Laserfiche WebLink
I <br /> 1 If the sources of materials provided by the Contractor necessitates hauling over roads <br /> 2 other than State Highways, the Contractor shall, at the Contractor's expense, make all 1 <br /> 3 arrangements for the use of the haul routes. <br /> 4 <br /> 5 1-07.9.GR1 <br /> 6 Wages <br /> 7 <br /> 8 1-07.9(1).GR1 <br /> 9 General <br /> 10 <br /> 11 1-07.9(1),INST1.GR1 <br /> 12 Section 1-07.9(1) is supplemented with the following: <br /> 13 <br /> 14 1-07.9(1).OPT1.GR1 <br /> 15 (January 10, 2022) <br /> 16 The Federal wage rates incorporated in this contract have been established by the <br /> 17 Secretary of Labor under United States Department of Labor General Decision No. <br /> 18 WA20220001. <br /> 19 <br /> 20 The State rates incorporated in this contract are applicable to all construction <br /> 21 activities associated with this contract. <br /> 22 <br /> 23 <br /> 24 1-07.9(2).GR1 <br /> 25 Posting Notices <br /> 26 <br /> 27 1-07.9(2),INST1.GR1 <br /> 28 Item number 11 in Section 1-07.9(2) is revised to read: <br /> 29 <br /> 30 1-07.9(2).OPT1.2023.GR1 <br /> 31 (January 10, 2022) I <br /> 32 11. F700-074-000—Your Rights as a Worker in Washington State by Washington <br /> 33 State Department of Labor and Industries (L&I). Post on all projects. <br /> 34 <br /> 35 1-07.9(5).RTF <br /> 36 1-07.9(5) Required Documents <br /> 37 (January 3, 2020 APWA GSP) <br /> 38 <br /> 39 Delete this section and replace it with the following: <br /> 40 <br /> 41 General <br /> 42 All "Statements of Intent to Pay Prevailing Wages", "Affidavits of Wages Paid"and Certified <br /> 43 Payrolls, including a signed Statement of Compliance for Federal-aid projects, shall be <br /> 44 submitted to the Engineer and the State L&I online Prevailing Wage Intent & Affidavit <br /> 45 (PWIA) system. <br /> 46 <br /> 47 Intents and Affidavits <br /> 48 On forms provided by the Industrial Statistician of State L&I, the Contractor shall submit to <br /> 49 the Engineer the following for themselves and for each firm covered under RCW 39.12 <br /> 50 that will or has provided Work and materials for the Contract: <br /> 51 <br /> I <br /> FLEMING BICYCLE CORRIDOR 26 <br /> PW 3767 November 15, 2022 I <br />