Laserfiche WebLink
I <br /> 1 <br /> I 2 1-02.14.Option.A.RTF <br /> 3 1-02.14 Disqualification of Bidders <br /> 4 (May 17, 2018 APWA GSP, Option A) <br /> I 5 <br /> 6 Delete this section and replace it with the following: <br /> 7 <br /> I 8 A Bidder will be deemed not responsible if the Bidder does not meet the mandatory bidder <br /> 9 responsibility criteria in RCW 39.04.350(1), as amended. <br /> 10 <br /> 11 The Contracting Agency will verify that the Bidder meets the mandatory bidder <br /> 12 responsibility criteria in RCW 39.04.350(1). To assess bidder responsibility, the <br /> 13 Contracting Agency reserves the right to request documentation as needed from the <br /> 14 Bidder and third parties concerning the Bidder's compliance with the mandatory bidder <br /> 15 responsibility criteria. <br /> 16 <br /> 17 If the Contracting Agency determines the Bidder does not meet the mandatory bidder <br /> I 18 responsibility criteria in RCW 39.04.350(1) and is therefore not a responsible Bidder, the <br /> 19 Contracting Agency shall notify the Bidder in writing, with the reasons for its determination. <br /> 20 If the Bidder disagrees with this determination, it may appeal the determination within two <br /> I 21 (2) business days of the Contracting Agency's determination by presenting its appeal and <br /> 22 any additional information to the Contracting Agency. The Contracting Agency will <br /> 23 consider the appeal and any additional information before issuing its final determination. <br /> I 24 If the final determination affirms that the Bidder is not responsible, the Contracting Agency <br /> 25 will not execute a contract with any other Bidder until at least two business days after the <br /> 26 Bidder determined to be not responsible has received the Contracting Agency's final <br /> 27 determination. <br /> I 28 <br /> 29 1-02.15.RTF <br /> 30 1-02.15 Pre Award Information <br /> II 31 (August 14, 2013 APWA GSP) <br /> 32 <br /> 33 Revise this section to read: <br /> I 34 <br /> 35 Before awarding any contract, the Contracting Agency may require one or more of these <br /> 36 items or actions of the apparent lowest responsible bidder: <br /> I 37 1. A complete statement of the origin, composition, and manufacture of any or all <br /> 38 materials to be used, <br /> 39 2. Samples of these materials for quality and fitness tests, <br /> I 40 3. A progress schedule (in a form the Contracting Agency requires) showing the order <br /> 41 of and time required for the various phases of the work, <br /> 42 4. A breakdown of costs assigned to any bid item, <br /> I 43 5. Attendance at a conference with the Engineer or representatives of the Engineer, <br /> 44 6. Obtain, and furnish a copy of, a business license to do business in the city or county <br /> 45 where the work is located. <br /> I 46 7. Any other information or action taken that is deemed necessary to ensure that the <br /> 47 bidder is the lowest responsible bidder. <br /> 48 <br /> I49 <br /> I <br /> FLEMING BICYCLE CORRIDOR 11 <br /> IPW 3767 November 15,2022 <br />