My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Always Active Services 1/23/2023
>
Contracts
>
10 Years Then Transfer to State Archivist
>
2023
>
Always Active Services 1/23/2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/4/2024 3:35:38 PM
Creation date
1/27/2023 9:43:09 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Always Active Services
Approval Date
1/23/2023
Council Approval Date
12/21/2022
End Date
1/4/2023
Department
Public Works
Department Project Manager
Christina Curtis
Subject / Project Title
Fleming Bicycle Corridor
Public Works WO Number
PW3767
Tracking Number
0003556
Total Compensation
$473,273.00
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
376
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> 1 1-03.1.RTF <br /> 2 1-03.1 Consideration of Bids I <br /> 3 (January 23, 2006 APWA GSP) <br /> 4 <br /> 5 Revise the first paragraph to read: <br /> 6 <br /> 7 After opening and reading proposals, the Contracting Agency will check them for <br /> 8 correctness of extensions of the prices per unit and the total price. If a discrepancy exists <br /> 9 between the price per unit and the extended amount of any bid item, the price per unit will <br /> 10 control. If a minimum bid amount has been established for any item and the bidder's unit <br /> 11 or lump sum price is less than the minimum specified amount, the Contracting Agency will <br /> 12 unilaterally revise the unit or lump sum price, to the minimum specified amount and <br /> 13 recalculate the extension. The total of extensions, corrected where necessary, including <br /> 14 sales taxes where applicable and such additives and/or alternates as selected by the <br /> 15 Contracting Agency, will be used by the Contracting Agency for award purposes and to fix I <br /> 16 the Awarded Contract Price amount and the amount of the contract bond. <br /> 17 <br /> 18 1-03.1(1).RTF <br /> 19 1-03.1(1) Identical Bid Totals <br /> 20 (January 4, 2016 APWA GSP) <br /> 21 <br /> 22 Revise this section to read: <br /> 23 <br /> 24 After opening Bids, if two or more lowest responsive Bid totals are exactly equal, then <br /> 25 the tie-breaker will be the Bidder with an equal lowest bid, that proposed to use the <br /> 26 highest percentage of recycled materials in the Project, per the form submitted with the <br /> 27 Bid Proposal. If those percentages are also exactly equal, then the tie-breaker will be <br /> 28 determined by drawing as follows: Two or more slips of paper will be marked as follows: <br /> 29 one marked "Winner" and the other(s) marked "unsuccessful". The slips will be folded to <br /> 30 make the marking unseen. The slips will be placed inside a box. One authorized <br /> 31 representative of each Bidder shall draw a slip from the box. Bidders shall draw in <br /> 32 alphabetic order by the name of the firm as registered with the Washington State <br /> 33 Department of Licensing. The slips shall be unfolded and the firm with the slip marked <br /> 34 "Winner" will be determined to be the successful Bidder and eligible for Award of the <br /> 35 Contract. Only those Bidders who submitted a Bid total that is exactly equal to the lowest <br /> 36 responsive Bid, and with a proposed recycled m aterials percentage that is exactly equal <br /> 37 to the highest proposed recycled materials amount, are eligible to draw. <br /> 38 <br /> 39 COE 1-03.3.RTF <br /> 40 1-03.3 Execution of Contract <br /> 41 (October 1, 2005 APWA GSP) <br /> 42 <br /> 43 Revise this section to read: <br /> 44 <br /> 45 Copies of the Contract Provisions, including the unsigned Form of Contract, will be <br /> 46 available for signature by the successful bidder on the first business day following award. <br /> 47 The number of copies to be executed by the Contractor will be determined by the <br /> 48 Contracting Agency. <br /> 49 <br /> 50 Within 20 calendar days after the award date, the successful bidder shall return <br /> 51 the signed Contracting Agency-prepared contract, an insurance certification as required <br /> I <br /> FLEMING BICYCLE CORRIDOR 12 <br /> PW 3767 November 15, 2022 <br />
The URL can be used to link to this page
Your browser does not support the video tag.