My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Always Active Services 1/23/2023
>
Contracts
>
10 Years Then Transfer to State Archivist
>
2023
>
Always Active Services 1/23/2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/4/2024 3:35:38 PM
Creation date
1/27/2023 9:43:09 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Always Active Services
Approval Date
1/23/2023
Council Approval Date
12/21/2022
End Date
1/4/2023
Department
Public Works
Department Project Manager
Christina Curtis
Subject / Project Title
Fleming Bicycle Corridor
Public Works WO Number
PW3767
Tracking Number
0003556
Total Compensation
$473,273.00
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
376
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> 1 The following documents must be received by the Project Engineer prior to <br /> 1 2 establishing a completion date: <br /> 3 a. Certified Payrolls (per Section 1-07.9(5)). <br /> 4 b. Material Acceptance Certification Documents <br /> I5 c. Monthly Reports of Amounts Credited as DBE Participation, as required by the <br /> 6 Contract Provisions. <br /> 7 d. Final Contract Voucher Certification <br /> I8 e. Copies of the approved "Affidavit of Prevailing Wages Paid" for the Contractor <br /> 9 and all Subcontractors <br /> 10 f. A copy of the Notice of Termination sent to the Washington State Department of <br /> 11 Ecology (Ecology); the elapse of 30 calendar days from the date of receipt of the <br /> 12 Notice of Termination by Ecology; and no rejection of the Notice of Termination <br /> 13 by Ecology. This requirement will not apply if the Construction Stormwater <br /> I 14 General Permit is transferred back to the Contracting Agency in accordance with <br /> 15 Section 8-01.3(16). <br /> 16 g. Property owner releases per Section 1-07.24 <br /> I 17 <br /> 18 1-08.9.OptionA.RTF <br /> 19 1-08.9 Liquidated Damages <br /> I 20 (March 3, 2021 APWA GSP, Option A) <br /> 21 <br /> 22 Replace Section 1-08.9 with the following: <br /> I23 <br /> 24 Time is of the essence of the Contract. Delays inconvenience the traveling public, <br /> 25 obstruct traffic, interfere with and delay commerce, and increase risk to Highway users. <br /> I <br /> 26 Delays also cost tax payers undue sums of money, adding time needed for <br /> 27 administration, engineering, inspection, and supervision. <br /> 28 <br /> I 29 Accordingly, the Contractor agrees: <br /> 30 <br /> 31 1. To pay liquidated damages in the amount of*** $5,000 ***for each working <br /> 32 day beyond the number of working days established for Physical Completion, <br /> I 33 and <br /> 34 <br /> 35 2. To authorize the Engineer to deduct these liquidated damages from any <br /> I 36 money due or coming due to the Contractor. <br /> 37 <br /> 38 When the Contract Work has progressed to Substantial Completion as defined in the <br /> 39 Contract, the Engineer may determine the Contract Work is Substantially Complete. The <br /> 40 Engineer will notify the Contractor in writing of the Substantial Completion Date. For <br /> 41 overruns in Contract time occurring after the date so established, liquidated damages <br /> I <br /> 42 43 identified above will not apply. For overruns in Contract time occurring after the <br /> Substantial Completion Date, liquidated damages shall be assessed on the basis of <br /> 44 direct engineering and related costs assignable to the project until the actual Physical <br /> I 45 Completion Date of all the Contract Work. The Contractor shall complete the remaining <br /> 46 Work as promptly as possible. Upon request by the Project Engineer, the Contractor <br /> 47 shall furnish a written schedule for completing the physical Work on the Contract. <br /> I48 <br /> I <br /> FLEMING BICYCLE CORRIDOR 63 <br /> PW 3767 November 15,2022 <br />
The URL can be used to link to this page
Your browser does not support the video tag.