 <br /> 3 DBE Utilization Certification <br /> 4 The DBE Utilization Certification shall be received at the same location and no later than <br /> 5 the time required for delivery of the Proposal. The Contracting Agency will not open or I <br /> 6 consider any Proposal when the DBE Utilization Certification is received after the time <br /> 7 specified for receipt of Proposals or received in a location other than that specified for <br /> 8 receipt of Proposals. The DBE Utilization Certification may be submitted in the same I <br /> 9 envelope as the Bid deposit. <br /> 10 <br /> 11 DBE Written Confirmation and/or GFE Documentation I <br /> 12 The DBE Written Confirmation Documents and/or GFE Documents are not required to <br /> 13 be submitted with the Proposal. The DBE Written Confirmation Document(s) and/or GFE <br /> 14 (if any) shall be received either with the Bid Proposal or as a Supplement to the Bid. The <br /> 15 documents shall be received no later than 48 hours (not including Saturdays, Sundays I <br /> 16 and Holidays) after the time for delivery of the Proposal. To be considered responsive, <br /> 17 Bidders shall submit Written Confirmation Documentation from each DBE firm listed on <br /> 18 the Bidder's completed DBE Utilization Certification and/or the GFE as required by I <br /> 19 Section 1-02.6. <br /> 20 <br /> 21 DBE Bid Item Breakdown and DBE Trucking Credit Form I <br /> 22 The DBE Bid Item Breakdown and the DBE Trucking Credit Forms (if applicable) shall be <br /> 23 received either with the Bid Proposal or as a Supplement to the Bid. The documents <br /> 24 shall be received no later than 48 hours (not including Saturdays, Sundays and Holidays) I <br /> 25 after the time for delivery of the Proposal. To be considered responsive, Bidders shall <br /> 26 submit a completed DBE Bid Item Breakdown and a DBE Trucking Credit Form for each <br /> 27 DBE Trucking firm listed on the DBE Utilization Certification, however, minor errors and <br /> 28 corrections to DBE Bid Item Breakdown or DBE Trucking Credit Forms will be returned I <br /> 29 for correction for a period up to five calendar days (not including Saturdays, Sundays <br /> 30 and Holidays) after the time for delivery of the Proposal. A DBE Bid Item Breakdown or <br /> 31 DBE Trucking Credit Forms that are still incorrect after the correction period will be I <br /> 32 determined to be non-responsive. <br /> 33 <br /> 34 Proposals that are received as required will be publicly opened and read as specified in I <br /> 35 Section 1-02.12. The Contracting Agency will not open or consider any Bid Proposal that <br /> 36 is received after the time specified in the Call for Bids for receipt of Bid Proposals, or <br /> 37 received in a location other than that specified in the Call for Bids. The Contracting I <br /> 38 Agency will not open or consider any"Supplemental Information" (DBE confirmations, or <br /> 39 GFE documentation) that is received after the time specified above, or received in a <br /> 40 location other than that specified in the Call for Bids. <br /> 41 I <br /> 42 If an emergency or unanticipated event interrupts normal work processes of the <br /> 43 Contracting Agency so that Proposals cannot be received at the office designated for <br /> 44 receipt of bids as specified in Section 1-02.12 the time specified for receipt of the I <br /> 45 Proposal will be deemed to be extended to the same time of day specified in the <br /> 46 solicitation on the first work day on which the normal work processes of the Contracting <br /> 47 Agency resume. I <br /> 48 <br /> 49 <br /> 50 <br /> 51 I <br /> I <br /> FLEMING BICYCLE CORRIDOR 8 <br /> PW 3767 November 15, 2022 I <br />
The URL can be used to link to this page
Your browser does not support the video tag.